October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.

Slides:



Advertisements
Similar presentations
Tevatron Beam Diagnostics: Boosting Collider Performance Vladimir Shiltsev, Ron Moore, Andreas Jansson FNAL/Accelerator Division.
Advertisements

Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
Vaia Papadimitriou The Supertable (Introducing Supertable II) Run II meeting September 2, 2004 Timofei Bolshakov and Vaia Papadimitriou.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
F Shot Engineering Accelerator Advisory Committee Elvin Harms Fermilab Beams Division 13 May 2002.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
SDA- Shot Data Acquisition and Analysis Example of major applications that use the Java DAE framework Jean Slaughter Controls Review Feb 4, 2004 A success.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
A Monte Carlo Model of Tevatron Operations Elliott McCrory Fermilab/Accelerator Division 13 October 2005.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
LHC Utilities & Facilities WAO Daejeong 12/04 – 16/04/2010 Markus Albert on behalf of LHC Operations.
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
F 19 August 2002 All Experimenters Meeting Beams Week in Review Continued to work on providing Luminosity L  N p N a /  –Stacking rate –Coalescing efficiency.
Jean Slaughter -Feb 24, 2004 Shot Data Responsible for physics analysis of shot data Oversees the development of shot data analysis tools Responsible for.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
Jean Slaughter –April 5, 2004 – all experimenters’ meeting Purposes of SDA Store to store monitoring of performance Long term trends Analysis of specific.
Check lists to mouse clicks Automation Session : WAO The Fermi National Accelerator Laboratory is a U.S. Department of Energy (DOE) research laboratory,
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
June 15, 2002David Finley to Aspen PAC Slide 1 Report on 132 nsec Operation Report to the Fermilab.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
S. Pordes - to part of CD 09/10/031 Introduction to some Beams Division jargon in some order…see how far we get:
D. Still-FNAL/Tevatron HALO '03 Tevatron Collider II Halo Removal System Dean Still Fermilab Tevatron Department 5/21/2003 Motives for the Collider Run.
Low Luminosity Opportunities Andrew Brandt, U. Texas at Arlington DØ ADM November 18, 2005 “easy” “really hard”
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandra Bhat Todd’s Operation Meeting /12/2015 Chandra Bhat Abstract:
How Can Experimenters Help Improve Accelerator Operations? Jean Slaughter UEC Meeting November 22, 2003.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
RECYCLER REQUIREMENTS FOR THE RECYCLER RING & ASSOCIATED TRANSFER LINES BPMs Brajesh Choudhary for the MI Dept.
9/2/2003Tev BPM requirements1 Tevatron BPM and BLM requirements Mike Martens.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
F All Experimenters' Mtg - 24 Feb 03 Week in Review: 02/17/03 –02/23/03 Ron Moore – FNAL Store Summary Failed Tev dipole disassembly Schedule for Week.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
F HCP 2007 Performance and Future of the Tevatron Ron Moore Fermilab - Tevatron Dept. Tevatron overview and performance Antiproton source + Recycler overview.
Vladimir Sirotenko, Feb FPD: Runs & hisDB Oracle Databases Goal: access information about FPD experimental setup and accelerator conditions which.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
Recycler Pbar Transfer -Gattuso 1 Recycler weekly Summary This presentation will probably involve audience discussion, which will create action items.
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Use of a Diamond BLM System in the LHC Ring
Use of a Diamond BLM System in the LHC Ring
Software For Accelerators
Beam-beam Effects in Hadron Colliders
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Presentation transcript:

October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data from stores. It is complementary to special studies and the data loggers. Version

October 2002 Jean Slaughter Schematic View of SDA Instruments Other Devices System of DA engines Database Files EXCEL, etc. Scalar, Plot Viewers User Programs (Java classes) Servlets Standard Plots, Tables, Store Checker SDAEdit

October 2002 Jean Slaughter Inputs to SDA Longitudinal, transverse emittances Intensities, DC and bunched Beam positions Settings –Magnets, collimators, etc. –Tunes, chromaticities Computed devices Data from CDF, D0 –Luminosity –Losses –Beam position, size

October 2002 Jean Slaughter Tevatron HEP Collider State Diagram Proton Inject’n porch Proton Injection tune up Inject Protons Eject Protons Inject Pbars Pbar Injection porch Before Ramp Flattop Acceleration Squeeze Initiate Collisions Remove Halo HEP Pause HEP Proton Removal Unsqueeze Deceleration Extraction porch Extract Pbars Cogging Recovery Ramping Flattop2 Reset Cases and Sets 36 sets p injection 9 sets for pbar injection set every 10 min - HEP Not shown are MI, Pbar Source, Recycler States

October 2002 Jean Slaughter SDA Viewer Window Case Unstack Pbars- Store 1843

October 2002 Jean Slaughter Pbar Bunch Intensities in MI before Transfer Case Inject Pbars - Store 1787 set number (transfer) bunch intensity

October 2002 Jean Slaughter MI Bunch Intensities After RF Compensation - Store 1836 Intensity 10 9 store:set (transfer)

October 2002 Jean Slaughter Snapshots and Fast Time Plots Capture High Frequency Data - (PlotViewer) RF cavity phase, RF4 Cavity Volts RF4 MI phase error, 53 MHZ seconds Accumulator RF During Unstacking

October 2002 Jean Slaughter Standard Plot for Pbar Intensities

October 2002 Jean Slaughter Store Checker Purpose –Monitor instrumentation and DAQ –Monitor accelerator performance Checks SDA data for specified cases/sets –Min < device value < max –Min < ( difference in time of 2 devices ) < max –Min < ( difference in value of 2 devices) < max Jobs run automatically every store “Standard” and “private” lists Results on WWW for “standard” list Lists on WWW

October 2002 Jean Slaughter Store Checker Results When MiniBoone started running, errors were detected. B:CHGB had to be sampled and held at a a different time.

October 2002 Jean Slaughter Examples of User Analyses Emittances for stores Calculated versus measured luminosity at CDF Measured HEP pbar lifetime compared to lifetime expected from interactions

October 2002 Jean Slaughter User Analysis Combining Many Stores P. Derwent

October 2002 Jean Slaughter Measured Versus Computed Luminosity P. Lebrun

October 2002 Jean Slaughter Measured Pbar Lifetime Versus Lifetime Due to Collisions - March P. Lebrun

October 2002 Jean Slaughter Measured Pbar Lifetime Versus Lifetime Due to Collisions - October P. Lebrun

October 2002 Jean Slaughter Jobs for 2003 Finish and then maintain SDA infrastructure –Still some DAQ errors –More flexible user access to data –Physics classes in Java tool kit Finish reviewing inputs Study instrumentation Standard plots and tables Emittances Automated shots log Automated summary spreadsheets User requests and education Long term archiving of (non-SDA) data logger data

October 2002 Jean Slaughter Ongoing Operations in 2003 Dedicated analyses Monitoring of SDA inputs –Instrumentation problems –DAQ problems Monitoring of stores –Assimilating all the information –Group of physicists to review data and follow up on what’s found

October 2002 Jean Slaughter SDA Team Controls Department – K. Cahill, B. Hendricks, M. McCusker, T. Bolshakov Computing Division – P. Lebrun, S. Panacek, A. Kulyavtsev, N. Kouropatkine, R. Rechenmacher Systems Departments –E. Harms, J. Annala, D. Capista Headquarters –M. Church, J. Slaughter

October 2002 Jean Slaughter Summary SDA infrastructure should be complete in 6 months Shot analysis is a continuing part of operations

October 2002 Jean Slaughter Two Types of Data Lumberjack data –Fixed frequencies, i.e. non-triggered –Used for studies –Circular buffers – data is overwritten after 1-30 days –Any user can modify any archive configuration SDA data –Triggered at specific events –Only during stores –Permanent archive –Standard content Backup Slide