ISO Liaison Report Hidenori Shinoda Charles Parisot.

Slides:



Advertisements
Similar presentations
ECMA-373 Invitation to ETSI/SCP and JTC 1/SC 06 for open review For Ecmas comments and dispositions to DIS in ISO/IEC JTC 1s fast track procedure Ecma/GA/2006/136.
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
1 Dipl.-Ing. Ernst-Peter Ziethen Director International of DIN Timeframes for the Development of International Standards Geneva, DIN Deutsches.
ESSnet Stanprep The CEN Standardisation Process. CEN Overview: A standard (French: Norme, German: Norm) is a technical publication that is used as a rule,
Miles Shepherd Chairman ISO Technical Committee 258.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
سابقه تاریخی واژه استاندارد واژه استاندارد در زبان انگلیسی میانه (انگلیسی متداول ) به معنی پرچم و علم و کتل بود و این معنی هنوز هم در زبان انگلیسی.
ISO/TC 211 WG 5 Profiles and Functional Standards Presentation to 7th Plenary of ISO TC 211, Beijing, China, 24 September 19981/18 Presentation to ISO/TC.
Conformity assessment – Standards and CEOC’s involvement Annual Conference 31 of May 2010 in Vienna Dipl.-Ing. Gerd-Hinrich Schaub CEOC International.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
SC14 Report to the SC13 Plenary Larry Schultz, Chairman Erin Cliggett Kahn, Secretary 17 June 2008.
ISO 9001: 2008 Boosting quality to differentiate yourself from the competition CER BL November 2008.
Module IV Standards Development and the Stages of Technical Work USNC Constituent Training Program This training material has been developed with content.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
Mod_02_13 Registration of Charges WG Update 03 April 2014.
SC32/WG2 N0879 Proposal for WG2-level formal resolution using Bugzilla Japan National body ISO/IEC JTC1 SC32 WG2 Toronto Meeting 2005/09/26-30.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Standardization Management Board Decisions How They Affect Your TAG! Jim Matthews Vice President & SMB Chairman.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Provenance and Context Content Standard (Emerging) – Status of Activities H. K. Ramapriyan Science Systems and Applications, Inc. & ESDIS Project, Code.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
SC32/WG2 N889 Guideline to use Bugzilla in SC32WG2 (supersedes SC32/WG2 N0879) Bugzilla Drafting Committee SC32WG2 ISO/IEC JTC1 SC32 WG2 Toronto Meeting.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
FGDC Coordination Group Ken Shaffer April 13, 2010 FGDC Standards Process Review Survey.
Due Process – ISSAIs and INTOSAI GOVs Roberto José Domínguez Moro Superior Audit Office of Mexico INTOSAI Working Group on Public Debt June 14, 2010.
Dual Logo Procedures Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 November 2004.
Summary of 4 th Informal Group on WLTP 14 January 2010 Palais des Nations, Geneva Informal document No. GRPE (59th GRPE, January 2010, agenda.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
ISO Liaison Report Web Access to DICOM Persistent Objects Emmanuel Cordonnier Hidenori Shinoda Taipei, April, 2003.
Report on ISO/TC215 WG02 Makoto Suzuki JIRA 2008/Sep/05 Munich, Germany.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
ISO Liaison Report Hidenori Shinoda 9/28,29/2005 Budapest.
DICOM WG10 and ISO TC215 WADO Work Item Planning Joel Chabriais/Cor Loef co-chair DICOM Strategic Advisory Committee.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
Introduction to the World of International Standards
ISO/TC 204 WG 3-Database Technologies
ISO TC 108 SC3 Liaison to CCAUV
Simplification of Lighting and Light-Signalling Regulations
ISO TC268 SC1 - Smart Community Infrastructures -
WG Technical Editor’s Report
IEC Activities affecting HSSC Hannu Peiponen Chair of IEC TC80
Standards Development: An Overview
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
doc.: IEEE <doc#>
IEC Maintenance Committee Report
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
Standardization Management Board Decisions How They Affect Your TAG!
IEEE IMT-Advanced Review Process
Liaison Report Date: Authors: March 2011
doc.: IEEE <doc#>
Next Steps Advisory group debrief call Circulate meeting summary
5.1 ETC Activity report 2018 Meetings:
IEEE IMT-Advanced Review Process
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
Comments on IMT-Advanced Review Process
CUSC Amendment Panel Recommendation
Working Party on General Safety Provisions (GRSG) General information
European Standardization
Working Party on Noise (GRB) General information and WP.29 highlights
Presentation transcript:

ISO Liaison Report Hidenori Shinoda Charles Parisot

ISO/TC215 meeting was held in Melbourne, Australia between Aug. 11 th and 15 th.  Charles Parisot and Hidenori Shinoda attended as DICOM Liaison. Aug. 12 th : ISO/TC215 opening plenary meeting. Aug. 12 th : ISO/TC215 opening plenary meeting. Aug. 13 th – 14 th : WG2 meeting Aug. 13 th – 14 th : WG2 meeting Aug. 15 th : ISO/TC215 closing plenary meeting. Aug. 15 th : ISO/TC215 closing plenary meeting.

Charles made a presentation on Web Access to DICOM Persistent Objects.

Charles proposed

WG2 accepted our proposal as an NWI.  We jointly edited our new work item proposal with WG2.3(Methodology) and WG2.1(Device) consecutively.  TC215/WG2 finally decided to form WG2.4(Web Access to DICOM Persistent Objects). Co-Chair: Nicholas Brown (ISO) Co-Chair: Nicholas Brown (ISO) Hidenori Shinoda (DICOM) Hidenori Shinoda (DICOM)  WG2 proposed this NWI to TC215 at the preliminary meeting and TC215 approved this item as a WG2 work program at Stage 0.

Rough Schedule September, 2002 October, 2002 November, 2002 December, 2002 January, 2003 February, 2003 March, 2003 April, 2003 May, st Draft of the supplement 18 th : Review the 1 st Draft at 1 st t/con 11 th : 2 nd Draft of the supplement 30 th : Review the 2 nd Draft at 2 nd t/con Review a draft at DICOM/WG6 meeting Face-to-face joint meeting at San Antonio DIS will be prepared and the draft will be submitted to the public comment. Review comments for the draft at t/con TC215 meeting at Oslo, Norway

Current members of the WG2.4  From ISO/TC215 Nicholas Brown (Co-Chair, UK) Nicholas Brown (Co-Chair, UK) Melvin Reynolds (Chair person of WG2.1(Device),UK) Melvin Reynolds (Chair person of WG2.1(Device),UK) Thomas Norgall (Germany) Thomas Norgall (Germany) Donald Singley (Kodac, ??) Donald Singley (Kodac, ??) ISO secretariat may announce and recruit other members from national member bodies. ISO secretariat may announce and recruit other members from national member bodies.  From DICOM Members of WG6 Members of WG6

ISO Standard Development Process (FYR)

International Standard Development Process Stage 1: Proposal stage The first step in the development of an International Standard is to confirm that a particular International Standard is needed. A new work item proposal (NP) is submitted for vote by the members of the relevant TC/SC to determine the inclusion of the work item in the programme of work. The proposal is accepted if a majority of the P-members of the TC/SC votes in favour and at least five P-members declare their commitment to participate actively in the project. At this stage a project leader responsible for the work item is normally appointed. Stage 2: Preparatory stage Usually, a working group of experts, the chairman (convener) of which is the project leader, is set up by the TC/SC for the preparation of a working draft. Successive working drafts may be considered until the working group is satisfied that it has developed the best technical solution to the problem being addressed. At this stage, the draft is forwarded to the working group's parent committee for the consensus-building phase.

International Standard Development Process Stage 3: Committee stage As soon as a first committee draft is available, it is registered by the ISO Central Secretariat. It is distributed for comments and, if required, voting, by the P-members of the TC/SC. Successive committee drafts may be considered until consensus is reached on the technical content. Once consensus has been attained, the text is finalized for submission as a draft International Standard (DIS). Stage 4: Enquiry stage The draft International Standard (DIS) is circulated to all ISO member bodies by the ISO Central Secretariat for voting and comment within a period of five months. It is approved for submission as a final draft International Standard (FDIS) if a two-thirds majority of the P-members of the TC/SC are in favour and not more than one-quarter of the total number of votes cast are negative. If the approval criteria are not met, the text is returned to the originating TC/SC for further study and a revised document will again be circulated for voting and comment as a draft International Standard.

International Standard Development Process Stage 5: Approval stage The final draft International Standard (FDIS) is circulated to all ISO member bodies by the ISO Central Secretariat for a final Yes/No vote within a period of two months. If technical comments are received during this period, they are no longer considered at this stage, but registered for consideration during a future revision of the International Standard. The text is approved as an International Standard if a two-thirds majority of the P-members of the TC/SC are in favour and not more than one-quarter of the total number of votes cast are negative. If these approval criteria are not met, the standard is referred back to the originating TC/SC for reconsideration in the light of the technical reasons submitted in support of the negative votes received. Stage 6: Publication stage Once a final draft International Standard has been approved, only minor editorial changes, if and where necessary, are introduced into the final text. The final text is sent to the ISO Central Secretariat which publishes the International Standard.

Review of International Standards (Confirmation, Revision, Withdrawal) All International Standards are reviewed at least once every five years by the responsible TCs/SCs. A majority of the P-members of the TC/SC decides whether an International Standard should be confirmed, revised or withdrawn.