NA 2014-2015 YETS: schedule week by week S. Evrard.

Slides:



Advertisements
Similar presentations
TCC2/TDC2 consolidation WG ALARA COMMITTEE PREPARATION for Xmas stop activities S. Evrard T. Wijnands
Advertisements

NA YETS: schedule week by week S. Evrard.
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Lau Gatignon, EATM, 7 October  The T9 and T10 lines have been running smoothly from mid July and the T11 beam started up very smoothly for CLOUD.
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
Friday Cyo (Thu. 22h) Point 6 – After the energy scan of yesterday afternoon, we have discovered generator B2/MKBH-A (One changed during this TS) has around.
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
TDC2/TCC2 consolidation EATM 15/07/2014. EN/EL – DC and control cable identification and cut completed – Old light removal in TDC2 – New AUG installed.
YETS ACTIVITIES SPS-NA S. Girod & S. Evrard on behalf of the SBA team, EATM,
TDC2-TCC2 consolidation status report to EATM EDMS October 7 th, 2014 S. EVRARD, EN-MEF, on behalf of the TDC2/TCC2 WG.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
S. Evrard — EN/MEF IEFC Workshop, March 08, 2012 TCC2/TDC2 Shutdown Activities and Consolidation Plans On behalf of the TDC2/TCC2.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
HiRadMat : report from WG2 – WANF dismantling WG3 - Irradiation Area October S. Evrard 1 WG2&3 meeting organization Preliminary WBS for related.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
TDC2-TCC2 consolidation status report to RSSO EDMS October 14 th, 2014 E. Harrouch, Q. Bouirek, EN-MEF, on behalf of the TDC2/TCC2 WG.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Maintenance and Accelerator Support RHIC run10. Last Wednesday: Nice recovery Nice recovery Good work all especially: Good work all especially: HP, RF,
- Hearing Session - Marion Picard - July 28 th, 2011 S TATUS OF H I R AD M AT S AFETY F ILE Outline  Safety file Descriptive part Hazard inventory  Demonstrative.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
YETS activities in n_TOF O. Aberle, S. Montesano (EN/STI)
Machine Status  Proton Source Commissioning and Studies 8/13-8/14: Linac & Booster Maintenance Period  Main Injector MI30 vacuum ○ Work continues to.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
09/21/07Shutdown’07 Week 7 F.G. Garcia1 MTA beam line installation Weekly Report September 21, 2007 Period covered: September 14 th September 21 th (Week.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
SPS start up 2014 SPS OP. SPS changes during LS1 New transformers and 18kV cables for MPS. New function generators (FGC’s) with lots of new and different.
Repair of MCWV magnets (TT84 – M2). Works on three magnets : MCWV 693, MCWV 697, and MCWV 701 and the associated XABS Cause of the repair : XABS jam into.
TE-MSC activities in SPS during LS2
EN-HE SPS works during EYETS
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
EN-STI activities in LHC during EYETS
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
LHCb & EYETS
TE-MSC activities in SPS during YETS
K. Foraz on behalf of OSS members
Experimental Areas – LS2 planning
Polarized 3He target installation
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

NA YETS: schedule week by week S. Evrard

Week 51 Painting works in TA801 by Presiozo Repair work of TT84 floor by CE contractor (4/5) ED stop on 19/12 PR PA80 maintenance Light modification H2 zone 152. PPE132 shielding XEMC.516 in PPE 124 Ouverture visee geometres H6 et H8 H6/H8 alignment campaign (TT82 & EHN1)

TA801 painting

Week 2 MCWV: Consignations Service removal Plexiglas protection removal Transport to B. 867 Light modification (and cabinet relocation, in week 3) H2 zone 142. PPE132 shielding PR PA80 maintenance MNP22 (Ship) to be moved - CANCELED Installation XTDV GIF: in progress EHN1 gallery cleaning: not started H6/H8 alignment campaign (TT82)

Week 3 Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 Repair work of TT84 floor(last section) MCWV: Transport to B. 867 PR 537 (TCC2) maintenance EHN1 gallery cleaning Light modification H2 zone 132. H2: zone 142/134 steel beam installation (with QNL500 & QNL 524 removal/reinstallation) H6/H8 alignment campaign (TT82&TCC2) magnet MBW exchange Starter exchange on TDC2 lights. Cubicle exchange in mezzanine (TCC2 led light control)

TCC2 led light control

Magnet MBW exchange in TCC2

MCWV transport from TT84 to B.867

MCWV 867

Week 4 Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 H6/H8 alignment campaign (TCC2) Target T2 T4 T6 upgrade (preparation) Slot for magnet MBW exchange(Friday) Open survey shielding at the end of TCC2(by Wednesday) and TT83 door (by Tuesday) Overhead crane load test (PA80 & TCC2) MDX magnet installation MDX service connexion Covers on DC cable cumbs (Test + implementation) ILS tetra installation

TCC2 new MDX S. Girod EM-MEF11

TCC2 new MDX S. Girod EM-MEF12

Week 5 Target T2 T4 T6 upgrade (target box, monitors and motors) Water leaks TDC2 Réparation des fuites et/ou remplacement des vannes si réparations impossible S5 (B. Bannister) Remplacement de 4 réducteurs de pression sur T2 T4 T6 et TCSC (F. Moro) S3,4,5 H6/H8 alignment campaign (TCC2) H6 collimator exchange Reserve slot for magnet MBW reinstallation MBPL 498 magnet to be installed in H4_134 Re-Connexion of vacuum pipes, collars,.. H6 & H8.

Week 6 Contingency week H6/H8 Visual patrol (after survey) Alignment of new magnets (MDX, MCW, MBPL, collimator H6) Closure of all the areas on Friday 6 th at noon OP patrol on Friday 6 th PM

Week 7 DSO tests on 09/02 AM Beam to SPS: 09/02 PM Scan EHN1 Later MCWV repair and reinstallation before MCWV control cable replacement restart of P+ run in April