Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial.

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June , 2011 Breakout Session Results Issues for.
Slim hole Production Forrest Collier and Bill Hearn.
Intelligent Gas Lift Cameron Laing, LETS Limited
Innovative Energy Technology July 2014
Investigation of New Tool to Unload Liquids from Gas Wells VortexFlowllc.com Cal Whibbs Premier Production.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 19 – 22, 2012 Selection & Validation of Hydraulic Dewatering Pumps in the Natural.
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
ALRDC Seminar New and Novel Artificial Lift Technologies ConocoPhillips, Houston, Texas May 14, 2014 Type R Hydraulic Piston Pump Alex Hageman Applications.
Training in Oil & Gas Production for BP Technical Interns Section 9 – Chemical treatment system Chemical treatment systems are an important part of many.
Adaptive Product Technology for Coalbed Natural Gas (CBM)
Gas Well Deliquification Breakout Session
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Deliquification of Gas Wells using a Multi-Channel System TechCommCorp 219 Blood Rd. Chester, VT (802)
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 – 20, 2013 Wellbore Gas/Liquid Separation David A Simpson, P.E., Principal.
Breakout Session Operator Issues. Attendance 5 Operating Company reps 3 Service Company reps Multi-Vote Gas Lock/Gas Separation (6) Problems setting TAC.
Completing & Producing A Well
John Rhoads Ranette Halverson Nelson L. Passos Department of Physics Department of Computer Science Midwestern State University Computerized Analysis of.
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 – March 2, 2011 New Oil Foamer Technology to Treat Oil-loaded Wells and.
Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Project-2 Investigation of Artificial Lift Techniques in Horizontal Gas.
Under-balanced well bore cleanout and production evaluation technology.
© ChevronTexaco 2001 Use of Transient Simulators to Assess Gas Lift Viability for Offshore Angola 2002 North American Gas Lift Workshop SHAUNA NOONAN /
Sucker Rod Lift – Troubleshooting & Problem Solving Breakout
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2009 Gas Well Deliquification Breakout Session New Technologies Breakout.
SURVEILLANCE & OPTIMIZATION PROCESSES ASME/API GAS LIFT WORKSHOP ASME/API Gas Lift Workshop ExxonMobil Production Organization U. S. West Artificial Lift.
2008 Gas Well Deliquification Workshop Organizers: Artificial Lift R&D Council, Southwestern Petroleum Short Course General Chair: Rick Webb, Wilson Artificial.
Feb , Gas-Lift Workshop1 New Technology Breakout Session Discussed new use of existing technology, examples of new technology, new technology.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2015 Gas Well Deliquification Breakout Session Compression and Facilities.
Installing Plunger Lift in Gas Wells Lessons Learned from Natural Gas STAR from Natural Gas STAR Exploration & Production, Gulf Coast Environmental Affairs.
PDVSA INTEVEP Accumulation Process and Phenomena in Chamber Lift Completions Sergio Caicedo ASME/API Gas-Lift Workshop Houston, Texas, Spring 2002.
Problem Wells Break out Session Beam Pumping Workshop Houston, Texas
1 Introduction Background of study Four oil producer wells will be drilled in Berlian East field. Few procedures are designed to cover the well completion.
Feb , Gas-Lift Workshop1 Gas-Lift Diagnostics Breakout Session 20 Participants: 13-Oil Producers, 7–Consultants & Manufacturers Session.
Copyright February Shell International E & P All Rights Reserved ASME/API Gas-Lift Workshop Sheraton - North Houston Houston, TX February 6 and.
11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15 – 18, 2015 Breakout Session Summary Failure Rates and Failure.
IS BEAM PUMPING RIGHT FOR YOUR PRODUCTION Rugged, simple - easy to understand Forgiving Good diagnostics exist Possible to pump the well down to low bottom.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Robert Lestz - Chevron 28 Feb 2006 Impact of Surface Facilities on Addressing Liquid Loading Breakout Session.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 24 – 27, 2014 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
ARTIFICIAL LIFT METHODS
GLO Offshore South East Asia Steve ‘Gas Lift’ Gossell – MEA Senior Gas Lift Engineer.
By Jayant Sadare Gas-Lift Optimization and Diagnosis by using
3rd Annual Appalachian Basin Gas Well Deliquification Seminar Marietta College, Marietta, Ohio June 4 - 6, 2012 Selection of Artificial Lift Method Breakout.
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February , 2015 Gas Well Deliquification Breakout Session Troubleshooting Gas-Lift.
Introduction to Well Completions
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado March 1-2, 2016 Gas Well Deliquification Breakout Session Managing Large Scale of Shale.
Lecture 10 Production Engineering
Optimization of Liquid-Rich Shale Gas Wells using Multi-Channel Production Tubing Technology Commercialization Corp. 219 Blood Rd. Chester, VT 05143
Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 29 – March 2, 2016 Compression/Facilities Troubleshooting Breakout.
Dewatering Flowlines with Foamers C. Passucci, K.C. Hester, A. di Lullo Flow Assurance: Ensuring Production Today, Creating Solutions for Tomorrow.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
ALRDC Gas-Lift Workshop Sheraton North Hotel, Houston, Texas May 16 – 20, 2016 Gas Well Deliquification Breakout Session Gas-Lift Surveillance New Technology.
A PROPOSAL TO TRANSPORT FLUIDS FROM WELLHEAD TO FLOW STATION USING A GAS DISPLACEMENT PUMP. Juan Carlos Brown, 6th July 2017.
Gas Well Deliquification Breakout Session
Chemical additive solutions to overcome challenges and create value
Shell Exploration & Production
Breakouts - SRL Norman W. Hein, Jr, OGOS.
CHAIR - JIM BENNETT EXXONMOBIL
Gas-Lift Workshop Breakout Session
Сase #1 Well Pump Review Almaty 2018.
Information you need to optimize gas well deliquification!
Gas Well Deliquification Breakout Session
Gas Well Deliquification Breakout Session
Information you need to know to deliquify gas wells!
High Liquid Volume Plunger Lift in the Permian Basin
41st Gas-Lift Workshop Houston, Texas, USA June 3 - 7, 2019
Presentation transcript:

Gas Well De-Liquification Workshop Denver, Colorado February 27 - March 1, 2006 Problem Identification, Candidate Selection, & Selection of Artificial Lift Technique Rick Hornsby – Breakout Coordinator

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 2 Good surveillance & identification of problem wells What specific data do we need to look at (tubing size, casing size, liner size, flowing tubing pressure, etc.)? How do we determine a well’s critical liquid loading rate? What can we learn from evaluating historical production plots? What do the liquid (water, condensate) rates, or lack thereof, tell us?

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 3 Discussion Summary – Identification of Potential Candidates for Artificial Lift –Chemical composition, salinity of water? –Condensate or oil? –Reservoir temperature –Baseline – production when well was flowing OK. –Tubing pressure, casing pressure, tubing size. –Casing and tubing integrity. –Corrosion inhibition needed? –Fluid level. –Well’s IPR, Static BH Pressure, Flowing BH Pressure. – Well’s decline rate. – Decline rate vs. cum’l production. – Nodal analysis. – System analysis. – GLR. – Calculated gas velocity. – Presence of slugging. – Available facility. – Gathering lines, compression. – Compare actual performance vs. model of gas well performance.

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 4 Selection of those problem wells where artificial lift will result in an economical investment What can we learn from our lease operators about well performance? What operations techniques lead us to believe a well is a good artificial lift candidate (soap sticking, intermitting, stop-cocking, venting, swabbing, etc.)? What low cost actions can be taken to ‘prove up’ a good candidate (soap sticks, batch soap treatments, swabbing, flowing bottomhole pressure surveys, etc.)

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 5 Discussion Summary – Selection of Candidates for Artificial Lift –Obtain Operator’s feel on liquid cuts, or gas and liquid rates. –Obtain Operator’s feel on sensitivity to back pressure. –Understand Operator’s problems keeping wells on production – soaping, stop cocking, etc. –Hold well reviews. Talk to Operators. Supplement well file. –Provide field training of engineers. –Run integrity surveys – check for fill. –Use coiled tubing with N2 or CO2 cleanout. –Use stimulation to reduce water blocks in near-wellbore area. Do lab analysis first. –Can’t necessarily count on batch treatment to confirm or rule out suitability for cap tube. Be careful. –Can use a portable cap tube to reduce “testing” cost.

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 6 Selection of the most appropriate type of artificial lift What makes a good plunger lift candidate? What makes a good surfactant injection candidate? When is it necessary to consider more costly types of artificial lift (rod pumps, ESP’s, jet pumps, progressing cavity pumping, gas-lift, wellhead compression, etc.)? Do ongoing operating expenses matter and can the answer to this question determine the selection of the technique in the first place? How important are electronic flow measurement and automation (remote well control) to the success of the system?

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 7 Discussion Summary – Selection of Type of Artificial Lift For plungers: –ROT is 400 cf/bbl/1000 ft. –Not below 2 3/8 or 2 7/8 tubing size. –No holes in tubing, or insert profiles. –Not too high GLR. –Conventional vs. slim hole completion – communication with annulus. –Plunger depth vs. depth of perfs. –Up to 30 o from vertical, not have doglegs.

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 8 Discussion Summary – Selection of Type of Artificial Lift For surfactant: –High WCR. –Holes in tubing don’t rule it out. –Tubing ID doesn’t need to be unobstructed. –High deviation is OK. –Low Operator / Service Company crew availability.

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 9 Discussion Summary – Selection of Type of Artificial Lift For pumps: –Need to obtain very low FBHP. –Electricity or other power source at well site. –Amount of water that needs to be produced – beyond limit for plunger or chemical. –Gas interference is a problem. –Intervention costs may be high. –Safety issues with sour gas wells. –CAPEX. –Subterranean hydraulic driven rod lift a possibility. –Depth limits, deviation, dog legs, rod wear must be considered. –May choose PCP if have solids.

Feb Mar. 1, Gas Well De-Liquification Workshop Denver, Colorado 10 Discussion Summary – Selection of Type of Artificial Lift Automation: –Needed regardless of type of artificial lift. –High value of gas. –Pressure on operating staff. –Essential for focus on HSSE.