LHC Risk Review 5-7 March 2009 Magnet Situation, including Spares (M.Modena)

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

ColUSM #51 30 th January, 2015 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, Q. Deliege, V. Baglin, F. Savary.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
Vacuum, Surfaces & Coatings Group Technology Department Cleanness of the 3-4 cold beam lines Outline:  History: Status of 2009 cleaning  Foreseen and.
1 Integration of collimators in the dispersion suppressors Status of 11 T cryo- assembly integration Dec 17, 2013
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
New HV test specification for the LHC N. Catalan for the EI section.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
H. Prin, F. Savary, D. Duarte Ramos, L. Grand- Clement, C. Mucher, A. Temporal.
Magnets repair for 3-4 sector Lucio Rossi Reinstallation and interconnections Francesco Bertinelli Vacuum system – How to get ready for beam ? Vincent.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Critical spares LHC Performance Workshop Roberto Saban editor with contributions from A.Ballarino, Ch.Darve, G.Fernqvist, J.Íñigo-Golfín, K-H.Meß, V.Mertens,
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LHC Magnets/Splices Consolidation (20 minutes) Francesco Bertinelli 7 June, slides  Status of LHC: electrical connections  Description of shunt.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Workshop on Field Quality March 2003D. Tommasini MAIN STEPS OF CERN WORKS STEPACTIVITIES/CHECKS CM ReceptionVisual insp. & unloading, electrical.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Eric Prebys/LARP 2/17/2016.  CERN has taken unprecedented steps to control information about this event, including altering the electronic LHC log to.
11 T Dipole Project Cold mass integration status & plan F. Savary / TE-MSC-LMF.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Review of the Tests of Superconducting Magnets in SM18 14-January Measurements of Special SSS during production N. Catalan Lasheras Review of the.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
ABTEF Meeting, V. Namora Quality Assurance in the Superconducting Magnets and Circuits Consolidation (SMACC) project.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
MSC Technical Meeting 29 August 2013 Overheated QBBI.A21L6 F. Savary with contributions from N. Dalexandro, H. Prin, C. Scheuerlein, P. Voisin.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
Expected field quality in LHC magnets E. Todesco AT-MAS With contributions of S. Fartoukh, M. Giovannozzi, A. Lombardi, F. Schmidt (beam dynamics) N. Catalan-Lasheras,
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
MQXC Nb-Ti 120mm 120T/m 2m models
Cold mass design, assembly plans and QA/QC at CERN
Electrical insulation of magnet circuits in sector 7-8
CSP 25th November 2010 Technical agreement number 3: overview
Testing of SC Magnets Status - November 2010
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
12 October 2009 RRB Plenary R.-D. Heuer
The LHC - Status Is COLD Is almost fully commissioned
LS1 Committee January 24th, 2014
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
Renovation of the 45-year old PS magnets
Functional specification for the consolidated LHC dipole diode insulation system and consolidation strategy C. Scheuerlein on behalf of the LHC dipole.
Consolidation of the dipole diode insulation Technical aspects
Circuits description and requirements - Closed Session-
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
The 11T cryo-assembly: summary of design and integration aspects
Teleconference ACS – FREIA 20th February 2018
DS Collimators TE-MSC-CI
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
Presentation transcript:

LHC Risk Review 5-7 March 2009 Magnet Situation, including Spares (M.Modena)

Which is the extent of the magnets damage? 2

3

3-4 sector L- diodes L-Beam screen 4

5

During the cold test of SPARE magnets several problems appeared and obliged to REJECT a magnet (2420) and RE-TEST several others (2427, 2690, 3383, 2868 (the last two still ongoing) (Final) decision of few days ago to not take extra risk and SUBSTITUTE the 7 th SSS (192 in Q31) that, despite not showing major visual damages, has caused the “pull&push” of several other dipoles. For this SSS we have a spare available but it was left beside since slightly deteriorating the magnetic quality of the Sector. NOTE: the pre-allocation of the magnets, the tackling of the NEW problems appeared on the spares (mainly the consequent revision of the pre-allocation) is done together with BE-ABP through the Magnet Evaluation Board (MEB) activities (MEB meetings restarted few weeks after the incident). 6

Where we are now? 7

8

9

10

11

What we did specifically for S.3-4 reparation and in general to improve QA? 12

Cryostated magnets removed and substituted when: – Electrically damaged – Mechanically damaged, – Bus-bar system damaged due to displacements – Internal dirtiness Cold Mass removed and eventually re-used: – No electric damage or soot inside the cold mass; – No displacement at rest: we estimate from models that at max the displacement for such CM was < 50 mm well within the max elongation of the lyra (180 mm). For Q22 the displacement at rest is about 20 mm. We believe that it is safe. – No visual damage from endoscopy (except minor scratch on bus bar that are similar to other already seen in magnet later installed). – Qualification by COLD TEST Assessing magnet damages

The magnets re-used qualify, if they are found good, the magnet “behind” them. The 4 magnets in the affected-zone that we don’t remove and the rest of the magnets in the Sector are then qualified by this procedure. Qualification of magnets inside tunnel Examples of reparations acceptable on the re-used cold mass and cryo-magnets: - MLI substitution (in one case for MB, in several cases for the SSS) - Change of extremities flanges for Services and Beam Lines - Cold feet substitution (ONLY for some SSS) - Prolongation of spool busbars by US welding technique (configuration of spool BB is longer for Cold Test that for Tunnel)

Major actions taken at the level of COLD TESTS (at SM18): – A new Test Step: “MAIN SPLICES Check” was added systematically on both DIPOLES and SSS. After several weeks of optimization (and problem!) of the tooling and procedure these are now finalized and from week7 the check is done ON-LINE with the powering test. Backlog was recovered (the blocked 3383 was intercepted there). – Another new Test Step: “SPOOL SPLICES Check” was added systematically on both DIPOLES and SSS. The check is done OFF- LINE and is not straightforward due to the measurement precision, to the high number of splices in place in the cold test configuration of the magnets and to the “weakness” of some voltage taps configuration on the test benches. Anyway it will intercept all insulation problems and major high resistance problem too. – An HV test on spool correctors was added. – All Magnets are now systematically tested to ULTIMATE current. 15

Major actions taken at Preparation for the Tunnel Phase (at SMI2): – Doubling the Step: “Final inspection of the extremities” at beginning of activities of SMI2; this is actually intercepting the majority of NC on Flanges, BB and BB support NCs. – A new Step “Diode Check” was added taking also in account the high number of diodes to be installed or changed of polarity. – A new Step “Final Electrical Test” was added for the DIPOLES (it was already present for the SSS). – (Obvious) “extra-sensibility” for anything that can impact the quality of magnet interconnections for main and spool BB (cables status, Cu stabilizers, “spiders”, geometry, quality of the US prolongations, etc. These aspects, as a NC arise, are commented and discussed with the Tunnel Interconnection and Magnet Reparation Teams. NOTE: A lot of actions were taken at the level of the MTF the (Manufacturing Data Base of CERN) to follow coherently the new activities (ex. RE-TREATMENT of magnets arriving from the Tunnel, new Checks or Inspection&Tests, installation of the relief valves, etc.) 16

How many SPARES magnets will remain at the completion of the reparation? 17

Reminding that in LHC we have: -2 dipoles c.m. types (for 1232 units of LHC dipoles) -40 c.m. types (for 360 units of Arc-SSS) -20 c.m. types (for 64 units of DS-SSS) -27 c.m. types (for 50 units of DS-SSS) 18

19 + dipole 1011 (magnet cryostated and tested) reserved for S.7-8 (Coil Cross Section 1; Type A)

SSS or c.m. IDENTITY c.m.TYPE,MQSextupole/ Correct or DiodeSSS TYPE Cryostat Items or STATUS population in LHCext./int. dipole corr. magnettype SSS064LQMOF,27D/FMSCBBMOBLQOAH SSS cryostated. In test configuration. c.m. 005LQMOG,3D/FMSCBDMOALQOAJ - Standard inertia tube - Studs (x4) - Line X short c.m. 006LQMOU,9F/DMSCBCMOBLQOBF, LQOBD To be confirmed after cold test. c.m. 055LQMTF,30D/FMSCBBMQTBLQATI - Standard inertia tube - No studs - Line X short c.m. 072LQMTF,30D/FMSCBBMQTBLQATI - Standard inertia tube - No studs - Line X short c.m. 243LQMTE,30D/FMSCBBMQTALQATH - VB inertia tube - No studs - Line X long c.m. 277LQMOR,9F/DMSCBAMOBLQOBB - Standard inertia tube - No studs - Line X short c.m. 279LQMSD,12F/DMSCBAMQSBLQASE, LQASF - VB inertia tube - PLUGS - NO Xline c.m. 344LQMOU,9F/DMSCBCMOBLQOBF, LQOBD - Standard inertia tube - Studs (x2) - Line X short c.m. 364LQMOF, 27D/FMSCBBMOBLQOAH - VB inertia tube - Studs (x4) - Line X long c.m. 367LQMTE,30D/FMSCBBMQTALQATH - VB inertia tube - Studs (x4) - Line X long c.m. 369LQMTH,18F/DMSCBAMQTB LQATK, LQATM, LQATU - VB inertia tube - Studs (x4) - Line X short c.m. 372LQMOA,2D/FMSCBBMOALQOAB - VB inertia tube - Studs (x4) - Line X short c.m. 080LQMTG,18F/DMSCBAMQTA LQATJ, LQATL, LQATV Under investigation for Leak SSS523LMQTC,6F/DMSCBAMQTLALQTCC For DS SSS Only SMI2 Team is now able to change any configuration at cryostat/VB/plugs level; CHANGE the BB polarity and Correctors layout INSIDE the c.m is not yet possible (see forward)

How many magnets will need reparation? And which type of reparation? 21

- Group B: magnets without direct electrical damage, and no measured displacement (9 units) All de-cryostated to re-use components for cryostating new CMs. Order of intervention: starting from the dipoles showing less probability to have electrical problem - Group A: Dipoles with weak internal splices (2 from LHC, 1 from Spares); “easily” reparable.

- Group C: Dipoles without electrical damage, but displaced (11 units) Order of intervention: from less displaced to more displaced, taking into account that a compression on lyras is less dangerous then a similar actions on CS side

- Group D: magnets with direct electrical damage (10 units) Order of intervention from probably less damaged to more damaged. - 1“old” sick magnet (1055 with suspicious of a potential short inter-turn) from Series Production Phase (but it need extra investigation)

- The tower for vertical assembly and disassembly is being installed at CERN; Ready at end of March. - We need to practice with the “vertical technology” that was never used at CERN before and due to the lack of spares components we need to recover pieces during disassembly. - Reparation will be longer and more complex than for dipoles - Bus bars availability is a critical items (need workshop) - For the MS-SSS, they were all assembled at CERN in a “dipole-like” way and technology is well known. For SSS Thanks for the attention

26

Compare to Main Dipoles, SSS are less (474 versus 1232) but they are more complicate objects at both levels of c.m. and cryostating: They are subdivided in 3 big families looking at their location in the machine: 1. “Arc SSS”: 360 units (40 c.m. types and 10 cryostat types assembled in 61 different types of Arc SSS) 2. “Dispersion Suppressor SSS” (DS-SSS): 64 units (20 c.m. types and 16 cryostat types assembled in 34 different types of DS-SSS) 3. “Matching Section SSS” (MS-SSS): 50 units (27 c.m. types and 33 cryostat types assembled in 41 different types of MS-SSS)

For example: The missing c.m. type (LQMSA/LQMSB) is composed by MQS + MQ + MSCBB + D/F busbars 28 MO: Octupole MQT: Tuning quadrupole MQS: Skew quadrupole MQ (F,D): Main quadrupole MSCB (A,B,C,D): Sextupole- dipole corrector ARC-SSS

29

Starting dateEnd dateUnits/weekMagnet GroupCumulative of repaired spare Oct 2008April 20092New CM prepar.(30) May 2009July 2009Magnet facilities and tooling == Reparation external splice ? (2 minimum) September 2009End November Group B9 December 2009Mid June Group C20 June 2010End of August Gr. D easy23 September 2010December 20101/monthGr. D medium27 January 2011End 2011Gr. D - Rebuilt30 Plan for MB repair

Flow-chart for group B Warm Electrical tests Endoscopy inspection of end domes ok not ok Cold tests Prepare and store as spare ok not ok Cold mass repair Cold tests Analyze and decide ok not ok Extremities reconfiguration Cryostating

Flow-chart for group C Warm Electrical tests Configure as spare ok De-cryostating Cold tests Analyze and decide okok not ok Cryostating endoscopy inspection Open End Cover(s)Damage of bus barNo damage to bus bar Bus bar repair on extremities Splice repair if necessary Cold mass opening and bus bar change Splices γ-ray Splice repair if necessary Cold mass reassembly

Flow-chart for group C Configure as spare ok De-cryostating Cold tests Analyze and decide okok not ok Cryostating Open End Cover(s) Damage of bus bar localized on extremities Extended damage to bus bar Cold mass opening and bus bar change Local bus bar splicing Cold mass reassembly Damage to SC cable to coil or to coil De-collaring and new coil winding Re-collaring