International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,

Slides:



Advertisements
Similar presentations
FAIR – Status Report Walter F. Henning NuPECC Meeting -- March Venice.
Advertisements

Darmstadt Helmholtz Center for Heavy Ion Research Facility for Antiproton and Ion Research FAIR = A New International Facility next to GSI.
FAIR – Facility for Antiproton and Ion Research * FP6 Proposals * Status and Recent Activities Walter F. Henning / GSI Darmstadt NuPECC, Lisbon, November.
Site report GSI Darmstadt FAIR project Overview IT at GSI
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt EU FP7 FAIR pp - 1st Reporting meeting March 6, 2009 J. Eschke, GSI EU.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
FAIR GmbH and FAIR Project History, Status and Outlook
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
The Facility for Antiproton and Ion Research in Europe Günther RosnerNuPECC, Sevilla, 5/10/121.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Status of FAIR Yuri Zaitsev (ITEP) Physics of Compressed Baryonic Matter 1-st CBM-Russia-JINR Collaboration Matter May 19-22, 2009, Dubna, Russia.
Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.
FAIR – Facility for Antiproton and Ion Research
FAIR – Status Report Walter F. Henning.
D. Krämer - Tech. Discussions GB, Oct. 11 th, 2006 Workpackages and In-Kind Contributions to FAIR The FAIR Project Preparatory Phase - R&D for FAIR Workpackages.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt A Status Report Hans H. Gutbrod CBM collaboration meeting 7. July.2003.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to NuPECC Alex C. Mueller,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study Annual Report meeting December 7, 2006 J. Eschke,
The new FAIR accelerator complex at GSI: Project, Challenges, First steps Ralph C. Bär ICALEPCS, 16. October 2007.
Helmholtz Centre for Ion Research G. Moritz, Cryogenic Expert meeting, GSI, September 19/ (courtesy of D. Krämer for the FAIR Design Team) Current.
FAIR – Facility for Antiproton and Ion Research Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Status of the FAIR project Visit in Wuhan,China November 23, 2006 J.
2 February 2009Ö. Skeppstedt1 FLAIR Collaboration Meeting 2–3 February 2009 Manne Siegbahn Laboratory, Stockholm FAIR status from the AFI chairman point.
EPOCA – 11. June EPOCAConsortiumOrganisation.
FAIR Facility for Antiproton and Ion Research Guenther RosnerNuPECC, Prague,
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
AIDA negotiation process AIDA NCP Meeting,
1 Plans for JINR participation at FAIR JINR Contributions: ● Accelerator Complex ● Condensed Baryonic Matter ● Antiproton Physics ● Spin Physics Physics.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Financial reporting – design study 7 December 2006 F. Weissbach, GSI.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Welcome to FAIR RF Review for TAC Meeting in June 2007.
EURONS The EUROpean Integrated Infrastructure Initiative in Nuclear Structure within FP6 Present status and remarks to FINUPHY Alex C. Mueller,
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
NuPECC Mapping Studies FINUPHY/EURONS I3 EURONSFINUPHY/FP5 EURONS/FINUPHY Meeting, Funchal (Portugal), 7-9 February 2005 NuPECC Report 2002 “Impact, Applications,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 3rd Annual Report meeting January 29, 2008 J. Eschke,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Construction of FAIR Phase-1 December 2005 J. Eschke, GSI Construction.
Proposed strategy for the FAIR science program Boris Sharkov Scientific managing director FAIR NuPECC Sweden FranceIndia Finland GermanyPoland.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR CNI 2nd Annual Report meeting October 11, 2007 J. Eschke, GSI DIRAC-Phase-1.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP.
Alex C. Mueller for EURONSNuPECC Meeting, Venice (Italy), March 2005 I3 EURONS: a status report to NuPECC March 2005.
1 FAIR Project – status and research program Zbigniew Majka – FAIR Joint Core Team, Head of Research Facility for Antiproton and Ions Research Helmholtz.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
O. Kester, NuSTAR annual meeting, 27/02/2013
GSI Helmholtzzentrum für Schwerionenforschung GmbH GSI visitation W. Barth W. Barth, WAO 2014, Mainz/Germany.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt The Facility for Antiproton and Ion Research Peter Malzacher, GSI EGEE'09,
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Progress Report Günther RosnerNuSTAR Annual Meeting, Darmstadt, 29/2/121.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
Inti Lehmann Facility for Antiproton and Ion Research Darmstadt, Germany PANDA Collaboration, Giessen – 18 March 2014 Status and News from FAIR.
Status of FAIR D. Krämer Dec. 1&2, 2010 – 4th MAC Meeting 1.
CBM Timeline Walter F.J. Müller, FAIR, Darmstadt
AMICI WP1 – Management, coordination and dissemination
ESS Innovation Procurement Workshop
Gunnar Buckau, Forschungszentrum Karlsruhe, Germany
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
AMICI WP1 – Management, coordination and dissemination
FAIR – the Universe in the labororatory
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Presentation transcript:

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Introduction and Status EU CNI contract Kick-off meeting December 1-2, 2005 J. Eschke, GSI 1.Introduction  Submission of Proposal  EU contract 2.Scientific and technical scope of CNI 3.Participating institutes / distribution of work and financial resources 4.Management of CNI 5.Status legal documents and next steps 6.Agenda of the meeting

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR FAIR applications: Design Study "DIRACsecondary-Beams": (Feb Jan. 2008) application to EU: 10 Mio€ ( 9 Mio€ approved, total budget ~ 22 Mio€ ) (31 participating institutes) Construction of new infrastructure "DIRAC-PHASE-1": (Oct 2005 – Sept 2009) application to EU: 14,8 Mio€ ( 10,4 Mio€ approved) EU funding 100% for Construction (up to 10% of total construction cost) (13 participating institutes) EU Support for Research Infrastructures in FP6 "Design Studies" and "Construction of new infrastructures"

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR History of the FAIR CNI Proposal: mid 2003: Start preparation of proposal : Submission of proposal : Start of contract negotiations September 2005: completion of contract negotiations : signing of EU contract by Coordinator GSI  Start of contract 1. October 2005 (duration 48 month)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Primary Beams /s; GeV/u; 238 U 28+ Factor over present intensity 4(2)x10 13 /s 30 GeV protons /s 238 U 73+ up to 35 GeV/u Secondary Beams Broad range of radioactive beams up to GeV/u; up to a factor in intensity over present Antiprotons 3(0) - 30 GeV Storage and Cooler Rings Radioactive beams e – A(RIB) collider stored and cooled 3(0) – 15 GeV antiprotons Cooled beams Rapidly cycling superconducting magnets Key Technical Features Scope of CNI:  FAIR injector SIS18 intensity upgrade (HADES, R3B) Scope of Design Study:  secondary beams (RIB and Antiprotons) FAIR SIS100/SIS300 HESR PANDA CR GSI Accelerator Facilities NESR Super- FRS HADES* / CBM NUSTAR HADES* R3B SIS18

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Participants 13 participating institutes

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Tasks and Taskleader

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR CNI contract negotiations CNI instrument: 100% EU funding of specific component(s) (up to 10%) of a new research infrastructure,  The construction of the other parts of the new facility (at least 90%) have to be funded from other resources (during the duration of the EU contract) Application: 14,86 Mio€  Contract: 10,4 Mio€  Reduction of 30% of the funds applied to each CNI (sub)project: 1.) SIS18 upgrade  30% of the costs covered by GSI 2.) HADES upgrade  reduced by 30% 3.) R3B magnet  1.5 Mio€ of the construction cost of 5.5 Mio€ will be paid by the R3B collaboration. MoU between R3B institutes and CEA Saclay will be signed Contract negotiation: Rule 90%/10% has to be fulfilled partner by partner  Transfer of funds from GSI to participating institutes (regulated in Supplementary Contracts)

Total eligible costs (Total budget and EC contribution for each task)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Total eligible costs (Total budget and EC contribution for each task)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR

Short nameInstitutionMoney transfer FZJ UU CCLRL BINP IHCE U-Frankfurt JU USC LIP NPI INR CEA Forschungszentrum Jülich, Germany Uppsala University, Sweden Council for Central L., UK Budker Institute of Nuclear P., R. F.* Institute of High Current E., R. F.* Universität Frankfurt, Germany Jagellonian University, Poland Universidade de S. d. C., Spain Laboratorio de I. e. F., Portugal Nuclear Physics Institute, Czech R. University for Research, R. F.* Commisariat a´l Energie A., France FAIR EU construction (CNI) contract - GSI money transfer list

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Management FAIR CNI EC CNI Coordinator Management Office CNI Steering Committee (CNI Coordinator, FAIR Project Leader, GSI Director, Representatives of the 3 CNI Projects) CNI Project SIS18 upgrade 1 Coordinator / 6 Task Leaders / 7 Participating Institutes CNI Project R3B 1 Coordinator / 1 Task Leader / 1 Participating Institute CNI Project HADES upgrade 1 Coordinator / 3 Task Leaders / 7 Participating Institutes Governing Board (representatives of 13 Institutes/Institutions) Advisory Boards  existing PACs and TAC of FAIR project CNI Technical Group ( CNI Coordinator, 3 CNI Project Coordinators and 10 Task Leaders )

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR FAIR EU Management Team: Design Study Coordinator: Jürgen Eschke, GSI Management Office: Katharina Berghöfer, GSI Thomas Beier, GSI Consortium Agreement: Katharina Berghöfer

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR CNI Project Coordinator: 1. SIS18 upgrade: Peter Spiller (GSI) 2. HADES upgrade: Joachim Stroth (University Frankfurt) 3. R3B magnet: Jean-Eric Ducret (CEA, Saylay)

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Steering Committee Tasks of the Steering Committee The Steering Committee assists the CNI Coordinator and is responsible for the operation of the whole Project as a homogenous body.... The Steering Committee’s tasks are: a.) Review of resource status and Project progress b.) Preparation on major changes in the implementation plan including re-distribution of the budget, to be approved by the Governing Board c.) Monitoring of scientific and technical progress (improve quality of reports) Composition of the Steering Committee The Steering Committee is composed of: -The CNI Coordinator as the Chairperson -The FAIR Project Leader -The GSI Director -One representative of each of the three CNI Projects J. Eschke (Chair), H. Gutbrod, W. Henning, SIS18 (Dieter Krämer, GSI* from ), HADES (Herbert Ströbele, University Frankfurt), R3B (NN, CEA Saclay),

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR Status of legal documents - the EU contract is signed by the Coordinator GSI - the EC did not return the signed contract yet - the accession forms have been distributed to all contractors - the Consortium Agreement has been distributed to all contractors - the Supplementary Contracts have been distributed to all contractors

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR  Start of contract 1. October 2005 (duration 48 months) EC financial contribution for all contractors will be transferred to the coordinator GSI (Article 8). The pre-financing for the first 18 months of the contract will be € (~ % of 10,4 Mio €).  GSI will transfer the % of the EC contribution and % of the supplementary funds to each contractor. Prefinancing for the first 18 month

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2, 2005 J. Eschke, GSI DIRAC-PHASE-1 – EU CNI contract for FAIR