PURE PROMOTING THE USE OF PHOTOVOLTAIC SYSTEMS IN THE URBAN ENVIRONMENT THROUGH DEMO RELAY NODES EIE/05/051/SI2.420200 From 01/01/2006 to 31/12/2008 January.

Slides:



Advertisements
Similar presentations
Communication, Exchange and dissemination of good practices.
Advertisements

FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINIBILITY PLAN Budapest, June 2007.
Info Day on New Calls and Partner Café 8 September 2010 in Bruxelles Call for Proposals on Targeted Analyses.
European Conference GEO welcomes FP7 Constanta, Romania, 15 th September 2006 ERA ENV – Integration of Associated Candidate Countries and New EU Member.
Erasmus Mundus Action 3. 2 REALITY Research Cooperation of European and Latin America Universities in Innovation Technologies –
S3 Project aim The main goal, thus expected result, of the S3 project would be to strengthen tools used for Structural Fund policies (SF), through the.
Info Day - Promoting FP7 – Theme 1 HealthFeb. 14th, 2007, Bucharest Building on the success of SMEs go Life Sciences SMEs go Health.
The SPECIAL Project (Spatial Planning & Energy for Communities In All Landscapes) Contract No: IEE/12/762 8 March 2013 – 7 March 2016 June 2013.
C-LIEGE Contract N°: IEE/10/154/SI Project duration: from 1 st June 2011 to 30 st November 2013 Date of creation: 4 th July 2011 Clean Last mile.
GREENFOODS - Towards Zero fossil CO 2 emission in the European food & beverage industry GREENFOODS Contract number:IEE/12/723.SI Project duration:28.
Buildup Skills Malta Contract number: IEE/12/BWI/455-SI Project duration: 18 months June 1012 – December 2013.
Renovation through quality supply chains and energy performance certification standards EU programme supported by Intelligent Energy Europe.
Duration: 01/07/09-29/02/2012 Contract number IEE/08/591/S PV LEGAL Reduction of legal-administrative barriers for PV system installations in.
Warsaw Innovation Potential City. Project „Warsaw Innovation Potential City” (POKL 8.2.1) Partnership project realised by the European Fund Office (Warsaw.
 For the implementation of the EPBD and the targets optimal design strategy is needed for energy efficient buildings by applying an integrated.
Project Overview. Content Project Rational Aim and Objectives Partners and Focus Groups Project Overview Project Outputs Conclusions.
Contract Nr.: EIE/07/259/SI December 2010 PASS-NET Establishment of a Co-operation Network of Passive House Promoters Project Period: 11/2007 –
8/29/2015National TEMPUS Office- Syria1 TEMPUS in Syria Review of the Programme Dr Rami Ayoubi Coordinator National Tempus Office-Syria
V.I.D.E.O. Video-CVto Increase and Develop Employment Opportunities THE RESEARCH ACTIVITIES OF THE V.I.D.E.O. PROJECT Marco Merlini First Transnational.
STORIES 3 rd Workshop, Dubrovnik, 2 October 2009 Addressing barriers to storage technologies for increasing the penetration of intermittent energy sources.
Auditing and Certification Scheme to increase the quality of Sustainable Urban Mobility Plans in Cities Organisation Surname, Name Meeting / Conference.
SCORE project “Virtual community of the key stakeholders to assess and promote innovative technologies”
1 EU Funds for Improvement of Servcies Provided by the Municipalities Future scope of co-operation with EU Structural Funds Thomas Wobben Representation.
WP1 presentation Christian Jagersma Bucharest, 1-4 March 2010 Agentschap NL (NL Agency)
Co-funded by the European Union "This project has been funded with support from the European Commission. This publication reflects the views only of the.
World Marketing Conference January 12, An initiative of KKL-JNF  Nurture a KKL-JNF young, professional, sustainability-oriented leadership 
5 EURES n:o EIE/04/086/S Five European RES Heat pilots (”5 EURES”) EIE January 2005-December 2007(36 months) Project is supported by.
The INTENSE project: Improving Energy Efficiency in the Building Sector Workshop: Sustainable Energy Action Plans in Latvia: Regional Cooperation,
European Solar Days: a successful awareness raising initiative Roger Hackstock Austria Solar.
1 The Project Circle, January 27, 2005 How can the NCP support you? Mária Búciová, IST NCP Slovak University of Technology in Bratislava, Slovakia.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINABILITY STRATEGY Florence, January.
FORESTUR: “Tailored training for professionals in the rural tourist sector” ES/06/B/F/PP VALORISATION & SUSTAINABILITY STRATEGY Sucevita, May 2008.
IEEA Contractors Meeting December 4-5, 2006 Jan Erik Nielsen ESTIF Technical Consultant SolarKey Int. A large open EU market for solar thermal quality.
Christiane Egger O.Ö. Energiesparverband Landstraße 45 A-4020 Linz, Austria T: en ESV-Design El.
Supported by EUROPEAN NETWORK FOR THE ENERGY PERFORMANCE CERTIFICATION OF BUILDINGS (IEE/08/599/SI )
Eurostat’s Technical Co-operation in the SPECA Region Mariana Kotzeva, Eurostat Adviser Hors Classe 7 th SPECA Project Working Group on Statistics, Issyk-Kul,
Green Partnerships Local Partnerships for Greener Cities and Regions 5 th Steering Committee meeting Cyprus, Cyprus 2014 Theocharis Tsoutsos, Assoc.
“BuildUpSkills II, ENERGOTRAIN project goals and activities in Lithuania.” Dr. Vaidotas Šarka Lithuanian Builders Association Lithuanian Construction.
Improving competences and skills of the building workforce in Lithuania related to nearly zero energy buildings Acronym of the project: BUILD UP Skills.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
“Focusing on Europe” Maximising European Opportunities & Funds Laura Leonard European Manager NI Best Practice Scheme Belfast City Council Best Practice.
Solar thermal applications in Eastern Europe with Guaranteed Solar Results Solar thermal applications in EASTern Europe with Guaranteed Solar Results EAST-GSR.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
Renovation through quality supply chains and energy performance certification standards REQUEST EU programme supported by Intelligent Energy Europe IEE/09/870/SI
Regulations of Geothermal HP systems at local and regional level in Europe Contract nº: IEE/11/041 01/05/2012 to 30/04/2015updated: March 2014.
SEA in China A Contribution to Environmental Policy Integration? Holger Dalkmann, Zhou Yun, Daniel Bongardt IAIA Conference Seoul, 05 June 2007.
DonQ – Air Project presentation. DonQ-Air – About project Objective: Objective: to encourage R&D activities in the aeronautic-related.
EIPA CAF Resource Centre CAF CAF activities – state of affairs Patrick Staes & Ann Stoffels EIPA CAF Resource Centre Berlin, 8-9 February 2007.
“Memorandum of Understanding (MoU) between MARIE, GRASP and PEEBPE Projects” Presented by: Thanos Papotis (EUROCONSULTANTS S.A), Technical Consultant of.
Malorie CLERMONT Local coordination & Hespul RENAISSANCE LYON WP Progress and Plans WP 4: Dissemination and Promotion.
Supporting Development of Photovoltaics in the European Union New Member States Network IEE/07/809/SI Duration: Oct – Sept Coordinator:
The Enterprise Europe Network Brigitte Tanti Malta Enterprise European Commission Enterprise and Industry.
Your Logo Identification, Preparation and Dissemination of Hydrogen Safety Facts to Regulators and Public Safety Officials Presented by Christian Machens.
Contract Number: IEE/11/885/SI PInE Project Duration: from to – Date of creation: PI N E P ROMOTING I NDUSTRIAL.
MUSEC-EIE/06/024/SI SUPPORTED BY Contract number: EIE/06/024/SI Project duration: December 2006 – June 2009 (30 months) MUSEC.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
Empowerment of practitioners to achieve energy savings in urban transport Empowerment of practitioners to achieve energy savings in urban transport IEE/10/274/SI ,
„ SMEs go LifeSciences“ is co-funded by the European Commission Activities supporting SME participation in the instruments particularly Integrated Projects.
Contract No. IEE/11/826/SI Duration: From 03/05/ /10/2014 ENergy efficiency in City LOgistics Services for small and mid-sized European historic.
Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.
The 7th Framework Programme for Research: Strategy of international cooperation activities Robert Burmanjer Head of Unit, “International Scientific Cooperation.
CASCADE Cities exchanging on local energy leadership June 2011 – May 2014 Contract number: IEE/10/217/SI Last update: December 2011.
2012 European Year of Active Aging and Intergenerational Solidarity Imserso Spanish Coordination Body.
Exploitation means to use and benefit from something. For Erasmus+ this means maximising the potential of the funded activities, so that the results are.
Vocational Training Contribution in Energy Efficiency of Building Sector Dr. Emmanuel Karapidakis.
DIGITAL INCLUSION PROJECT
DIGITAL INCLUSION PROJECT
Civil Protection Financial Instrument – Prevention Projects
Lavinia Andrei TERRA Mileniul III Foundation
EQAVET National Reference Point Slovakia
Presentation transcript:

PURE PROMOTING THE USE OF PHOTOVOLTAIC SYSTEMS IN THE URBAN ENVIRONMENT THROUGH DEMO RELAY NODES EIE/05/051/SI From 01/01/2006 to 31/12/2008 January 2009

2. PROJECT SUMMARY SPAIN PORTUGAL ITALY GREECE SLOVAK IA GERMANY PURE addresses the Promotion of Photovoltaic (PV) energy in the urban environment, mainly focused on the integration into buildings, particularly in those European countries characterized by a large solar potential and lack of PV installed capacity (Southern Europe). 7 partners from 6 EU countries (ES, DE, PO, SK, GR, IT). Main results: Set-up of the 5 PV-DRN in Europe. Participation/organisation of PURE partners in more than 30 regional, national and international events talking about BIPV. Analysis of Technical and Economic Solutions for Integration of PV into Buildings. Information about national legislation concerning PV as well as the implementation of 2002/91/EC Directive.

3. BACKGROUND Great differences between Southern Europe and Northern Europe countries regarding the solar radiation and the level of PV power installations Lack of basic information concerning technical and economic aspects of available solutions for BIPV products Lack of social awareness about the integration of RES into the cities and buildings in most of the EU countries. Delay in the implementation of EPBD In most of the countries, except for Spain. PURE solves the related problems and delays, and encourages the integration of PV into the building environment.

4. OBJECTIVES AND MAIN STEPS The planned activities are: Searching of information. Related to technical, economical and legislative aspects regarding integration of PV in the cities and EPBD. Design and set-up of the PV-DRNs. All the PV-DRN follow a common design although there are specific details in each. Dissemination activities. There are several ways Through the exploitation of the PV-DRN, with the organization of guided-visits, conferences and seminars on technical and legal framework aspects. Distributed dissemination and promotion activities (satellite actions), carried out outside the PV-DRN, the idea is to go near the target groups to make easier the attendance.

5. ACHIEVEMENTS/ RESULTS Set-up of 5 Photovoltaic Demo Relay Nodes (PV-DRN) in Spain, Portugal, Greece, Slovakia and Italy during 18 months. The availability of PVDRNs will be extended at least until June Exploitation of PV-DRNs through the organisation of guided visits, training courses, infodays, conferences, etc. to the demo areas (permanent exhibition, multimedia room, experimental area). 2 main publications, in 6 languages (EN, ES, GR, SK, PO, IT), Potential and benefits of BIPV. Available technical solutions and examples on BIPV systems. A CD-ROM, edited in 6 languages, with the most important contents of PURE project (available in the website). A Replication Plan about how this scheme could be replicated in the future from the point of view of the experienced participants of PURE project.

6. PARTNERSHIP TECNALIA - ROBOTIKER (Spain) EVE (Spain) Instituto Superior Tecnico (Portugal) Scheuten Solar (Germany) Provinzia de Savona (Italy) Slovak Innovative Energy Agency (Slovakia) Environmental Engineering Department- Technical University of Crete (Greece)

7. CONTACT Eduardo Román ROBOTIKER – Parq. Tecnologico Edif Zamudio. SPAIN Telephone: Fax: