LBT Q3 2007 Engineering Review MCSC Mount Control System.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
Advertisements

LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Dept. of Mechanical Engineering Subharti University Project overview on.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Lessons Learned from Guy Wire and Anchor Replacement at Sequoyah Nuclear Plant by Doyle Pittman 12th NUMUG Meeting
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
ELECTRIC TRACTION SYSTEM
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBT Q Engineering and Software Review ENGG Engineering General.
LBTI Program Management Review Phil Hinz S.H. (Hop) Bailey 2 December
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Underground Cost Analysis; Option 10 and 11 - TRTP Project Project Segment 8A Corridor October 21, 2012.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
Life cycle services for automation products
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
EML 2023 – Motor Control Lecture 1 – Closed Loop Motor Control.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
Abstract The goal of our project is the continued restoration of the 8.5 meter dish at the Fick observatory in Boone, IA. Before restoration began, the.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
 Approach Length  Odds and Evens  Choosing the Starting Foot  Choosing the Jumping Foot.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
SmartMotor™ Machine Applications. 7-axis semiconductor manufacturing machine that fills, caps and welds axial leads. The entire machine is controlled.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
MAINTENANCE INTERVAL SCHEDULE D6R TRACK TYPE TRACTOR 7AR EVERY 10 SERVICE HOURS OR DAILY.
13,14 July 2005 Feasibilty/Concept Study Mid Term Status Review Telescope Mount Concept Vertex RSI.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
DVAC PROGRESS OFFSET GREGORIAN DISH (DVAC-1) 郑元鹏 (Yuanpeng Zheng ) Joint Lab. for Radio Astronomy and Technology MAY 29, 2012.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Engineering Review ENGG – Engineering General.
CRTNT testing equipments introduction
Car Repairs that will Prevent an Accident
Pacific Power Seismic Preparedness Update
Replacement HW Problem
Presentation transcript:

LBT Q Engineering Review MCSC Mount Control System

26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Identified source of azimuth encoder signal nulls Identified source of azimuth encoder signal nulls Azimuth encoder declared salvageable Azimuth encoder declared salvageable Elevation motor brushes inspected and one replaced due to heat damage Elevation motor brushes inspected and one replaced due to heat damage

26-Oct-2007LBT Q Engineering Review Open Issues Technical Technical Occasional unexplained elevation tracking errors Occasional unexplained elevation tracking errors ELFR motor winding damage from Q1/07. Brush failure suspected. ELFR motor winding damage from Q1/07. Brush failure suspected. Low azimuth and elevation acceleration Low azimuth and elevation acceleration Unexplained phase discrepancy between azimuth and elevation encoder signals Unexplained phase discrepancy between azimuth and elevation encoder signals Elevation brake capacity appears to be diminished to less than 206 kN*m Elevation brake capacity appears to be diminished to less than 206 kN*m Schedule Schedule None None Financial Financial Postponed ordering spare azimuth encoder tape on financial grounds Postponed ordering spare azimuth encoder tape on financial grounds Resource Resource MCS competing for resources mainly against rotator development effort MCS competing for resources mainly against rotator development effort Azimuth encoder progress in Q4/07 is contingent on progress made on issue #772. Azimuth encoder progress in Q4/07 is contingent on progress made on issue #772.

26-Oct-2007LBT Q Engineering Review Progress (Q3/2007) Planning From Q2 Review Planning From Q2 Review Elevation and azimuth motor brush inspected and if necessary replaced √ Elevation and azimuth motor brush inspected and if necessary replaced √ Order replacement azimuth encoder tape – postponed Q1/08 Order replacement azimuth encoder tape – postponed Q1/08 Azimuth encoder tests planned for Q4/07 – on scheduled Azimuth encoder tests planned for Q4/07 – on scheduled Tape installation expected in Q4/07 – canceled Tape installation expected in Q4/07 – canceled Additional Progress Additional Progress Damaged tape salvageable Damaged tape salvageable Identified source of azimuth encoder tape signal nulls Identified source of azimuth encoder tape signal nulls

26-Oct-2007LBT Q Engineering Review Planning (Q4/2007) Install azimuth main encoder read heads Install azimuth main encoder read heads Commission azimuth encoder Commission azimuth encoder Inspect/repair elevation brakes Inspect/repair elevation brakes Order azimuth encoder tape Q1/08 Order azimuth encoder tape Q1/08