Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.

Slides:



Advertisements
Similar presentations
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Advertisements

Present Procedure for cutting stuck casing on Drilling PLATFORM
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
Hans Jostlein, Lar Workshop, November 4, Liquid Argon TPC High Voltage Issues.
D. Peterson, “The Cornell/Purdue TPC”, LCWS05, Stanford, 21-March The Cornell/Purdue TPC Information available at the web site:
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Installation. Indoor Unit Installation Typical Installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Detector R & D in the 35 ton Membrane Cryostat 9/11/2015HV Feed for BNL Meeting1 Hans Jostlein This is a draft and a list of possible studies. The main.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Dimensions of the PDM frame: 167mm x 167mm x 28.7mm.
Setting up the Ricoh C305 Press F5 to start the Presentation
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
TPC Design Concept: From MicroBooNE to LAr20
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Dual PD Amp Circuit Board Test Results By Alexa Staley LIGO G v1 1.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
Long Bo FT and Flanges April 12, 2012 talk Hans Jostlein 12/19/2015Long Bo FT and Flanges1.
Summary of the Electrical Feedthroughs. 2 SFT Channels for the 3x1x1 m 3 N. 6 cold + N. 6 warm on a D=222mm flange (each with 20x68pin connectors)
S. Pordes - FNAL May 13th Purity Monitor - Description and Experience at Fermilab Production of Clean Argon - Description of Filtering System and.
9th April 2009based on a presentation prepared by D. Schinzel 1 COSMIC RAY DETECTOR.
CLAS12 Drift Chamber Prototyping
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
February 2010Hans Jostlein1 Cellular Design for a Large Liquid Argon TPC Detector - Design goal -Cellular Design -Additional Possibility: -Light Detection.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Concept Design for LBNF Far detector (LAr single phase)
1/26/2009 S. Pordes LAr R & D Briefing 1 Liquid Argon presents prospect of continuously live Imaging Calorimeter C. Rubbia.
Ions in LAPD Can we Observe Them in Long Bo ? 3/6/2016 Ions in LAPD Sarah Lockwitz and Hans Jostlein, Fermilab 1 Sarah Lockwitz and Hans Jostlein Fermilab.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
35ton and LAPD cryostats and future DUNE detector development.
Practical experience with the AD Stochastic Cooling Murphy’s Law R. Louwerse.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
Liquid Argon Purity Monitor Testing Bonnie Weiberg TRAC Program Summer, 2015 ICARUS clone made at FNAL (S. Pordes - FNAL May 13th 2006)
HV Feedthrough Tests for the LBNE Meeting Status of R&D 6/26/2016HV Feed for BNL Meeting1 Hans Jostlein.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
In-Vessel Electronics Infrastructure Craig Thorn LAr40 Cold Electronics Far Site Review, December 6-9, 2011.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
35T Phase 1 and the PrMs AHahn PAB Meeting, 4/9/14 1.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
35 Ton Membrane Cryostat Temperature Profiler Proposal Hans Jostlein Fermilab 7/13/ ton Temperature Profiler Hans Jostlein, Fermilab 1.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Installation of the T600 at Fermilab
Instrumentation Used in LAPD and 35T Runs (Dune DocDB 1759)
PMT cabling Gian Luca Raselli INFN Pavia
Warm structure requirements :
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Tagger Microscope Mounting, Shielding & Cooling
PBC Method Flat Mirror Gas Mixture Dielectric Mirror Pump Window PM
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
Liquid Argon TPC High Voltage Issues
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1

What is it ? Purpose December 15, 2015 Long Bo for LAPD 2 Demonstrate a working TPC with long drift in LAPD Demonstrate a working HV system Demonstrate low noise

What is it ? List of Items: Use the original Bo chamber, including electronics Extend it to 2 m length (from 0,5 m) by adding 3 drift cage cylinders Make a new HV feedthrough, cable type, which will also validate this design for MicroBooNE and lbne Build a trigger system from 16 scintillation counters Option: add a photocathode and 3 fibers to get signals from the full drift length Option: Add a 10 m long wire (folded) with a single channel pre- amp to measure noise, with and without using a noise antenna December 15, 2015 Long Bo for LAPD 3

December 15, 2015 Long Bo for LAPD 4

Installation Flange Scheme The existing large top flange (35 ½” diameter x ¾ “ thick) will be removed and replaced with a similar flange, which has a 18” diameter hole, surrounded by a tapped hole circle to hold a 20” diameter sub- flange. This is to make the Long Bo assembly smaller and much lighter December 15, 2015 Long Bo for LAPD 5

December 15, 2015 Long Bo for LAPD 6

The Long Bo Assembly The Long Bo Assembly comes in two parts, to ease transportation: Top Assembly: A top (20 inch sub-) flange which holds: The existing Bo TPC with amplifier boards, minus its cathode and one field cage extension The Chamber signal cable tube the HV feedthrough The fiber feedthrough (The 3ft flange holds flanges for: the single channel noise sensing antenna wire a noise injection antenna ) A spare 8” OD CF flange December 15, 2015 Long Bo for LAPD 7

The Long Bo Assembly The Long Bo Assembly comes in two parts, to ease transportation: Bottom Assembly consist of: The bottom two field cage extension cylinders, with the original cathode installed The cathode with its photocathode and fiber holders The lower half of the HV feedthrough The PEEK fiber tubes, which are looped and will be fed through their feed through flange after the two halves of the TPC are connected. December 15, 2015 Long Bo for LAPD 8

December 15, 2015 Long Bo for LAPD 9

December 15, 2015 Long Bo for LAPD 10

Modifications to Bo Make a new 35 ½” flange Make the sub flange with its own sub-flanges Make 3 field cage extension cylinders Make a longer cable shield tube Make longer signal cables Remove the cathode assembly Install a photo cathode and fiber holders on the cathode and bottom field cage section. Make a new HV system: December 15, 2015 Long Bo for LAPD 11

Modifications to the HV System Make a new HV Feedthrough, cable-based Adapt the TPC mounting clamps to the new FT Insert transition pieces to provide a break at half-height and adapt the bottom end of the HV supply to the cathode connection Obtain and adapt two “surge resistor boxes” from Jim Walton, as parts of the HV noise filter Use the Tevatron 250 kV Glassman supply Buy more HV cable to reach the ground where the HV supply will be December 15, 2015 Long Bo for LAPD 12

December 15, 2015 Long Bo for LAPD 13

December 15, 2015 Long Bo for LAPD 14

The Light Pulse System It will be useful to be able to detect electrons from a photo cathode mounted on the inside of the cathode mesh: We can test the complete system without waiting for cosmic rays Do precision studies of drift time versus HV Get electron loss data versus drift time from the same studies December 15, 2015 Long Bo for LAPD 15

The Light Pulse System Design We will use three fibers, each in its own PEEK capillary (1/8” OD x 1/16” ID) The capillaries have sufficient stiffness to protect the fibers The capillaries and fibers are continuous from the flash lamp to the photocathode The capillaries are sealed at the flange using commercial quick-disconnects (see next slide) The capillaries are purged on the inside continuously by a tiny Ar gas flow The fibers are loose in their capillary and can accommodate thermal shrinkage an motion The capillaries and fibers make a flexible connection to the light flasher, located close to the flange December 15, 2015 Long Bo for LAPD 16

Light Fiber Details December 15, 2015 Long Bo for LAPD 17

Noise on Long Wires Along with the Long Bo TPC test in LAPD, it may be interesting to measure noise on a long (maybe 10 m long, folded) wire in LAPD. Bo has very short wires and may not be a noise good model for lbne or MicroBooNE. One would mount a wire of length 2.5 m x 4 times on a G10 tube off the 35 ½” flange. The same flange would hold the connector(s) and, possibly, the warm or cold single channel amplifier. The measurements could be done with a spectrum analyzer if we get enough gain in a pre-amplifier (warm or cold). I am guessing here, but we'll need between 1000 x and a million x current gain. I am sure Dan Edmunds will have a more accurate idea. A second (conducting) rod could be mounted on a separate flange and would be driven with fixed frequencies or white noise to make a separate sensitivity check. December 15, 2015 Long Bo for LAPD 18

TPC insertion while LAPD has LAr? The boil-off wiill protect the purity of the Lar while the flanges are changed First remove the large flange and replace it with the modified one Bring the upper half of the TPC assembly to the platform and suspend it Attach the lower half Remove the small (20”) blank sub flange Install the TPC assembly: December 15, 2015 Long Bo for LAPD 19 Supplied Air Suit

December 15, 2015 Long Bo for LAPD 20