Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.

Slides:



Advertisements
Similar presentations
Electric Bus Management System
Advertisements

1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Department of Electrical and Computer Engineering He Zhou Hui Zheng William Mai Xiang Guo Advisor: Professor Patrick Kelly ASLLENGE.
Remote Medical Inc. ENSC 440 Project Presentation Presented By: Marian Chang Calvin Che Lotus Yi Dong Zhang April 7 th 2005.
RP1 Project Dini Dini Emily Emily Ryan Ryan Jeff Jeff Jason Jason John John.
Claims Service-Oriented Architecture Performance Prototype Team Hooloovoo.
Using UML, Patterns, and Java Object-Oriented Software Engineering Chapter 3, Project Organization and Communication.
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
Ground Scouts P09207 Team: Stewart Wadsworth (ME) Alex Sojda (EE) Josh Watts (CS) Matt DiMicco (EE) Tae Cooke (EE) Faculty Guide: Dr. Sahin (EE) Primary.
ELECTRONIC SYSTEMS ENGINEERING TECHNOLOGY TEXAS A&M UNIVERSITY Innovating tomorrow’s products and systems today Course Overview and TAT Meeting Slides.
CEN Fourth Lecture Introduction to Software Engineering (CEN-4010) Instructor: Masoud Sadjadi Project Organization.
TEAM MEMBERS: Kyle R. Schumann Paul M. Carrington Michel E. Ramirez Sponsor: David Irek Faculty Advisors: Dr. Ana Goulart Dr. Wei Zhan Pet Protect Capstone.
PIC Evaluation/ Development Board Dec02-12 December 10, 2002 Client: ECpE Department Faculty Advisors: Dr. Rover, Dr. Weber Chad Berg, Luke Bishop, Tyson.
NATHAN BLACKETER JEFF MORRIS BRIAN WILDER The Great Plains Lions Eye Bank.
DSD Course – Project Status Presentation School of Innovation, Design and Engineering Malardalen University Dec 4 th,
Bryan Sonnier – Project ManagerJulian Coleman – Software Engineer Jonathan Tindall – Hardware EngineerTam Bui – Test Engineer TEAM MEMBERS:
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
Understanding Earned Value Analysis
Smart Digital Valve Control Simulator May April 25, 2001 Client: Client: Fisher Controls Intl. Inc. Contacts: Contacts: Patrick Ryan and Jeff Seyller.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
Tells - a facility for web-based, remote real time laboratory experiments University of Limerick Ireland.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
Software Project Management Lecture # 7. Outline Project Scheduling.
Project OSCAR Octagonal Speech-Controlled Autonomous Robot ONGO-01.
Software Engineering Management Lecture 1 The Software Process.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
May05-36: Boone Cemetery Management Software Boone Cemetery Management Software May05-36 Greg Thede, Director, Boone Parks Department Dr. Kothari Joseph.
T Project Review X-tremeIT I1 Iteration
Project Status Report Presenter Name Presentation Date.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
EARNED VALUE MANAGEMENT (EVM)
Project Scheduling 1. Why Are Projects Late? An unrealistic deadline established by someone outside the software development group Changing customer requirements.
1 These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
Senior Design SD1107 Solar Module Observation Device Students:Collin Howe, CprE Jacob Rasmuson, CprE Arthur Fiester, CprE Alex Rannow, EE Timothy Fox,
Request for Proposal (RFP)
Michael Lisoski Leblanc Meneses Jason Schaer Bryan Staton.
Project Goals Our task was to take the proof of concept and make a production ready prototype with the following parameters Use low cost microprocessor.
Preliminary Design Review Your Logo Here Team Leader: Thomas C. Null, III Team Members: Andrew Tomlinson, Matthew Gunter Faculty Advisor: Dr. Roger King.
Faculty Coach: Professor Martinez  Justin Mahar  Chris Baum  Greg Schmitz  Adam Abdelhamed.
Powerpoint Templates Page Senior Design II Mid-Semester Presentation.
Track Timer Mid-Semester Presentation Senior Design II October 4, 2011.
K-12 Teaching Application Support and Software Ongo-08 Client Dr. John Lamont Prof. Ralph Patterson Advisor Dr. Gregory Smith Team Members Sean Boyle Tony.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
Abstract Reiman Gardens is looking to provide more educational material on their website. They are seeking a web program that provides an enjoyable experience.
Aircraft Carrier Draft Measurement Ship Draft Team - Fall 2015.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Vision using Wavelets CIS 541 Team 6 Presentation 6 Megan Enns Tim Weninger Brett Wolfington CIS 541 Team 6 Presentation 6 Megan Enns Tim Weninger Brett.
Michael Kelly | Keith Johnson | Eric Wells Faculty Sponsor: Dr. William H. Allen Milestone 3.
ScheduleMed Final Presentation April 19, Team Members Advisor: Dr. Raymond Winton James Rapier -Pill Dispensing -User Interface Harpreet Singh -User.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Clients/Faculty Advisors Dr. Eric Bartlett May01-14 Team Members David Herrick Brian Kerhin Chris Kirk Ayush Sharma Incremental Learning With Neural Networks.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
T Project Review X-tremeIT I1 Iteration
Software Engineering Management
WORK BREAKDOWN STRUCTURE
Earned Value - What is it
Understanding Earned Value Analysis
Understanding Earned Value Analysis
Earned Value Management
Status Report [Project Name] [Client]
Project Prototype Demo 1 Grading Rubric
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
Understanding Earned Value Analysis
Project Progress Summary - Week 18
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Presentation transcript:

Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr. Yong-Kyu Jung A.I.R Automated Individual Remote October 4, 2006

Microcontroller 16F690 THERMISTOR LON MOD VAV Controller TV Tuner TV CH 3 Video Module Display Pillow Speaker DEMONSTRATION SPDT

Deliverable 2006 Due DateDeliverablePrimary Member Status 09/04/2006Summary of ResearchLibby John 09/27/2006PCB #1Matthew Watkins 10/01/2006LON ModuleLarry Wu 10/09/2006Communications Documentation Libby John 11/15/2006PCB #2Matthew Watkins 11/21/2006Program CodeEric Robbins 12/01/2006Technical Report & User Manual Libby John Completed In Progress Not Started Behind 11/21 Program Code 10/9 Communications Documentation 12/1 Technical Report and User Manual 9/4 Summary of Research 10/1 LON Module 11/15 PCB #2 9/27 PCB#1

Milestones 2006 Due DateMilestonesStatus 09/13/2006Primary Research Completed 09/20/2006Schematic and PCB Layout 09/27/2006Prototype Demo 10/04/2006TV Tuner Module 10/11/2006Setpoint Feedback 10/18/2006Enclosure Options 10/25//2006GUI Presentation 11/1/2006 System Demonstration 11/8/20062 nd PCB 11/15/2006PCB Populated Completed In Progress Not Started Behind

Open Actions Status What action: Fixing the video generator Who has responsibility: Matt What is status: Completed Expected Date:

Open Actions Status What action: GUI for the program Who has responsibility: Eric What is status: In Progress Expected Date:

Open Actions Status What action: Setpoint Feedback to µc Who has responsibility: Larry What is status: Behind Schedule Expected Date:

Open Actions Status What action: Power budget Who has responsibility: Libby What is status: In Progress Expected Date:

Earned Value Total Number of hours worked: __70/504_ Estimate of manpower needed: _300_ Total Baseline hours: _1000_ SPI: 1.6 CPI: 2.5 Projection: –Scope: No change –Time: On time –Cost: Above Cost

Earned Value Analysis WEEK 1 9.6, 6.4 WEEK 2 5.0, 3.3 WEEK 3 3.6, 2.4 WEEK 4 2.5, 1.6