The Proposed Poseidon Seawater Desalination Facility

Slides:



Advertisements
Similar presentations
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Advertisements

Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
State Water Resources Control Board and Regional Water Quality Control Boards Regulatory Authority Review and Concepts for a Statewide Order for Composting.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Test Slant Well Construction Cost Estimate 1 Slant Test Well - Drilling & Installation$2,300,000 Material Advance Purchase - Pump, Column, Casing, Screen$700,000.
Creating a Sustainability Index for Water Planning in Southern California Presented at: AWWA ACE-09 June 18, 2009 Dan Rodrigo Vice President CDM 523 West.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #2 May 28, 2008 SCAQMD Diamond Bar, California.
State Water Resources Control Board Jonathan Bishop Chief Deputy Director California Energy Commission Workshop April 27, 2015 Alternative Energy Stocks.
BACWA Wet Weather Management Workshop Spill Notification Requirements Melissa Thorme Downey Brand LLP Sacramento, CA
Carlsbad Desalination Project
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
1 Assessment Process for new Mining Leases (SA Mining Act 1971) May,2006.
Policy Position Statement.  Ground Water Replenishment (GWR) - by Monterey Regional Pollution Control Agency (MRWPCA) and Monterey Peninsula Water Management.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Jim Heitzman General Manager Marina Coast Water District
Desalination, With a Grain of Salt: A California Perspective Desal Response Group Aquarium of the Pacific October 2006.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Clean Water Act Section 316(b) Proposal Regulations for Cooling Water Intake Structures at Existing Facilities April 6, 2011.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
A Unified Voice for Water Desalination And Salinity Management in the Golden State! Multi-State Salinity Coalition Annual Salinity Summit January 26, 2012.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Surfrider Foundation Desalination Issue Summary. Surfrider Foundation Mission Statement “a non-profit environmental organization dedicated to the preservation.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
Monterey Peninsula Water Supply Project April 23, 2012.
Scientific Approaches to Assess Impacts Associated with Seawater Desalination Susan C. Paulsen, Ph.D., P.E. Vice President and Senior Scientist Desal Conference.
Advisory Committee Kickoff Meeting SWRCB Program to Develop Sediment Quality Objectives for Enclosed Bays and Estuaries of California July 29, 2003 CAL/EPA.
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
Intersection of Environmental Programs and Energy Reliability Objectives CFEE Roundtable Conference on State and Regional Energy Issues October 8-10, 2007.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Siting Considerations in Evaluating Coastal Desalination Facilities Thursday August 15, 2013 Leila Monroe, Senior Attorney Oceans Program, NRDC Presentation.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
© POSEIDON WATER THESE MATERIALS HAVE BEEN PROVIDED TO THE COASTAL COMMISSION STAFF Huntington Beach Project Coastal Commission Hearing November.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Solar Power Project at the Sacramento Regional Wastewater Treatment Plant August 26, 2015.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
December 6, 2004CIWMB P&E Committee Workshop1 Postclosure Maintenance Postclosure Maintenance Beyond the Initial 30 Years and Financial Assurance Demonstrations.
1 Overview of Round 3 North Coast Regional Stakeholder Group Marine Protected Area Proposal Presentation to the MLPA Master Plan Science Advisory Team.
North Coast Marine Protected Areas Presentation to the California Fish and Game Commission October 19, 2011 Monterey Department of Fish and Game – Marine.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
Item W16a February 8, 2012 CCC Hearing A-6-OCN (Altman) 1823 South Pacific Street City of Oceanside.
Proposed EPA Power Plant Cooling System Regulations.
(input from the Directorate: Coastal Pollution Management Status of legislation and policies regulating the development and practice of aquaculture Oceans.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
1 Overview of MLPA Blue Ribbon Task Force North Coast MPA Proposals and Special Closures Recommendations Presentation to the California Fish and Game Commission.
Protecting the Lives of our Community Every single day, much of what we do goes by without much notice. Without fail, we work hard to protect the lives.
Poseidon Desalination Appeal Update Residents for Responsible Desalination Surfrider Foundation Orange County Coastkeeper.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Phase 2 Hope Bay Belt Project
What’s Next for Potable Reuse in California
Test Slant Well Project Permit Amendment (Coastal Commission Agenda Item Tu 15a) Date: Oct. 6, 2015 Presented by CAW at the Oct. 6, 2015, California Coastal.
California’s Plan to Deal With Once-Through Cooling At
River Basin Management Flood protection
Brackish Water Desalination Project
Delta Water Supply Project
Brackish Water Desalination Project Draft EIR
Salt and Nutrient Management Plans
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Carlsbad and Huntington Beach Seawater Desalination Facilities
Presentation transcript:

The Proposed Poseidon Seawater Desalination Facility A Practical Assessment of Need, Feasibility, Environmental Impacts, and Policy Implications PRESENTED BY: This needs points from Debbie

Poseidon’s Desalination Plant is Not Needed

Source: www.poseidonwater.com Poseidon: What They Do “We secure premier desalination plant locations co- located with power plants….with the capability to intake or discharge seawater….” “Technology neutral approach enables tailored cost- optimized projects.” “Possess intellectual property for desalination co-location with power plants.” I could not get rid of the second text box so please remove it. Is there a way to put a footnote to their website page? Source: www.poseidonwater.com

CA Statewide Policy Advances-- Poseidon’s Desal Design Doesn’t Policy Advancements Since Approval of Carlsbad Plant in 2007 2010 SWRCB orders phase out of open ocean intake at 19 coastal power plants including Carlsbad and AES. MPAs for Southern CA are approved by Fish & Game Commission. 2014 SWRCB intends to adopt the Ocean Plan Amendment that establishes statewide standards for desalination facilities. 2005 SWRCB policy discussion begins to phase out open ocean intakes begins. 2007 Poseidon Carlsbad CDP approved with open ocean intake. 2012 AES applies to decommission open ocean intake by 2020 or earlier. 2011 SWRCB convened Expert Panels in preparation for Statewide Desalination Policy. 2013 SWRCB Expert Panels on Desalination publish recommendations. SWRCB to release Draft Policy before 2014.

Co-Location vs. Best Available Technology Poseidon Co-locates with power plants to reduce construction costs Open ocean intake maximizes marine life mortality with potential adverse impacts to MPAs Open discharge results in large brine plume Designed for profit Best Available Technology Located where needed and site conditions are optimal Subsurface intake minimizes marine life mortality and limits potential adverse impacts to MPAs Spray brine diffuser reduced brine plume up to 90% Designed to meet need

Subsurface is Feasible Operational Subsurface Seabed Infiltration Gallery in Fukuoka, Japan Singular intake from multiple galleries No surface facilities No adverse impacts to public access and vista Poseidon's Distorted Depiction of Subsurface Intakes Multiple intake pipelines to shore Surface pump stations Adverse impacts to public access and vista Is this picture on the left from their presentation. I want to use THEIR slide and the worst one possible. The pic on the right was not very descriptive so I changed it.

Poseidon Must Prove that Subsurface is Infeasible Poseidon cites several Water Globe reports and memos to claim that subsurface intakes are infeasible. Report was prepared by Nikolay Voutchkov, a former Senior Vice President for Technical Services for Poseidon Resources. Voutchkov is the inventor of the patent for co-location that was assigned to Poseidon Resources in 2005. The CCC cannot rely on the Voutchkov ‘report’ to determine infeasibility.

Poseidon Never Proved Subsurface is Infeasible Others performed onsite feasibility studies first, then designed their project. Poseidon designed its project first and never performed site specific studies offshore. A report submitted 6 weeks ago by a former Poseidon employee only indicates wells cannot be built. Staff has never suggested wells.

Poseidon and SDCWA Accounted for Subsurface Intakes in their “Financial Planning” for Carlsbad The Water Purchase Agreement acknowledges that a new intake system could be required in 2017 at Carlsbad given a ‘change in law’ as a result of the “closure and decommissioning” of the open ocean intake as required by the OTC policy. Poseidon and the SDCWA told the New York Times in 2013 that they had accounted for the “eventuality” of subsurface intakes in their “financial planning.” Carlsbad was successfully financed with $734M in Tax Exempt Private Activity Bonds and $189M in private equity based on the WPA as collateral.

Proposed Open Ocean Intake Obsolete technology built in 1958 for a Power Plant Documented marine impacts 100 mile Source Water Population (SWP) Tons of chemical additives a day 4 million+ gallons of wastewater discharge per day

Brine Discharge Hypersaline brine contains residual chemicals, degrades water quality and displaces marine life Proposed vertical open discharge designed for hot water not brine Spray Brine diffuser would reduce Zone of Initial Dilution (ZID) by 90%

Biological Extent of Impacts Total larvae for which impacts are assessed and source water areas are calculated. Total larvae sampled Total larvae entrained Total organisms entrained From Raimondi, Variation in Entrainment Impact Estimations Based on Different Measures of Acceptable Uncertainty, 2011. 12

There are Nine Coastal MPAs within 25 miles of the Huntington Beach Generating Station Bolsa Chica Basin and Bolsa Bay SMCAs HBGS Point Vicente SMCA Abalone Cove No Take SMCA Upper Newport Bay SMCA Crystal Cove SMCA Laguna SMR and No Take SMCA Dana Point SMCA Image credit: NRDC

California’s Marine Protected Areas Have Been Designed to Function as a Network MPA Marine Protected Areas

The Coastal Act Contains Implicit Protections for MPAs Photo by Dana Murray Photo by Marc Shargel

Poseidon’s Temporary Permits are not Entitlements Temporary Co-Location Permits NPDES Permit State Lands Commission Lease California State Parks Easement Department of Public Health Pipelines Routes within Costa Mesa Permit for Standalone Operation 2020 Not Final EIR May Be Required

Temporary NPDES Permit Under temporary stand-alone operations, the Discharger has little control over the intake structure. Under these conditions, the existing intake meets the best available design criteria. Pursuant to Water Code Section 13142.5(b), the direct connection of the desalination plant to the HBGS's cooling water system pipelines represents the best available design feasible to minimize intake and mortality to marine life from the Facility's temporary stand-alone operations. Because different and/or better designs may be feasible in the future under long-term stand-alone operations, the Regional Water Board will reevaluate the Facility's compliance with Water Code section 13142.5(b), best design available requirement, under those conditions.

Poseidon Intentionally Provided False Information in Carlsbad GHG Plan 2008 GHG Hearing: Poseidon assured the Commission that “water from the desalination plant will provide direct, one-for-one replacement of imported water”—Nov. 9, 2007 Poseidon letter 2010 Revocation Hearing: “Water eligible for MWD’s subsidy exclud[es] any Desalinated Seawater that…will not augment water supply.”—2005 MWD agreement Need to add bullet points in. And this cite from the 2005 is not the clearest language. Is there anything that is more direct and not convoluted? AC “We expect MWD to take its full SWP and Colorado River rights and entitlements for the foreseeable future”—Jan. 20, 2010 MWD/SDCWA letter

Poseidon Has Provided The Same False Information Again HB GHG Plan: “Poseidon will be credited with emission reductions associated with the replacement of imported water from the SWP.” Staff Report: “Poseidon’s project will not ensure a decrease in imported water supplies to Southern California…this [automatic] ‘crediting’ approach to achieving carbon neutrality is not warranted.”

Which Project Design Offers More Jobs? Poseidon Plant as Proposed Continued Use of Open Ocean Intake Pipe Constructed in 1958 CCC Staff Recommendation Additional Construction of: Water Infiltration gallery Subsurface Pump Station Connecting pipes Service road This goes as the next to last slide. The extra construction is what Poseidon told Bocho they would have to construct.

Which Desalination “Train” Will Leave the Huntington Beach Station? 1950’s Technology 21st Century Technology