Status of RF stations for NICA project MAC meeting 19-20 october 2015.

Slides:



Advertisements
Similar presentations
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
Advertisements

JINRs PARTICIPATION IN SIS100 & SIS300 JINRs PARTICIPATION IN SIS100 & SIS300 5 th WORKSHOP on the SCIENTIFIC COOPERATION between GERMAN RESEARCH CENTERS.
A.KOVALENKO SUPERCONDUCTING MAGNETS for NICA BOOSTER & COLLIDER NICA ROUND TABLE DISCUSSION - 3 JINR, Dubna, November 05, 2008.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
NICA INJECTOR Brief remarks on the status based on recent presentations and publications.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
1 Machine Advisory Committee Video-Conference JINR, Dubna May 20, 2009 Concept and Status of The NICA Project Nuclotron-based Ion Collider fAcility I.Meshkov.
Low Emittance RF Gun Developments for PAL-XFEL
E v3 aLIGO SEI Testing and Commissioning Overall Plan
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI 13-th CBM,
HV Electron Cooling System for NICA Collider
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
RF System for HESR Status report, January 2006 F. Etzkorn / A. Schnase, with help from S. An, K. Bongardt.
Preliminary results on simulation of fast-ion instability at 3 km LBNL damping ring 21 April 2005 Pohang Accelerator Laboratory Eun-San Kim.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
PHYSICAL PROJECT OF BOOSTER FOR NICA ACCELERATOR COMPLEX Alexey Tuzikov, Nikolay Agapov, Andrey Butenko, Alexey Eliseev, Viktor Karpinsky, Hamlet Khodzhibagiyan,
A.Kovalenko 2 nd Lab Directors Meeting, Protvino, January 15/16, 2008 FAIR: JINR EoI.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
Design and construction of Nuclotron-based Ion Collider fAcility (NICA) and Mixed Phase Detector (MPD) Design and construction of Nuclotron-based Ion Collider.
NICA start-up scenario + questions of instabilities A.Sidorin For NiCA team NICA Machine Advisory Committee at JINR (Dubna) October 19-20, 2015.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Status & Plans The CBM-MPD STS Consortium for CBM and NICA-MPD Projects Yuri Murin, JINR, Dubna JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP- GSI
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
 NICA is being constructed  For heavy ions we need very highluminosity level – 10 cm s  For keeping up such level we inevitably need cooling  Stochastic.
Progress of Bunched Beam Electron Cooling Demo L.J.Mao (IMP), H.Zhang (Jlab) On behalf of colleagues from Jlab, BINP and IMP.
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
1 1/15 Status of the Nuclotron-NICA G.Trubnikov MAC, June 7, 2011.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
1. Baseline – from LMC  Presentation by F. Bordry at LHC Machine Committee 5.10 on LS1 Organisation: 1. Linac4 is not going to be connected.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Mechanical strain measurements on MQXFS1 Magnet using CERN system M.Guinchard and P.Grosclaude European Organization for Nuclear Research (CERN) 27 April,
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
O.I.Brovko, A.V.Eliseev, I.N.Meshkov, E.M.Syresin (JINR)
Report Technical Director Storage-Ring-Installation Completed
BM&N STS ladders assembly in VLHEP
Three stages of the NICA project: status and tasks
Stochastic cooling system: Start-up and project modes
NICA injection complex status
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Status of HESR 18th March Gießen Dieter Prasuhn.
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
A.Sidorin, on behalf of the team PP PAC, JINR, Dubna, 16 January 2017
A. Martynov on behalf of accelerator division.
Status of the PANDA Magnet
ПОЛНОЕ НАЗВАНИЕ ПРОЕКТА
Adriana Rossi, Sergey Sadovich
Challenges for FCC-ee MDI mechanical design
Status of the VEPP-2000 Collider Project at Novosibirsk
Advanced Research Electron Accelerator Laboratory
Electron sources for FCC-ee
as a prototype for Super c-tau factory
HESR for SPARC 25th November FAIR MAC Dieter Prasuhn.
Breakout Session SC3 – Undulator
Pulsed electron beam cooling experiments: data & preliminary results
Presentation transcript:

Status of RF stations for NICA project MAC meeting october 2015

 Booster RF stations  Modernization of Nuclotron RF stations  Barrier RF stations for Collider  2-nd (harmonic) RF stations for Collider (RF2)  3-ed (harmonic) RF stations for Collider (RF3)

Booster RF system In april 2015 RF stations were delivered, assembled and mounted on a test bench in JINR. Testings were made as well by BINP team. Stations were officially handed over to the JINR and are ready for installation at the booster's ring. An agreement was signed for the second set of control electronics. An agreement for the development and production of magnetic field sensor is preparing for signing also. MAC meeting october 2015 BINP team in test bench’s pavillion in JINR

Booster RF stations Power part Low level part MAC meeting october 2015

Nuclotron RF system It is currently being modernized the individual components of the system such as:  The contract between JINR and BINP for developing and production of preamplifier is under preparation now.  Intermediate amplifier have already been developed, produced and delivered to JINR by BINP. Intermediate amplifier

BB RF system for Collider The agreement was signed on the implementation of research and development work: Development and production of prototype of the section of the barrier acceleration station». It includes:  Development of the construction of the barrier section of the station (investigation of parameters of rings, development and production of a prototype of section (including ring, elements of cooling, elements of electronics), test bench)  Development of the contactor’s construction of accelerating gap and preparation of design documentation. The development of test procedures of spring contacts of contactor on longevity, preparation of design documentation for the test bench.  The theoretical (numerical) study of the effect of noise of the barrier system on the longitudinal beam emittance with electron and stochastic cooling during accumulation and acceleration MAC meeting october 2015

BB RF system for Collider MAC meeting october 2015 Intermediate results: 1.Development of the construction of the barrier section of the station: Each section of the barrier station includes a ring of amorphous iron with loops for connection transistor pulse shaping. Two brands of amorphous material- 5B-M (iron-based), and M-84HV (based on cobalt) are considered for rings. 5B-M Material was used for RF booster stations. Parameters of rings were investigated. The rings based on cobalt are considered to be more preferable by now. Prototypes of rings of amorphous materials (dimensions: 260x200x15 mm)

MAC meeting october 2015 BB RF system for Collider 2. Electronics for the BB RF section includes quick keys to obtain the necessary pulse voltage: Two types of core transistors company Microsemi - DRF1200 and DRF1400 are investigating now. Acquired keys DRF1200 (20 pcs.) And DRF1400 (10 pcs.). Section is preparing for test bench investigations in working regime

MAC meeting october 2015 BB RF system for Collider 3. Preparation of the stand. Testing the section in operation for: Study of the thermal regime of the section Study of parameters (amplitude, shape) of pulses Study of the density spectrum of parasitic amplitude and phase modulation of the voltage on the ring

MAC meeting october 2015 BB RF system for Collider Contactor for accelerating gap When station is idle its gap is shorten by mechanical contactor. Contactor is a tube with a diameter close to the diameter of a vacuum chamber with spring contacts (beryllyum bronze). Contactor moves in vacuum. The motion is transferred via sylphons. Test bench is needed for: -Defining of the actual resource of spring contacts, and sylphons (should be not less then ) -Defining of the necessary precision of positioning of contactor

MAC meeting october 2015 BB RF system for Collider Contactor design of accelerating gap (preliminary data). Sketch of stand for testing elements of contactor

MAC meeting october 2015 BB RF system for Collider The theoretical (numerical) study of the effect of noise of barrier system on the longitudinal beam emittance with electron and stochastic cooling is started on as well as analysis of methods of measuring parasitic modulation of the accelerating voltage and the barrier voltage

Thank you for your attention MAC meeting october 2015