Melinda Terry, Executive Director CA Central Valley Flood Control Association 1.

Slides:



Advertisements
Similar presentations
Levee Is Not A Four Letter Word…but Levee Is Not a Four Letter Word, But… Natural.
Advertisements

Rebuilding in flood hazard areas. Impact of flood Area directly impacted spans 55,000 square kilometres Evacuations of almost 100,000 people 10,000 homes.
City of Sunset Valley Drainage Master Plan Assessment Final Recommendation Report March 24, 2009.
HUD and Disaster Mitigation ASFPM May 22, Community Development Block Grant (CDBG) Disaster Recovery In response to a Presidentially-declared disaster,
{ Levee Safety and Flood Mapping Texas Water Conservation Association Mid-Year Conference Galveston Island, Texas June 17, 2011 Dan Delich Levee Issues.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
We can’t afford to wait until disaster strikes to protect our water supply.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
California’s Central Valley Flood System Improvement Framework California Levees Roundtable March 27, 2009 California Levees Roundtable March 27, 2009.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Hydraulic Screening and Analysis Needed for USACE Review
What’s next in California's flood future? Finding answers: California Water Management Investment Strategy FEMA Region IX - CHARG Stakeholder Meeting July.
Report On SRA Fire Prevention Programs Board of Forestry and Fire Protection June 2014.
Governor’s Office of Emergency Services Disaster Mitigation Act of 2000 Changes to the Federal Hazard Mitigation Program.
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
1 Regional Report San Joaquin River Hydrologic Region.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
NRCS Watershed Rehabilitation
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
1 Hagerty Consulting Coordinated Response to Disaster A Panel Discussion for the National Community Development.
Paying for Water in California: Prop 218 Caitrin Chappelle, Associate Center Director April 28, 2015 Supported by the S. D. Bechtel, Jr. Foundation.
California’s Flood Future Recommendations for Managing the State’s Flood Risk National Association of Flood & Stormwater Management Agencies December 10,
Integrating Water Management Statewide Integrated Water Management (IWM) Gary Bardini, Deputy Director IWM Rijkswaterstaat & California Coordination Kickoff.
An update from the National Committee on Levee Safety Presented to the TWCA by Karin M. Jacoby, PE, Esq. June 17, of 14An Involved Public and Reliable.
Dam Hazard Consequences Assessment
Mitigation can include structural and nonstructural efforts.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Department of Water Resources California Levee Database (CLD) An ongoing Initiative to Collect and Catalog Data for California’s Levees and Flood Control.
Central Valley Flood Protection Board August 9, 2013 Presented by: Michael Mierzwa California Department of Water Resources DWR’s Involvement in Flood.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
COUNTY of YUBA HISTORY OF DISASTERS. Birth of the County  1851 – Marysville, Gateway to Gold, founded  1852 – Marysville becomes third largest city.
NO TIME TO WASTE STATES IN THE MISSISSIPPI RIVER’S PATH TO ITS DELTA REGION HAVE ABOUT 2 WEEKS TO AVERT FLOOD AND HEALTH CARE DISASTERS Walter Hays, Global.
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
Paying for Water: Floods CEAC Flood Control & Water Resource Policy Committee Caitrin Chappelle Supported by the S.D. Bechtel, Jr. Foundation September.
August 28, 2015 Meeting of the Central Valley Flood Protection Board Dave Wheeldon, Chief Flood System Sustainability Branch FMO, Division of Flood Management.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
DWR Maintenance Area Response to USACE Periodic Inspections Presented by: Noel Lerner, Chief, Flood Maintenance Office Mark List, Chief, Maintenance Support.
Central Valley Flood Protection Board Meeting – Agenda Item No. 6B APPLICATION NO
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Yuba County Comprehensive Flood Protection Program
California’s Flood Future Recommendations for Managing the State’s Flood Risk Terri Wegener, P.E., DWR Briefing for Central Valley Flood Protection Board.
2011 Multi-Jurisdictional Hazard Mitigation Plan Volunteer Survey Results Diane Margetts May 3,
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
Tracey Ferguson Project Manager, Integrated Water Resources ATKINS.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
1 Delta Levees Investment Strategy Delta Levees Investment Strategy Delta Plan Implementation Committee Cindy Messer, Deputy Executive Officer, Planning.
1 Verizon Florida, LLC Hurricane Season Preparation PSC Workshop – May 6, 2009.
2 American River Common Features General Re-evaluation Report Request for Board Approval of Letter Requesting Consideration of Locally Preferred Plan (LPP)
0 FEMA Region 6 Floods: The Response and the Costs Bob Bennett Response Division FEMA Region 6.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
CVFPB Executive Committee Meeting – Agenda Item No. 4C Central Valley Flood Protection Board.
SB 1024 (Perata and Torlakson) The Safe Facilities, Improved Mobility, Disaster Preparedness and Clean Air Bond Act of 2005.
Department of Water Resources Delta Levees Program Presentation for Delta Stewardship Council.
Systems mitigate risks Risks not eliminated Public Works: Prepared Annual valve testing Ongoing dam infrastructure improvement program.
June 24, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council.
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Draft Central Valley Flood Protection Plan Investment Strategy
Central Valley Flood Protection Plan Senate Bill 5 Amendments
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Local Perspective on State led Funding & Finance Planning Efforts
Presentation to Sacramento Environmental Commission May 21, 2018
Sacramento Environmental Commission January 2019.
Future Flood Event 2019 Mega Flood CA Central Valley
Presentation transcript:

Melinda Terry, Executive Director CA Central Valley Flood Control Association 1

Established in 1926 Over 70 members with flood control responsibilities Membership extends from Chico down to Tracy 2

 About every 10 years (2006, 1997, 1986, 1964, 1956, 1951, etc.)  Since 1950 flood disasters have been declared in every California county at least nine times.  Since 1983 the State’s project levees (SPFC) have breached or overtopped more than 50 times.  1986 Flood – City of Sacramento almost evacuated (Folsom Dam spilling more than designed), State sued for levee failure in Linda.  1997 Flood – All Central Valley counties declared disaster areas; levee failures flood Olivehurst, Arboga, Wilton, Manteca, and Modesto; 120,000 people evacuated; over 9,000 homes destroyed; and over $1 billion in direct flood damages  2015 El Nino – Strongest since 1997 Reducing flood risks costs less than paying for flood damage 3

Delay Can Cost State Billions  1 million people in Central Valley floodplains  $70 billion in assets at risk  $3 billion cumulative flood damages (1983, 1986, 1995, 1997)  $464 million lawsuit payout (Paterno)  $17 billion of flood risk reduction funding need identified in 2012 CVFPP  $5 billion needed to achieve 200-yr urban protection 4

PUBLIC SAFETY SPFC levee and channel bypass inspection, maintenance and enforcement CVFPP/200-yr urban flood protection projects Non-project levee and statewide flood protection FISCAL RESPONSIBILITY Eligibility for USACE & FEMA disaster funding (PL 84-99) State liability for flood damage lawsuits DISASTER RESPONSE Emergency response Levee Repairs 5

 Waning Bonds: Nearing end of Prop. 1 E/ 84 flood protection funding, only $395 million in 2014 Prop. 1.  Liability: Responsible for flood protection of 1.7 million acres covered by SPFC system (last payment for Paterno lawsuit damages from 1986 levee failure).  Prop. 218 : Can only assess for direct and proportional flood protection benefits (general benefits not allowed) and must compete with other voter-approved special assessments.  Federal Funding: Congressional funding delays (WRRDA), flood insurance increases (FEMA/NFIP), and ineligible for USACE & FEMA disaster funding. 6

CVFPP Regional Planning has identified important flood control projects and is evaluating funding options CVFPB has new encroachment enforcement program Local agencies conduct levee maintenance at lower cost Delta Subventions program has been very successful Delta Protection Commission is conducting feasibility study on opportunities for “beneficiary pays” fees Approval of State bond funding and local assessments has resulted in significant levee work since

8

Reduced state bond funding, evaporating federal funding, and local assessment challenges are practical realities. USACE recovery $$ - rescinded (over 70% SPFC facilities not eligible) Rural areas will not meet federal cost-benefit ratio Loss of FEMA recovery $$ - rescinded for Delta CVFPP – Identified $17 billion in long-term funding needs, but 2006 Prop. 1E/84 coming to end and only $395 in 2014 Prop. 1 El Nino is coming.... 9

CAUTION Failed Regional Assessments - CVFPB Overlapping Fee Competition – State fire prevention fee (SRA) Non-Flood Benefits – General benefits such as ecosystem restoration and State interests such as SWP/CVP water supply cannot be assessed by local flood control agencies under Prop

Emergency Response Levee Repairs – State share for federally eligible levees and full repair cost for ineligible SPFC and Delta levees Floodfighting - Feds will cost-share, but equipment, supplies and personnel availability are critical Debris Management – Dead trees from recent fires can create logjams for flood flow, damage bridges, and mudslides can close roads and water supply Post-Flood Costs Levee Damage – Erosion and seepage fixes Channel Clearance – Sediment and debris removal Liability – Potential damage claims for SPFC levee failures 11

PROACTIVE STRATEGY Reduce Probability – Consistent annual appropriations for routine levee and channel maintenance reduces risk of levee failures and damage liability lawsuits Protect SPFC – CVFPB has new enforcement program to prevent new or remove existing illegal encroachments that threaten levee integrity El Nino Preparedness – Act now to implement urgent, “critical” repair projects to address known weakest links:  Reinforced Levees (e.g., rock waterside, construct landside berms, fix collapsing culverts/pipes within levee)  Efficient Drainage – (e.g., sediment and vegetation removal, new pumps) 12