LCLS Sector 21 - BC1 Power Supply Design September 15, 2005 1 LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.

Slides:



Advertisements
Similar presentations
Daikin Altherma™ Troubling Shooting
Advertisements

Variable Frequency Drives VFD Basics
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
7154 VFD Presentation #3 May 2002 Paul Weingartner.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
NUMI Power Supply Regulation WBS Power Supply System Level 3 Manager Nancy Grossman FNAL June 28, 2001.
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
University of Pennsylvania Basic Electronics Things to be covered: What is electricity Voltage, Current, Resistance Ohm’s Law Capacitors, Inductors Semiconductors.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
CCTV SYSTEMS CAMERA POWER SUPPLIES.
15 December ATF2 High Availability DC Magnet Power Supplies – Commissioning Status By: Paul Bellomo, Antonio de Lira, Briant Lam* and David MacNair.
E2 Motors and Motor Starting
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
LCLS Injector Power Supplies July 28, LCLS Injector Power Supplies for Purchase Paul Bellomo, Antonio de Lira, Dave Mac Nair.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 Power Supply Hazard Analysis Summaries P. Bellomo,
33 in 1 Deluxe Electronic Exploration kit
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Paul Bellomo LCLS Power March 30, LCLS Injector, Sector 21 and BC1 New Power Supplies Needed for First Injection.
MAE156A October 12, 2006 UCSD H. Ali Razavi.  Electric voltage is similar to height difference: - Electrons start moving under voltage difference - Unless.
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
BOOT MODE 1 BOOT MODE 2 BIOS COMMUNICATION DEFAULT CONTROLLER INVERT RELAY OPERATION ENABLE COMM FAIL RELAY CONTROL RELAY OFF / ON COMM.
ILC Electronics Manufacturing Opportunities ILC Industrial Forum at Fermilab September 21-22, 2005 Ray Larsen for SLAC ILC Electronics Group.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
February 17-18, 2010 R&D ERL Bob Lambiase R&D ERL Power Supplies Bob Lambiase February 17-18, 2010 Power Supplies.
2nd ATF2 meetingRole Sharing between KEK and SLAC M.Kumada Role Sharing between KEK and SLAC 1.Performance of Demonstration power supply of KEK 2.Role.
LCLS Injector Intermediate Power Supply Design Review August 29, LCLS Intermediate Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
LCLS Sector 24 QE Magnet Power Supplies January 12, LCLS Sector 24 Power Supplies For QE Magnet Splits Paul Bellomo, Antonio de Lira, Dave Mac Nair.
This courseware is copyrighted © 2013 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Electric current Electric current is a flow of charge In metallic conductors, the charge is carried by electrons.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
1 BROOKHAVEN SCIENCE ASSOCIATES Integrated Testing George Ganetis Integrated Testing ASAC Review October 14-15, 2010.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.
1 BROOKHAVEN SCIENCE ASSOCIATES ASAC Meeting NSLS-II Project July , 2008 G. Ganetis Power Supplies & Electrical Utilities ASAC Meeting National Synchrotron.
University of Pennsylvania Basic Electronics Things to be covered: What is electricity Voltage, Current, Resistance Ohm’s Law Capacitors, Inductors Semiconductors.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Auto turn off battery charger Auto turn off battery charger.
Switch Mode Power Supply(SMPS) BY: Arijit Acharya NETAJI SUBHASH ENGINEERING COLLEGE M.tech(P.S.) Roll No - 1.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
KEK ATF2 High Availability DC Magnet Power Supplies Phase 2 Progress and Specifications 31 May 2006 Paul Bellomo, Antonio de Lira, Briant Lam and Dave.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
Powering The RHIC EBIS at BNL (And a few words on other new projects within the Collider –Accelerator Dept.) Bob Lambiase 16 June 2019.
S A Griffiths CM42 June 2015 Electrical & Control.
Industrial Star Delta Starter For a 3-Phase Induction Motor
SLAC Accelerators Power Electronic System Operation for Reliability
ILC RTML Meeting EDR Planning for Magnet Power Systems
ATF2 Magnet Power Supplies
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Created by Mr. Gable Technology Education Maple Grove Junior High
Automotive Electronics
Injector, Sector 21 and BC1 Bulk Power Supplies
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Magnet Controls K. Luchini
LCLS Intermediate Power Supplies
Objectives Learn about 3 Phase vs. 1 phase F&N vs. 1 phase F&F
Fluid Power System Electrical Control
Presentation transcript:

LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair

LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 power supplies Intermediate power supplies for the BC1 dipole string Address two QE magnet issues MCOR12s and MCOR30s for small quads, trims and corrector magnets MCOR Bulk Power Supplies Power Supply Controllers and Transductors

LCLS Sector 21 - BC1 Power Supply Design September 15, Power supplies 25V, 375A, 10kW$16,000 1 PS controller$2, A current transductors$1,320 Total$19,320 Does not include IOC, rack, miscellaneous component, EDI, labor, etc costs

LCLS Sector 21 - BC1 Power Supply Design September 15, * In LCLS mode this magnet runs opposite polarity from SLC mode ! This magnet gets switched off in LCLS mode Switch/protectionParts descriptionCostComment Manual Enclosure/fuses/miscellaneo us parts $200 Administrative control - no read back Contactor Enclosure/fuses/contactors/ miscellaneous parts $600 SCR of MOSFET Enclosure/fuses/solid-state devices/miscellaneous parts $700 Does not include IDIM/IDOM and cable costs

LCLS Sector 21 - BC1 Power Supply Design September 15, Bulk and Boost PS mods to run Q21201 at 0A in LCLS mode SLC modeLCLS mode

LCLS Sector 21 - BC1 Power Supply Design September 15, SLC modeLCLS mode Bulk PS mod to run Q21301 at 0A in LCLS mode

LCLS Sector 21 - BC1 Power Supply Design September 15, New magnet systems

LCLS Sector 21 - BC1 Power Supply Design September 15, MCOR12 < 30 ppm short term, < 1000 ppm long term New magnet systems

LCLS Sector 21 - BC1 Power Supply Design September 15,

LCLS Sector 21 - BC1 Power Supply Design September 15, New magnet systems

LCLS Sector 21 - BC1 Power Supply Design September 15, SCOR6 10 to 80 ppm setting dependent, 1000 ppm long term MCOR12 < 30 ppm short term, < 1000 ppm long term Existing Magnets

LCLS Sector 21 - BC1 Power Supply Design September 15,

LCLS Sector 21 - BC1 Power Supply Design September 15, Replace 12 SCOR6 with MCOR12

LCLS Sector 21 - BC1 Power Supply Design September 15, Existing magnets – Change PS from SCIOR6 to MCOR12 Option 1 – $28.2k. Replace all 12 SCOR6 with MCOR12, PS remain in alcove. 12 power modules, 12 programming modules, 1 interface board, 1 crate, miscellaneous parts. Reuse bulk PS and cables. Option 2 - $38k. Replace all 12 SCOR6 with MCOR12. Relocate all 12 to Sector 20 racks. Parts same as Option 1, plus bulk power supply and new cables. Option 3 - $21k. Replace 4 SCR6 with MCOR12 for 10Hz feedback. Install in alcove. 4 power modules, 4 programming modules, 1 interface board, 1 crate, miscellaneous parts, plus bulk PS. Reuse cables. Option 4 - $15k. Replace 4 SCOR6 with MCOR12 for 10Hz feedback. Install in Sector 20 rack. Same as Option 3, less bulk power supply, plus cables

LCLS Sector 21 - BC1 Power Supply Design September 15, Intermediate PS Hazard Analysis Bleeder resistors Across LF/HF filter capacitors PPS interface External Flammable liquids Trace amounts in electrolytic filters Hazard signs Labels on PS for voltage and heat hazards MPS interface In Ethernet chassis, open contact removes ON Soft-start Prevent input current surge Totally enclosed AC plug, cover over DC terminals Other components Non-flammable or fire retardant OtherUse listed components wherever possible and SLAC EEIP inspection prior to or after shipping

LCLS Sector 21 - BC1 Power Supply Design September 15, List of Potential Intermediate Power Supply Bidders Danfysik C/o GMW Associates 955 Industrial Road San Carlos, CA EMI-Lambda C/o Tritek Solutions, Suite Wyatt Drive Santa Clara, Ca Mr. Bret McDonald (408) X405 Dynapower Corporation 1020 Hinesburg Road P. O. Box 9210 South Burlington, VT Attn: Adam M. Knudsen IE Power, Incorporated 12 Falconer Drive, Unit 15 Mississauga, Ontario Canada L5N 3L Attn: Mr. Bob Holmes Elgar Electronics Corporation 9250 Brown Deer Road San Diego, CA Ph Grant Moore Matsushada c/o BiRa Systems Incorporated 2410 Midtown Place, Suite A Albuquerque, New Mexico Phone: Mr. Phillip Biswell

LCLS Sector 21 - BC1 Power Supply Design September 15, GMW Associates 955 Industrial Road San Carlos, CA

LCLS Sector 21 - BC1 Power Supply Design September 15,

LCLS Sector 21 - BC1 Power Supply Design September 15, Cable and Conductor Sizing Per 2005 NEC Basis – copper conductors, 90C insulation, max 45C ambient, no more than 3 conductors in a cable, cable tray fill per Article 392. Table of NEC Power SupplyBasic Ampacity/DeratingConductor Size 25V, 375A375A/0.87 = 431A500kcmil 430A, use it 60V, 30A30A/0.87 = 34A#10AWG 40A, use #8AWG 40V, 12A12A/0.87 = 14A#18AWG 14A, use #12AWG

LCLS Sector 21 - BC1 Power Supply Design September 15, END !!!