LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G060183-00-Z.

Slides:



Advertisements
Similar presentations
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
Advertisements

LIGO - G R 1 HAM SAS Test Plan at LASTI David Ottaway November 2005 LIGO-G Z.
LIGO-G D Comments: Staged implementation of Advanced LIGO Adv LIGO Systems 17 may02 dhs Nifty idea: a way to soften the shock, spread cost, allow.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
G R LIGO Advanced System Test Interferometer LIGO Advanced R&D Review M. Zucker 8 October, 2002.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
Thermal Compensation NSF David Ottaway LIGO Laboratory MIT.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G D Advanced LIGO: Detector Organization, Responsibilities, Authority and Decision Tree: SUS and COC Dennis Coyne, Carol Wilkinson, David.
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
G M 1 Advanced LIGO Update David Shoemaker LSC/Virgo MIT July 2007.
Update on Advanced LIGO suspension design and technology development towards the quad noise prototype Caroline A. Cantley for Advanced LIGO Suspension.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
Advanced LIGO Suspension Status Caroline A. Cantley Advanced LIGO Suspension Team / University of Glasgow for the GEO600 Group LSC Meeting, LLO March 2004.
LIGO-G R The LIGO Advanced System Test Interferometer Mike Zucker, David Shoemaker, Ken Mason LLO LSC 16 March 2001.
19 Aug 2003, LSC Hannover G Z1 State of the LSC Peter Saulson Syracuse University.
G M 1 HAM-SAS CCB information 22 Feb 06 Coyne, Shoemaker, Wilkinson.
LIGO-G D ETM STRUCTURAL DESIGN SUMMARY FEA OF PROPOSED ETM STRUCTURE ANSYS Workbench (ANSYS University Advanced) version 9.0 LIGO-G Z.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
G Z LIGO R&D1 Input Optics Definition, Function The input optics (IO) conditions light from the pre- stabilized laser (PSL) for injection into.
G M MIT LIGO David Shoemaker LIGO PAC 27 June 02.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
G R 1 Advanced LIGO Update David Shoemaker LSC LHO March 2006.
Advanced LIGO UK G K 1 Some recent work on blade performance Caroline Cantley, Justin Greenhalgh, Mike Plissi, Norna Robertson, Calum Torrie,
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
Update on Suspension Activities for Advanced LIGO Caroline A. Cantley University of Glasgow for the GEO600 Group LSC Meeting, Livingston, March 2003 (Technical.
Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
LIGO-G M Overview of LIGO R&D and Planning for Advanced LIGO Detectors Gary Sanders NSF R&D Review Caltech, January 29, 2001.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
G R Interferometer Sensing & Control P Fritschel 8 Oct 02.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
G R Advanced LIGO1 David Shoemaker LLO LSC 19 Aug 2002.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
G R 2004 Plan Update LIGO Systems meeting 22 Jan 04 dhs.
LIGO LAB R&D PROGRAM TECHNICAL REVIEW, OCT 02
LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI)
Thermal Compensation NSF
LV Meeting – 22 September 2009 Brett Shapiro G v1
Prospects and plans : LIGO interferometers Michael Landry LIGO Hanford Observatory LSC meeting, MIT Nov 4-5, 2006.
BSC HEPI Pier Amplification
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
Lasti Update July 25, 2007 LIGO-G Z
Status of LIGO Installation and Commissioning
LIGO Advanced System Test Interferometer
P Fritschel LSC Meeting LLO, 22 March 2005
HAM SAS Test Plan at LASTI
Presentation transcript:

LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z

LSC Meeting March ‘05 2 Talk Overview 1. Review of LASTI goals 2. Progress since March Proposed Experiments for the next year 4. Conclusions

LSC Meeting March ‘05 3 LASTI Mission Test LIGO components & systems at full mechanical scale Practice installation & commissioning Minimize delays & downtime for advanced LIGO upgrades Qualify design modifications & retrofits for initial LIGO Specific Advanced LIGO Program Tasks (‘05 - ‘09+): Qualify advanced isolation & suspension systems and associated controls at full scale Develop detailed SEI/SUS installation & commissioning handbook Look for unforeseen interactions & excess displacement noise Test PSL and Input Mode Cleaner together at full power

LSC Meeting March ‘05 4 LASTI People Resident MIT Staff Students - Laurent Ruet (PhD student at INSA), Thomas Corbitt, Brett Shapiro Engineering - Myron MacInnis, Ken Mason Scientists - Gregg Harry, Rich Mittleman, Dave Ottaway, David Shoemaker, Pradeep Sarin, Mike Zucker (Advice), Fabrice Matichard (Visiting Postdoc from INSA) Computers – Keith Bayer Laboratory and LSC Visitors (Recent and Immediate Future) PSL Upgrades – David Hosken, Rupal Amin, Joe Giamme Laboratory and LSC Visitors (cont.) Advanced SEI - Joe Giaime, Brian Lantz, Brian O’Reilly, Riccardo Desalvo Advanced SUS - Norna Robertson, Calum Torrie, Janeen Romie, Phil Willems, Justin Greenhalgh, Ken Strain, Caroline Cantley, Mark Barton… CDS/DAQ - Jay Heefner, Rich Abbott, Rolf Bork and Mohanna

LSC Meeting March ‘05 5 Since the Last Review Infrastructure (MacInnes, Mason) »Test stand with new cleanroom installed »Granite Table Installed Double Triple Experiment Started (Ruet, MacInnes, Mittlemann, Ottaway and the SUS Group) Radiation Pressure Investigations (Corbitt, Ottaway, Mavalvala, Innerhoffer) PSL Power Scaling Experiments Started (Hosken, Ottaway, Giaime, Amin) Controls Prototype Installed (MacInnes, Mason Mittlemann, Shapiro, SUS Group) Advanced LIGO Seismic Assembly Started (Mason, MacInnes, SEI Group) Ongoing Seismic Characterization and novel control (Mittlemann, Shapiro and Ruet)

LSC Meeting March ‘05 6 Quad Suspensions Controls Prototype Quad Controls Prototype Solid Spacer Quad Controls Prototype Mounted on Test Stand Initial Characterization Underway TS much stiffer than Caltech Platform Currently working on local damping Installation in BSC Chamber by April 2nd

LSC Meeting March ‘05 7 LASTI Infrastructure New Cleanroom installed for Quad and Seismic Isolation system assembly Test Stand Installed and very well leveled to Seismic requirements Plagued by temperature control problems in high bay »Causing problems with Controls Quad and PSL systems CDS infrastructure being developed »New racks hardwired into the facility »Plans for PCI based control being developed (Jay, Rolf, Rich A and Mohanna) Granite table installed for Seismic Assembly

LSC Meeting March ‘05 8 BSC Seismic Isolation System All parts have been ordered Significant number of parts are starting to arrive Initial Installation on granite slab Significant driver for the speedy installation of the Quad into the LASTI Vacuum System (Need test stand for combined assembly)

LSC Meeting March ‘05 9 Double Triple Experiment Aims: »Test sensor noise immunity of predictive modal methods »Test viability of fiber coupled PSL source Status »Fiber installed »Pier top table installed »Second triple installed »Cavity between test masses locked Result »Noise hunt underway

LSC Meeting March ‘05 10 Radiation Pressure Experiments Cold Damping Regime Unstable Regime Utilized existing LASTI test cavity in Mid Y HAM Demonstrated Parametric Instability and the Unstable nature of the Optical Spring Experiments performed by members of the MIT Quantum Measurement group using LASTI Infrastructure New experiment using 1 g mirror installed

LSC Meeting March ‘05 11 Seismic Characterization and Control Identified the cause of noise amplification at the top of pier Identified an adaptive feedforward approach to reduce the noise impact Work done by Rich M, Laurent and Brett S See talk by Rich M

LSC Meeting March ‘05 12 PSL Power Upgrade Test Aim: Investigate the feasibility of increasing the power of Lightwave 10 Watt PSL Using commercially available optical amplifiers Status »Predictive code upgrade by David Hosken »Parts have been ordered, (Funded by Joe Giaime and LSU) »Rupal Amin to visit MIT »Assembly beginning early March

LSC Meeting March ‘05 13 HAM SAS Will be installed in the Yend HAM – Late Summer 2006 Currently does not have a HEPI unit on this HAM Will use excess scissor tables from LLO Will need another cleanroom in LASTI Important to minimize required vent time to not impact rest of LASTI Schedule

LSC Meeting March ‘05 14 LASTI Schedule for Advanced LIGO SUS/SEI Controls Prototype Jan ’05 Design and fabricate Solid Spacer for BSC Jun ’05, Feb ‘06Assembled Quad arrives and external shakedown begins Jul ’05, Apr’ 06 Cartridge installed into vacuum Apr’ 06, Sept ’06 Stand alone testing Oct ’05, Oct ’06 Preliminary locking tests begin ??? Jan ’06, Sept ’06 Removed from vacuum BSC Seismic Development Mar – Aug ’05, Feb’06 Procure parts Oct ’05, Apr ’06Dirty assembly Nov ’05, May ‘06Modal testing Nov ’05 June ‘06Dissemble Dec ’05 Aug ’06Clean parts Jan ’06 Aug ’06Clean assembly Mar ’06 Sept ‘06Pre- installation test May ’06 Oct’ 06Vacuum installation Jun ’06 Dec’06Removal from vacuum Feb ’06, Feb ’07 Combine Quad and BSC Extra-Vacuum Jul ’06, Mar ’07 Cartridge Install Schedule Code From Mar ’05 Current Estimate Done OhOh Other Key Dates: April ’06 Double Triple Experiments Conclude Aug ’06 HAM SAS Installation Begin May ’06 PSL Power Scaling Conclude

LSC Meeting March ‘05 15 Conclusions Many projects are successfully being worked in parallel Significant progress has been made The next six months to year promises a wide array of results for a variety of Enhanced LIGO and Advanced LIGO sub-systems.

LSC Meeting March ‘05 16 LASTI Detailed Optical Layout Yend HAM – Currently Empty, Oct ’06 HAM SAS Y Mid HAM – Currently used by Quantum Optics, Oct ’06 Quantum Optics Experiments BSC – Currently Empty (Bare Seismic Tests), Oct ’06 Controls Prototype Standalone Tests Xend HAM – Currently Double Triple Experiment, Oct ’06 Single triple for Quad/Triple cavity experiments