Flying Wire Update Feb 4, 2209. TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.

Slides:



Advertisements
Similar presentations
By: Cody Balogh POE 2A. An AC motor can consist of a varying assortment of pieces all of which can include; a positive(N) and a negative(S) magnet, copper(or.
Advertisements

How electricity is made
MIPM and MFW Update 8/6/2008. IPM P-Bar Transfer Spec.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
ECE 4411 Dynamic Braking of Induction Motors Slow down a machine by converting kinetic energy stored in the rotating mass to heat energy in the rotor and/or.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
F Tevatron Software Digital Receiver Beam Line Tuner Vic Scarpine Instrumentation Instrumentation Meeting July 13, 2005.
Unit 33 Single-Phase Motors Objectives: List the different types of split-phase motors. Discuss the operation of split-phase motors. Discuss the start.
TRISHUL Winding Solutions Pvt Ltd ROTOR COILS  It is the moving part of a rotary system.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
Diesel Fuel & Storage Tanks (Machine and Bulk Storage) Heavy Equipment Technician Agricultural Equipment Technician Second Period Diesel Fuel Injection.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Practice Problems A duck flying due east passes over Atlanta, where the magnetic field of the Earth is 5.0 x 10-5 T directed north. The duck has a positive.
3/14/2007AD/Instrumentation Department Jim Zagel 1 MFW Update 3/14/07 Latest problems RFT Looses Phase Lock –Real 53 MHz connected to the RFT at MI-10.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
Motors and Generators.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ConcepTest 19.1a Magnetic Force I 1) out of the page 2) into the page 3) downward 4) to the right 5) to the left A positive charge enters a uniform magnetic.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
AGS Run-9 Preparations, Status and Plans Dec. 16, 2008 Haixin Huang.
9/25/2006All experimenters meetingA. Jansson 1 Tevatron Ionization Profile Monitors Andreas Jansson.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
12/06/2006 MFW. 12/06/2006 P-Bar Injection 12/06/2006 MFW Latest problems stem from RFT Module loosing phase lock. Greg Vogel informs us that the “real.
CM focuses on controlling outcomes. CM controls change, making sure that its impact is assessed and that every effort is made to prevent erosion of functionality.
10/5/2005 jrz1 Not quite “All” you want to know about Flying Wires At Fermilab Jim Zagel 10/5/2005.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Prepare specifications/requirements magnetic and mechanical characteristics operation mode Development of Test facility - dedicated test facility to study.
Key ideas 21.2 Application of electromagnetic induction  Electromagnetic induction is used in microphones tape recording and playback generation of electricity.
ORBUMP Power Supply... 16x3 SCR’s Pulse Forming Network (PFN) - looks like a very slow transmission line. Flat top ~ (10 usec)*(number of cells). Reduced.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Vladimir Sirotenko, Feb FPD: Runs & hisDB Oracle Databases Goal: access information about FPD experimental setup and accelerator conditions which.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
F Monitor of Beam in the Abort Gap Randy Thurman-Keup DOE Review of Tevatron Operations at FNAL March 29-31, 2005 a.k.a. Abort Gap Integrator (AGI)
MFW and IPM Update Jim Zagel 5/14/ Vertical Broken Fork After mounting new filament we attempted to align it to parallel the central shaft and.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
F James T Volk Arpil Permanent Magnets for Linear Colliders James T Volk Fermilab.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
11/12/20151 Status of high intensity polarized electron gun project at MIT-Bates Evgeni Tsentalovich MIT.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Status and plans for the 3.9 GHz section of XFEL
T980 STATUS AND CHANGES FOR
Wire Scanner / A.Demougeot
Transfer line test: Beam stability measurements
MD2036: UFO dynamics studies and UFO fast detection
e- Cloud Machine Studies-Tune Shift Studies
16 T dipole in common coil configuration: mechanical design
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Fast losses at collimators during 16L2 dumps
IHEP Cryomodule Status
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
News on TMCI in the SPS: Injecting high intensity bunches
Friday 28 October 2011.
The limits of traditional magnets.
Electron Cooling in ELENA - observations and plans
Presentation transcript:

Flying Wire Update Feb 4, 2209

TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets

MFW MultiBatch Still many partial data captures –Out of 29 Proton injections on store had partial or flat profiles 2 transfers appeared to have no beam at all. Now seem to only affect Pass 0, Bunch 1

MFW Partials Transfer # 11 Transfer #21 Transfer #9

Multi-Proton Bunch Pattern Timing

MFW Missing Vertical Wire Clean lid being prepared for installation. –Wire mounted and stress verified. –Needs to be pumped down and flown. Second can has clean parts but we are testing the feed through before final assembly Vertical Gates Vertical Loss Monitor Horizontal Gates Showing horizontal losses but no vertical losses