PHENIX DC meeting Oct / 10 / 2001 Status of T0 counter DC meeting, Oct / 10 / 2001 T. Chujo, A. Danmura, S. Esumi, A. Kiyomichi, Y. Kuroki, H. Masui, Y.

Slides:



Advertisements
Similar presentations
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Test results and status on T0 T0: start counter for pp collisions ShinIchi Esumi Inst. of Physics, Univ. of Tsukuba test experiment at KEK-PS analysis.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
1 Timescales Construction LCR MICE Beam Monitoring counters + DAQ My understanding Jan 07 Feb 07 Mar 07 Apr 07 May 07 Jun 07 Jul 07 Aug 07 Sep 07 ISIS.
T0 status ShinIchi Esumi Univ. of Tsukuba contents (1) Do we really need T0? (2) rate estimate and statistics (3) design and installation.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
 Read out strips production : We will provide 200 strips (100 RE4/2 and 100 RE4/3) Contract with Beijing Gaonengkedi Co. signed on 10-Aug., 3 RE4/2 and.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Tracker Summary Alan Bross MICE CM October 10, 2007.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
T0/PCR / NTC Meeting at bldg (Sep / 27 / 2001) Memo for the T0/PCR/NTC cable length (for HV and signal) *** Contents *** 1) Dimensions in IR. 2)
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
2003/Oct/19 version.Page 1 Aerogel HV cable assembling procedures (for W1-NORTH-side of 80 Aerogel Boxes) Phenix high-pt PID upgrade team Original version(Oct/11/’03):
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Extended Pid in PHENIX (assembly and integration ) 7/28/03 CDR review 07/28/2003, presented by E.Kistenev.
Technology Department 1 ELENA Fast Deflectors status Nicolas Voumard, Jan Schipper TE/ABT/EC TCM 17/11/2015 1/11.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
Status Report toward the Beam Test Quick report on the MPPC mass check Other beam test related issues –Schedule –Participants –Jobs –etc … Satoru Uozumi.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Status of HO Installation Shashi Dugad Tata Institute of Fundamental Research India-CMS Collaboration Meeting, Chandigar April 2007.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Masahiro Konno for the Aerogel groupDC Meeting, Apr/14/04 1 Status of Aerogel Reconstruction –Track association implemented in CGL. –Raw data (ADC, TDC)
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Yonsei – Tsukuba Workshop / Hiroshi Tsuruoka / Aug 1 Current Status of TOF Analysis 1. PHENIX 実験とは 2.なぜ新たな検出器が必要か? 3. Time Zero Counter の設計 4.テスト実験(
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
DCal-ALICE integration and installation plan and status A. Tauro.
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
DCS: Temperature Probes
DCS: Temperature Probes
RHICf Japan meeting General status
Design of the He and HB ODU
This Presentation Pack is brought to you by
Schedule after Shutdown
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

PHENIX DC meeting Oct / 10 / 2001 Status of T0 counter DC meeting, Oct / 10 / 2001 T. Chujo, A. Danmura, S. Esumi, A. Kiyomichi, Y. Kuroki, H. Masui, Y. Miake, M.Ono, S. Sakai, S. Sato, M. Suzuki, and H.Tsuruoka BNL, JSPS and Univ. of Tsukuba

PHENIX DC meeting Oct / 10 / 2001 Jul/mid.[Done]: All the drawings are finished production started. Jul/26 [Done]: Internal meeting for T0. Aug/2 [Done]: Design and safety review. Aug/3 [Done]: All the parts arrive at Tsukuba. Aug/6 [Ongoing] Installation exercise with a nosecone mockup Aug/29 [Done]: Shipping all the parts of T0 to BNL Sep/13 [Done]: All the parts arrive at BNL final assembly start Sep/Oct[Came]: H.Tsuruoka and M.Ono arrive at BNL for the [Ongoing]: preparation of installation Nov/mid: Installation? Plan and status of T0 Aug / 8 / 2001 DC meeting [Done]:

PHENIX DC meeting Oct / 10 / 2001 Preparation at BNL Pre-assembling T0 together with PCR  Done. Checking the counter with HV  Done. All counter is good Fabrication of Signal/HV cable  · Signal cable length tune up with NTC’s length. · HV cable length is set (9m). · Need tech help. Fabrication of patch panel at rack  · Need tech help. for signal cable. Installation scheme/skill transfer  · Done among T0 group. · If needed for BNL side, we can do. · Already gave input to Tom/Pete installation plan.

PHENIX DC meeting Oct / 10 / 2001 Current Situation At BNL Bldg.510 (1F, high-bay area) Pre-assembled, 8 (+spare) sets of T0/PCR Installation scheme transfer [ from left, SS, H. Tsuruoka ] [ from left, H.Tsuruoka, T.Hachiya ]