Municipal Solid Waste Power Plant Project 2014. 4. DL ENT Co., Ltd.

Slides:



Advertisements
Similar presentations
An Overview of the Development of a Renewable Energy Project And the 5 Major Milestones to Achieve Financing By Robert Hunter Director of Operations, Green.
Advertisements

Climate Change Finance Facility (CCFF) Call for proposals: "Use of Renewable Energy Resources in the Household Sector (1st round) ( from 28 January - 24.
Bill Chynoweth Resource Management Partners Troy, Michigan Bill Chynoweth Resource Management Partners Troy, Michigan Renewable Energy Which way should.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
ROT Rotating incinerator with a patented ”near to zero” emission filter All data within this presentation is according to the European norms 2000/76/CEE.
Qualifications: BSc (Hons) Chemistry, Jordan PhD (Env Chemistry), Aberdeen, United Kingdom MRSC, CChem, IEMA DR AHMED AYOUB Technical Manager Work Experience:
Anchorage Regional Landfill Landfill Gas-to-Energy Project
BIOMASS ENERGY. OVERVIEW  Biomass is a renewable energy source that is derived from living or recently living organisms  Biomass includes biological.
Exhaust Heat Recovery Systems
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Paul A. Weghorst Executive Director of Water Policy
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Southwark’s New District Heating Network.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
Insight Conference How to Profit from the Business of Renewable Energy October 20, 2003, Hilton Toronto SMS Energy-Engineering Inc. Safouh Soufi.
Advanced Biomass-based Combined Heat and Power System Combined Heat & Power in the Pacific Northwest October 15, 2002 Nathan E. Carpenter Manager, Energy.
Buying Electricity and Natural Gas for a BIG User Joan Kowal Energy Manager, UMCP March 6, 2012 Sustainable Tuesdays Speaker Series.
Annual Conference 2008 Future Challenges for the Waste Management Industry Waste Framework Directive - Impact on the European Waste Management Industry.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
THE DEVELOPMENT OF THE BRONKHORSTSPRUIT BIOGAS PROJECT
Proven Waste Gasification Technology for Circular Society
RETScreen® Heating and Cooling Projects
RETScreen® Energy Efficiency Projects
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
ISWA Statistics on Energy Supply from Waste in the EU & A brief overview of the SYSAV site Håkan Rylander Chairman - ISWA WGTT CEO SYSAV.
POWER GENERATION TECHNOLOGIES
Biomass to Energy Projects in Indonesia CDM & Sustainable Development January 25 –26, 2006 Shangri-la Hotel, Jakarta -Indonesia Iwan Sutanto, PT. LUNTO.
Engineering Technology Division
CAPITAL COST ESTIMATES INSTALLED EQUIPMENT COSTS.
Case Study: Gemina rice husk project, Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
120 MW geothermal power plant, Iceland
SWAAAE Tim Holmes Kenwood Energy January 30, 2012.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Sustainable Alternatives In generating power for chemical plants.
CLEANER ENERGY for a Greener future CLEANER ENERGY for a Greener future Laidlaw Energy Group, Inc. 90 John St 4 th Fl New York, NY
THE ECOLOGICAL MONITORING CENTER. 2 JSC “Belgorkhimprom” Activity.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
No energy wasted Example of an energy strategy in urban areas Brussels, 22nd June 2006.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
The Future of Electric Power In Utah January 12, 2010.
STATIONARY FUEL CELLS Economics 101 Jane Price Hill, P. E.February 13, 2003.
Session 3: Project Development Agenda The Voice of a Technologist Utility Project Development Reliability Concepts Residential Project Development Homework.
The Risks of Participating in the AMPGS Coal Plant: February 14, 2008 David Schlissel.
HYDROPOWER. Objective: The student will be become familiar with the Corps policy for hydropower development. The student will be have a basic understanding.
1 Kansas Wind Energy A Municipal Utility Perspective KANSAS CITY BOARD OF PUBLIC UTILITIES Blake Elliott – Director Electric Supply Planning September.
11. 2 Steam Energy Energy that comes from the push of steam.
Biomass Renewable Energy Source Michael Parsons. What is Biomass? Biomass Renewable Energy from Plants and Animals Biomass Renewable Energy from Plants.
Hydro power 16.3 % Wind power 0.1 % Peat 6.9 % Other renewable 11.4 % Nuclear power 26.8 % Natural gas 10.3 % Coal 14.1 % Oil 1.9 % Net imports 12.2 %
STEAM POWER PLANTS.
Current Situation ENERGY SUPPLY: Dramatically increasing prices since years Naturally limited oil, gas and coal supplies constantly increasing energy consumption.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
E.ON Russia Production management September 2013 Deputy General Director on production Igor Popov.
EnergyTour November Copenhagen Energy Summit Energy Tour District Heating in Denmark Mr Jan Elleriis, Vice President, Metropolitan Copenhagen Heating.
RON DIPPIPO CHAPTER 21 ENERGY FROM THE EARTH. SUMMARY Ron Dippipo, geothermal energy consultant, Describes the benefits of using renewable energy sources.
Description Generation (Ton/Day) 49,90250,73650,00748,39848,84450,34652,072 Generation Per Person ( ㎏ /Day)
Cogen for Waste to Energy Process CoGen Limited, Blythe House, Blythe Park, Cresswell, Stoke - on - Trent, ST11 9RD
Preparation and Analysis of Project Report. What is a Project Report?  A Project Report is a detailed description of the Project  The Project Report.
What is Incineration incineration is a waste treatment process that involves the combustion of organic substances contained in waste materials. Incineration.
Introduction And Thermal Power Plant
Ochang industrial complex Ochang industrial complex District energy supply project District energy supply project Environment, energy sector.
Energy Savings Projects
Affordable Energy Production from Renewable Fuel
Lithuanian Energy Institute
Emily Pike Community Liaison Manager, SUEZ
Drivers for Waste to Energy Projects across Australia
City Council April 30, 2018 Item 13
Waste-To-Energy Plant Conceptual Design and Operation By NGWAN TECHNOLOGIES INTERNATIONAL.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Municipal Solid Waste Power Plant Project DL ENT Co., Ltd.

Construction Plan 03 Government’s Scope Project Overview 04 Master Plan

Project Overview

- 4 - Project MSW (Municipal Solid Waste) Power Plant Project (BOT) Construction Terms Construction Terms 14 months after start up BOT (Build – Operation – Transfer) : 20 years Target of the Project Target of the Project 1.Hygienic and economical processing of waste disposal facility for the installation of public 2. Using waste heat to ensure the development of renewable energy, such as crude oil expected substitution effect 3.On fossil fuels, the substitution effect of CDM projects to reduce greenhouse gas emissions, such as the UN Framework Convention on Climate Change active coping 4.Load reduction in eco-friendly to the environment and the installation of local residents improve health care plan Capacity MSW Capacity: 300 ton/day (1 st stage) Incinerator : 150 ton/day (× 2 Facilities), STG 7.0MWh (× 1 Facility) * 2 nd stage (700 ton/day) will be discussed later on Area 10,000 ㎡ 1. Project Overview

Project Structure DL ENT Co., ltd. 1. PPA : Power Purchase Agreement Government Project Financing 1) EPC(Engineering, Procurement & Construction) Financial Shareholder Kothai Technology EPC 1) Turn-key * Scope of Government 1. MSW Supplying Contract 2. Related Certificates / Public Complaints 3. MSW : 300 ton/day (more than 52% of Combustibles) 4. Free treatment for Waste Water / Ash (Incombustibles) 5. Free usage of Running water 6. MSW price : 350 THB/ton(1 st year), 450 THB/ton(from 2 nd year) PEA

Construction Plan

- 7 - Incineration Type Incineration Type Stoker (with Heat Recovery Boiler) Operating hours Operating hours Steam Production Steam Production Incineration Capacity Incineration Capacity 300 ton/day (150 ton/day * 2 Facilities) 24 hr/day (Continuous) Annual Operating hours Annual Operating hours 7,680 hr/year (320 days) 47.0 Steam Ton/hr Electricity Production Electricity Production 7.0 MWh Type of Waste Quantity (kg/hr) Ratio (%) Combustibles (%) Water (%) Ash (%) MSW (Incoming) 13, Low Quality : 2,677 kcal/kg 2. Waste Characteristics and Design Criteria 1. Equipment To be fixed after Basis Design

- 8 - Steam turbine gen-set Induced draft fan Ash bunker Bag filer Boiler Incinerator Refuse hopper Electric crane Refuse bunker Ash discharger Acid gas treatment sys. Reception hall 3. Equipment Model (Conceptual)

- 9 - ConsumptionQuantityPressureSteam Temp. Equipment45 ton/hr 39 – 40kg/ ㎠ 350 ℃ Heat Recovery system To be fixed after Basis Design

Layout (Main Process - Conceptual) To be fixed after Basis Design

공 종 Construction Schedule Detail Engineering 2. Fabrication (M) 3. Civil Work 4. Installation (M) 5. Architecture 6. Piping 7. Electricity Incoming 8. Insulation 9. Start up – Test run 10. Inspection(Environ) 12. Commercial Run & Generation of Electricity Total duration14 Months 6. Master Schedule (Estimated) (Unit : Month) To be fixed after Basis Design

Financing Summary (Unit : 100M Kwon) DescriptionCost Note Direct Cost 1. Incinerator with Heat Recovery Boiler system 25, Turbine Generator 4, Civil Work 8, Design 800 Summary 39,000 - Indirect Cost (Administrative) 1. Insurance for EPC 1, 사전개발비 1, Feasibility Study Cost for Law Firm Cost for Financing Supervision Management for the Construction Administrative Cost Contingency 2,100 Summary 7,500 Total Summary 46,500 -

Scope of Government’s

Scope of Rayong Government Scope of Rayong Government 1. MSW Supplying Contract 2. Related Certificates / Public Complaints 3. MSW : 300 ton/day (more than 52% of Combustibles) 4. Free treatment for Waste Water / Ash (Incombustibles) 5. Free usage of Running water 6. MSW price limitation : 350 THB/ton(1 st year), 450 THB/ton(from 2 nd year and further)

Master Plan

DescriptionMain SubjectDead lineNote 1 st Proposal (Brief) Project InquiryFinished Site SurveyFinished Project Proposal~ ` MOU AgreementMOU check / Agreement~ 4.30 Project FinancingFinancing Agency Contract~ 5.10 Feasibility StudyFinancial/Legal Consultant / Reports~ 8.30 Certificates Supplying of MSW~7.30 BOI Certificates / PPA Agreement~ 8.30 Project Financing Financial Shareholders ~ 9.20 Construction Bidding for Construction Company~ 9.30 Start up of the Construction~ Master Schedule (Estimated)

- 17 -

- 18 -