S. Ritz 1 GLAST Science Policy Document Outline Action Item GUC Meeting June 2005 R. Brissenden S. Ritz Gamma-ray Large Area Space Telescope.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Astrofisica Gamma dallo spazio: AGILE e GLAST 2 -3 LUGLIO 2007, ASDC – ESRIN, Frascati Collaborazione LAT Data policy R. Bellazzini INFN.
Advertisements

Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
GLAST Science Support CenterAugust 9, 2004 Overview of Analyzing GLAST Data David Band (GLAST SSC—GSFC/UMBC)
Peter Griffith and Megan McGroddy 4 th NACP All Investigators Meeting February 3, 2013 Expectations and Opportunities for NACP Investigators to Share and.
Grant Writing 101 Carla Littlefield August 20, 2013.
Breach of a Requirement of the Code Marisa Orbea New York 19 June 2012.
CXC Response to June 04 Report 1.Bakeout Status: Paul Plucinsky 2.CIAO upgrade information: Jonathan McDowell 3.DS9 and visualization scripts: Jonathan.
19 Oct 2005Chandra Users' Committee Cycle 7 Peer Review: June 2005  747 proposals, 12 panels, 101 reviewers  Hilton, Logan Airport.
Chandra Users’ Committee, Oct 2009 Chandra Director’s Office Cycle 11 Peer Review Proposal Numbers:  668 submitted proposals  *5.6 oversubscribed.
Chandra Users’ Committee, Oct 2006 Chandra Director’s Office Chandra Director’s Office Proposal Cycle 8  725 submitted proposals  *6.4 oversubscribed.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
CXC Manager’s Status Report Chandra User Committee Meeting Roger J. Brissenden 25 June 2002.
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT Project 1S. Ritz Discussion: To Where From Here? DC2 Closeout Meeting 2 June, 2006 S. Ritz Gamma-ray Large Area Space Telescope.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
Proposals A Template. In Organizations & Workplaces: proposals… 1.Clarify work agreements within and outside the organization 2.Set forth your productivity.
Instructions for completing the CTOP web survey for periodic reporting.
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
Archiving 40+ years of Planetary Mission Data - Lessons Learned and Recommendations K. E. Simmons LASP, University of Colorado, Boulder, CO
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Presentation on GLAST Data Policies to Users Working Group October 22, 2003 GSFC Jonathan F. Ormes – Project Scientist Donald A. Kniffen - Program Scientist.
Sept. 2, 2005SWG meeting GLAST Users Committee (GUC) Report Josh Grindlay GLAST SWG Meeting SLAC Sept. 2, 2005.
The GLAST Science Support Center’s Role in Supporting the User Community [24.10] Thomas E. Stephens (GSFC/L-3GSI) for the GLAST Science Support Center.
Step-by-Step Guide to Completing Biennial Report Reviews in SharePoint Accreditation Department June 2008.
Bucharest, June 2002 Transfers Task Force Report Bucharest ICANN Meeting June 2002.
Solar-B SOT/FPP 1 SOT April 2006Ted Tarbell SOT Collaboration & Data Policy Ted Tarbell, for the Science Working Group 18-Apr-2006.
Serving Data to the GLAST Users Community Thomas E. Stephens (GSFC/RSIS) for the GLAST Science Support Center Abstract.
GLAST Science Support CenterAugust 9, 2004 Users’ Committee Meeting GSSC USER SUPPORT David Band – GSSC.
GLAST Science Support CenterNovember, 2005 GSSC User Committee Meeting Tools for Mission and Observation Planning Robin Corbet, GSSC
Serving Data to the GLAST User Community Don Horner (L3 GSI/GSFC) and the GLAST Science Support Center Team Data Properties and Impact on Data Serving.
GLAST Science Support Center November 8, 2005 GUC Meeting GSSC Report David Band (GSSC/JCA-UMBC)
1 S. Ritz Data Policies & GO Program Status GUC August 2004.
1 Proposal and Observation Handling Ravi Sankrit (User Support Scientist) SSSC May 11, 2011.
1 Program Release 2008 Update to the Administrative Council August 9, 2007.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
PhysPAG Technology Study Analysis Group (SAG) Status Roger Brissenden for the TechSAG team 8 January 2012 AAS Austin, TX 1.
GLAST Science Support Center May 8, 2006 GUC Meeting Status of GLAST User Support David Band (GSSC/JCA-UMBC)
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST Science Support Center November 17, 2006 GUC Face-to-Face Meeting GLAST GI Program (with revised schedule) David Band, GSSC.
1 Fermi Gamma-ray Space Telescope Users Group Meeting December, 2013 Mission Status Update J. McEnery.
1 Fermi Gamma-ray Space Telescope Users Group Meeting 6 February 2009 Mission Status Update (since the phonecall) and Issues S. Ritz, J. McEnery.
Mission Status - S. Ritz 1 GLAST The Gamma-ray Large Area Space Telescope Mission Status DC2 Kickoff 1 March 2006 S. Ritz Gamma-ray Large Area Space Telescope.
Fermi Science Support Center September 26, 2008 FUG Face-to-Face Meeting Fermi GI Program Update David Band, FSSC CRESST/GSFC/UMBC.
1 Getting Involved with GLAST Workshop, CFA, 06/21/ C. Shrader, NASA/GSFC GLAST Data & Software Release plans + Science Support Center Services C.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
Open Public Meeting February 28, pm – 5 pm 1 Ashburton Place, Boston MassHealth Demonstration to Integrate Care for Dual Eligibles.
GLAST Science Support Center May 8, 2006 GUC Meeting AI#28. SAE Release Schedule David Band (GSSC/JCA-UMBC) Julie McEnery (GSFC)
GLAST Science Support Center November 8, 2005 GUC Action Item #15 AI#15: Pre-Launch GI Proposal Tools David Band (GSSC/JCA-UMBC)
Research Interest Group (RIG) Chair Orientation
The GLAST Science Support Center
Preparation of the Self-Study and Documentation
CEOS Work Plan Steven Hosford WGCV-43/WGISS-45 10th April 2018
David Band – Science Lead, GSSC
User instrument policy
GLAST Large Area Telescope
LAT Operations Scenario Subsystem Meetings
Observation and Checkout Modes (1) - Introduction -
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Lisa Harvey-Smith Institute of Astronomy The University of Sydney
Presentation transcript:

S. Ritz 1 GLAST Science Policy Document Outline Action Item GUC Meeting June 2005 R. Brissenden S. Ritz Gamma-ray Large Area Space Telescope

S. Ritz 2 Planned Sections Introduction and Scope Processes –How Policy is Made –Policy Document Control –Complaint and Appeal Science Observing Policy Data Management Policy GO Program Internal Project Policy That May Impact Users Publication Policy

S. Ritz 3 Processes How Policy is Made (Policy Policy) Project Scientist controls document, with concurrence from HQ and GUC (through the chair). Policy document shall be posted on GSSC website and GUC website. Policy Document Control Baseline, tracking and revision Complaint and Appeal Address process for different issues: peer review, data product/software/support related

S. Ritz 4 Science Observing Policy TOOs: define (planned – peer review, unplanned - MDT); scheduling path and timing Discretionary time (MDT) (see other action item slides) Observing –definition of sky survey –observing plan for year 1 –target fractions of scan vs point after year 1; peer review process after year 1 and consultation with GUC and Instrument PIs. –timeline planning responsibilities replan and reobservation granting policy in case of errors or other problems –GRB repoints –calibrations, engineering times Control of observatory operations parameters affecting science

S. Ritz 5 Data (and associate SW) Management Year 1 vs later years Year 1 data release policy Archive plan and access Policy for data categories –science (including TOOs), alerts, raw instrument data, calibration, housekeeping and engineering data, etc. Policy on availability of each level of processed data Data discarding policy IDS roles and data access

S. Ritz 6 GO Program Purpose/Goals of GO program Types of support (GO, theory, large projects, legacy, etc.) and who is eligible. Conflict of interest policy for GLAST-funded staff. Observing proposals –who is eligible –peer review and selection guidance Multiwavelength planning, coordination, and observing support Fellows program Consultation with Instrument Teams in Peer Review Process Note: details of GO program expected to be contained in NRA, grant terms and conditions, and possibly a Science Solicitation Plan (cf Chandra SSP).

S. Ritz 7 Internal Policy Affecting Users Any agreements between project and PIs (and between PIs) affecting observing and data Science research time available to GSSC staff Policy on instrument team membership of GSSC staff Publication Policies Required acknowledgements Reference instrument team publication policies LAT use of GBM data during year 1

S. Ritz 8 Suggested Schedule & Responsibilities would like inputs (bullets fine) for outline and for each section –inputs welcome from any GUC member, but would like to assign at least one person for each section to give inputs. Deadline: 20 June revised outline: Steve and Roger, 27 June first rough draft by Steve to Roger by 15 July, iterate second draft by Steve by 15 August draft to GUC in time for a GUC telecon (mid-Sept?) Aim to have document baselined (a few TBXs likely) for initial release sometime soon after the next GUC F2F meeting. –subsequent review linked to first NRA

S. Ritz 9 Inputs for Sections Introduction and Scope (who) Processes (who) –How Policy is Made –Policy Document Control –Complaint and Appeal Science Observing Policy (who) Data Management Policy (who) GO Program (who) Internal Project Policy That May Impact Users (who) Publication Policy (who) WHAT ELSE IS MISSING?WHAT ELSE IS MISSING?