RWA, GSI 11/07 Beam Loss and Collimation at the LHC R. Assmann, CERN/AB 15/11/2007 for the Collimation Team GSI Beschleunigerpalaver.

Slides:



Advertisements
Similar presentations
1 House, Apr 25, 2004 Accelerator Physics from the Tevatron to the LHC Steve Peggs, BNL - How to increase the luminosity - Beam-Beam.
Advertisements

1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
Critical beam losses during Commissioning & Initial Operation Guillaume Robert-Demolaize (CERN and Univ. Joseph Fourier, Grenoble) with R. Assmann, S.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
RWA, EPAC06 The LHC Collimation System R. Assmann, CERN/AB for the LHC Collimation Team EPAC 2006 Edinburgh.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
RWA LTC Preliminary results from SPS collimator MDs LTC R. Assmann for the collimation team.
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Concept of a Collimation System with Enhanced Operational Stability and Performance.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
ESGARD – OMIA 10 & 11/09/2007 JRA on Collimators and Materials for High Power Accelerators Motivation Work Packages Partners & resources R. Assmann.
Partikeldagarna, Göteborg 21 September 2007 LHC: Status and Plans Lyn Evans.
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Peter Spiller, COLMAT-Kick off meeting, Cryo-Collimator, CERN, COLMAT Kick-off meeting CERN Peter Spiller Cryo-Collimator (Catcher) for.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Beam Loss and Collimation at the LHC
LHC collimation R. Bruce on behalf of the CERN LHC collimation team R. Bruce,
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
Frontier High Energy Accelerators Hermann Schmickler -CERN Tuesday, 27 th September 2011 JOINT ISTC-CERN-JINR SUMMER SCHOOL ON HIGH ENERGY PHYSICS AND.
TEVATRON COLLIDER COLLIMATORS AND ABSORBERS Fermilab Materials for Collimators and Absorbers Nikolai Mokhov, Fermilab Workshop on Materials for Collimators.
Beam absorbers for Machine Protection at LHC and SPS
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Summary Session Advanced Collimation CARE-HHH-APD BEAM'07 R. Assmann.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
Halo Collimation of Protons and Heavy Ions in SIS-100.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
News and Introduction from CERN June 15th, 2005
BEAM LOSS MONITORING SYSTEM
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Status of the beta-beam study
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Plan for Collimator Commissioning
Progress in Collimation study
Lecture 2 Live Feed – CERN Control Centre
BEAM LOSS MONITORING SYSTEM
Beam collimation for SPPC
Intensity Evolution Estimate for LHC
CERN, Geneva, Switzerland PAC 2003 – Portland, Oregon, USA
Collimation for beta-beams
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
LHC Collimation Requirements
The LHC Collimation Project Implementation of a Phased Approach
Optic design and performance evaluation for SPPC collimation systems
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
Beam halo and beam losses in IR1 and IR5
Why do BLMs need to know the Quench Levels?
Introduction and Requirements
Collimators: Operations - Baseline Assumptions
RC1 Prototype Conceptual Design Review 15 December, 2005
Review of Quench Limits
Operational Results of LHC Collimator Alignment using Machine Learning
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

RWA, GSI 11/07 Beam Loss and Collimation at the LHC R. Assmann, CERN/AB 15/11/2007 for the Collimation Team GSI Beschleunigerpalaver

RWA, GSI 11/07 2 What is the LHC Beam? Protons/ions stored in circular accelerator. Particles travel with light velocity in a 27 km long vacuum tube. Revolution frequency is 11 kHz. Ideally fully stable without any losses. Two beams with opposite travel directions and well defined collision points. 25 ns 7.6 cm 0.2 mm Top view p

RWA, GSI 11/07 3 1) Introduction: The LHC Challenge The Large Hadron Collider: Circular particle physics collider with 27 km circumference. Two colliding 7 TeV beams with each 3 × protons. Super-conducting magnets for bending and focusing. Start of beam commissioning: May Particle physics reach defined from: 1) Center of mass energy 14 TeV  super-conducting dipoles 2) Luminosity cm -2 s -1 Number of bunches:2808 Bunch population:1.15e11 Bunch spacing:25 ns Top energy: Proton energy:7 TeV Transv. beam size:~ 0.2 mm Bunch length:8.4 cm Stored beam energy:360 MJ Injection: Proton energy:450 GeV Transv. Beam size:~ 1 mm Bunch length:18.6 cm LHC nominal parameters

RWA, GSI 11/07 4 The LHC SC Magnets

RWA, GSI 11/07 5 Luminosity can be expressed as a function of transverse energy density  e in the beams at the collimators: Various parameters fixed by design, for example: –Tunnel fixes revolution frequency. –Beam-beam limit fixes maximum bunch intensity. –Machine layout and magnets fix possible demagnification. –Physics goal fixes beam energy. Luminosity is increased via transverse energy density! LHC Luminosity d = demagnification (  coll /  * ) N p = protons per bunch f rev = revolution freq. E b = beam energy

pp, ep, and ppbar collider history The “new Livingston plot“ of proton colliders: Advancing in unknown territory! lot of beamlot of garbage A lot of beam comes with a lot of garbage (up to 1 MW halo loss, tails, backgrd,...)  Collimation. Machine Protection. SC magnets Collimation Machine Pro- tection ~ 80 kg TNT Higgs + SUSY + ???

RWA, GSI 11/07 7 Proton Losses LHC: Ideally no power lost (protons stored with infinite lifetime). Collimators are the LHC defense against unavoidable losses: –Irregular fast losses and failures: Passive protection. –Slow losses: Cleaning and absorption of losses in super-conducting environment. –Radiation: Managed by collimators. –Particle physics background: Minimized. Specified 7 TeV peak beam losses (maximum allowed loss): –Slow:0.1% of beam per s for 10 s0.5 MW –Transient:5 × of beam in ~10 turns (~1 ms)20 MW –Accidental:up to 1 MJ in 200 ns into 0.2 mm 2 5 TW

RWA, GSI 11/07 8 The LHC Collimators… Collimators must intercept any losses of protons such that the rest of the machine is protected („the sunglasses of the LHC“): > 99.9% efficiency! To this purpose collimators insert diluting and absorbing materials into the vacuum pipe. Material is movable and can be placed as close as 0.25 mm to the circulating beam! Nominal distance at 7 TeV: ≥ 1 mm. Presently building/installing phase 1! Top view

RWA, GSI 11/07 9 Preventing Quenches Shock beam impact: 2 MJ/mm 2 in 200 ns (0.5 kg TNT) Maximum beam loss at 7 TeV: 1% of beam over 10 s W W Quench limit of SC LHC magnet: 8.5 W/m

RWA, GSI 11/07 10 Machine Protection There are a number of LHC failure scenarios which lead to beam loss. No discussion of machine protection details here. However, comments on collimator role in machine protection. R. Schmidt is Project Leader for MP. Slow failures: –First losses after >10-50 turns appear at collimators as closest aperture restrictions. –Beam loss monitors detect abnormally high losses and dump the beam within 1-2 turns. Fast failures (dump and injection kicker related): –Sensitive equipment must be passively protected by collimators. In all cases, the exposed collimators must survive the beam impact: up to 2 MJ in 200 ns (0.5 kg TNT)

RWA, GSI 11/ ) LHC Collimation Basics Secondary halo p p e  Primary collimator Core Unavoidable losses Shower Beam propagation Impact parameter ≤ 1  m Primary halo (p) e  Shower p Tertiary halo Secondary collimator Absorber CFC W/Cu Absorber Super- conducting magnets SC magnets and particle physics exp. Particle Beam axis Impact parameter Collimator Multi-Stage Cleaning

RWA, GSI 11/07 12 System Design Momentum Collimation Betatron Collimation C. Bracco “Phase 1” “Final” system: Layount is 100% frozen!

RWA, GSI 11/07 13 A Virtual Visit to IR7

RWA, GSI 11/07 14 Collimator settings:   (primary)   (secondary)  ~ 1 mm (injection)  ~ 0.2 mm (top) Small gaps lead to: 1.Surface flatness tolerance (40  m). 2.Impedance increase. 3.Mechanical precision demands (10  m). LHC Collimator Gaps

RWA, GSI 11/07 15 Allowed intensity Quench threshold (7.6 × TeV) Dilution length (~10 m) Cleaning inefficiency = Number of escaping p (>10  ) Number of impacting p (6  ) Beam lifetime (e.g. 0.2 h minimum) limit the intensity luminosity Collimation performance can limit the intensity and therefore LHC luminosity. Illustration of LHC dipole in tunnel Required Efficiency

RWA, GSI 11/ % per m efficiency Intensity Versus Cleaning Efficiency For a 0.2 h minimum beam lifetime during the cycle.

RWA, GSI 11/07 17 The LHC Phase 1 Collimation Low Z materials closest to the beam: –Survival of materials with direct beam impact –Improved cleaning efficiency –High transparency: 95% of energy leaves jaw Distributing losses over ~250 m long dedicated cleaning insertions: –Average load ≤ 2.5 kW per m for a 500 kW loss. –No risk of quenches in normal-conducting magnets. –Hot spots protected by passive absorbers outside of vacuum. Capturing residual energy flux by high Z absorbers: –Preventing losses into super-conducting region after collimator insertions. –Protecting expensive magnets against damage. No shielding of collimators: –As a result radiation spread more equally in tunnel. –Lower peak doses. –Fast and remote handling possible for low weight collimators.

RWA, GSI 11/ ) Collimator Hardware

RWA, GSI 11/07 19 Hardware: Water Cooled Jaw  Up to 500 kW impacting on a jaw (7 kW absorbed in jaw)… Advanced material: Fiber-reinforced graphite (CFC)

RWA, GSI 11/07 20 The LHC “TCSG” Collimator 360 MJ proton beam 1.2 m 3 mm beam passage with RF contacts for guiding image currents Designed for maximum robustness: Advanced CC jaws with water cooling! Mostly with different jaw materials. Some very different with 2 beams! Other types: Mostly with different jaw materials. Some very different with 2 beams! Research topic: Advanced mechanical engineering

RWA, GSI 11/ GeV p 2 MJ 0.7 x 1.2 mm 2 ~ Tevatron beam ~ ½ kg TNT Microphone C-C jaw C jaw TED Dump Fiber-reinforced graphite (CFC) Graphite Robustness Test with Beam Research topic: Advanced materials and extreme shock waves

RWA, GSI 11/07 22 Operational Control

RWA, GSI 11/07 23 Side view at one end Motor Temperature sensors Gap opening (LVDT) Gap position (LVDT) Resolver Resolver Reference Microphone Vacuum tank + switches for IN, OUT, ANTI-COLLISION Using Sensors to Monitor LHC Jaw Positions CFC Sliding table Movement for spare surface mechanism (1 motor, 2 switches, 1 LVDT) Research topic: Precision remote control and survey

RWA, GSI 11/07 24 Collimator Controls Successful test of LHC collimator control architecture with SPS beam (low, middle, top level) S. Redaelli et al Collimator Beam-Based Alignment

RWA, GSI 11/07 25 Position Measurement and Reproducibility Measured during test in TT40 (Oct. 31 st ) in remote!!!! 20 µm ~ 25 µm mechanical play R. Losito et al

RWA, GSI 11/07 26 Compatibility with LHC UHV J-P. BOJON, J.M. JIMENEZ, D. LE NGOC, B. VERSOLATTO Graphite-based jaws are compatible Conclusion: Graphite-based jaws are compatible with the LHC vacuum. material and heat treatment under vacuum, an in-situ bake-out and a proper shape design The outgassing rates of the C jaws will be optimized by material and heat treatment under vacuum, an in-situ bake-out and a proper shape design. graphite dust No indication that graphite dust may be a problem for the LHC. Research topic: Energy absorption in Ultra High Vacuum

RWA, GSI 11/07 27 Other collimator features In-situ spare concept by moving the whole tank (move to fresh surface if we scratch the surface with beam) Direct measurements of jaw positions and absolute gap (we always know where the jaws are) Precision referencing system during production Measurements of jaw temperature Radiation impact optimization: Electrical and water quick plug-ins, quick release flanges, ceramic insulation of cables,... RF contacts to avoid trapped modes or additional impedance C. Rathjen, AT/VAC

RWA, GSI 11/07 28 Collimator Deliveries Industry:87% of production for 7 TeV initial ring installation has been completed (66/76). All collimators for first run should be at CERN by end of the year. Total production should be completed in April. Initial 7 TeV installation Production deadline for initial installation

RWA, GSI 11/07 29 Collimator Tank (water cooled) Water Connections Vacuum pumping Modules BLM Beam 2 Quick connection flanges 4) Tunnel Installations (vertical and skew shown) A. Bertarelli

RWA, GSI 11/07 30 Tunnel Preparations IR7 Series of collimator plug-in supports Cable routing from top (radiation) Waterconnection Cable trays Pumping domes

RWA, GSI 11/07 31 Collimator Installation Quick plug-in support (10 min installation)

RWA, GSI 11/07 32 Installed Collimator on Plug-In Base support Collimator Lower plug-in Upper plug-in

RWA, GSI 11/07 33 Remote Train Research topic: Remote handling in radioactive environment

RWA, GSI 11/07 34 Remote Survey

RWA, GSI 11/ ) Collimation Performance Simulations:5 million halo protons 200 turns realistic interactions in all collimator-like objects LHC aperture model  Multi-turn loss predictions

RWA, GSI 11/07 36 Efficiency in Capturing Losses Beam1, 7 TeV Betatron cleaning Ideal performance Beam2, 7 TeV Betatron cleaning Ideal performance TCDQ Quench limit (nominal I,  =0.2h) Local inefficiency: Local inefficiency: #p lost in 1 m over total #p lost = leakage rate Quench limit (nominal I,  =0.2h) Local inefficiency [1/m] Efficiency % per m Efficiency % per m % needed % predicted Research topic: Halo and collimation modeling

RWA, GSI 11/ seconds Observation of BLM signal tails:Up to seconds in length BLM teamBeam related true signal BLM team:Many measurements  Beam related true signal! Problem: Beam loss tails? Research topic: Halo beam dynamics and diffusion theory

RWA, GSI 11/07 38 Collimation for Ions additional BLM’s for ions  Loss predictions used for allocation of additional BLM’s for ions! G. Bellodi et al Power load [W/m] Different physics! Two-stage  cleaning not working! Limitation to ~50% of nominal ion intensity. Research topic: Ion collimation and ion losses

RWA, GSI 11/07 39 Energy Deposition (FLUKA) K. Tsoulou et al FLUKA team Research topic: Energy deposition

RWA, GSI 11/07 40 CERN Mechanical Simulations Displacement analysis – Nominal conditions (100 kW) – Load Case 2 10s Transient (500 kW) – Loss rate 4x10 11 p/s (Beam Lifetime 12min) Initial loss 8e10p/s Max. deflect. ~20  m Transient loss 4e11p/s during 10s Max deflect  m Back to 8e10p/s situation! A. Bertarelli & A. Dallochio Research topic: Advanced thermo mechanical modeling

RWA, GSI 11/07 41 Local Activation Losses at collimators generate local heating and activation. Local heating: On average 2.5 kW/m. Activation: Up to 20 mSv/h on contact (better not touch it). Fast handling implemented. Remote handling being developed. Residual dose rates One week of cooling S. Roesler et al Research topic: Radiation impact

RWA, GSI 11/07 42 Kurchatov Collaboration Studies of CFC Material Used in LHC Collimators  Working on understanding radiation damage to LHC collimators from impacting protons of 7 TeV per year. Also with BNL/LARP… … in addition shock wave models… A. Ryazanov Research topic: Radiation damage in accelerator materials

RWA, GSI 11/07 43 Impedance Problem impedance in Feb 03 Third look at impedance in Feb 03 revealed a problem: F. Ruggiero Several reviews of LHC collimator-induced impedance (originally not thought to be a problem). Surprise in 2003: LHC impedance driven by collimators, even metallic collimators. LHC will have an impedance that depends on the collimator settings! Strong effort to understand implications… Research topic: Impedance

RWA, GSI 11/07 44 First Impedance Estimates 2003 F. Ruggiero, L. Vos LHC impedance without collimators Typical collimator half gap Transverse Impedance [MΩ/m] Half Gap [mm]

RWA, GSI 11/07 45 Impedance and Chromaticity E. Metral et al

RWA, GSI 11/ Collimator Impedance Measurement Improved controls in 2006: Possibility of automatic scan in collimator position. Much more accurate and complete data set in 2006 than in 2004! R. Steinhagen et al E. Metral et al

RWA, GSI 11/07 47 Summary: The Staged LHC Path Energy density at collimators (nominal 7 TeV) Stored energy in beams Number of collimators State-of-the-art in SC colliders (TEVATRON, HERA, …) 1 MJ/mm 2 2 MJ Phase 1 LHC Collimation 400 MJ/mm MJ * 88 Nominal LHC 1 GJ/mm MJ122 Ultimate & upgrade scenarios ~4 GJ/mm 2 ~1.5 GJ≤ 138 Limit (avoid damage/quench) ~50 kJ/mm 2 ~10-30 mJ/cm 3 * Limited by cleaning efficiency (primary) and impedance (secondary)

RWA, GSI 11/ ) Beyond Phase 1 The LHC phase 1 system is the best system we could get within the available 4-5 years. Phase 1 is quite advanced and powerful already and should allow to go a factor 100 beyond HERA and TEVATRON. Phase 2 R&D for advanced secondary collimators starts early to address expected collimation limitations of phase 1. Phase 2 collimation project was approved and funded (CERN white paper). Starts Jan Should aim at complementary design compared to SLAC. Collaborations within Europe through FP7 and with US through LARP are crucial components in our plans and address several possible problems. We also revisit other collimation solutions, like cryogenic collimators, crystals, magnetic collimators, non-linear schemes.

RWA, GSI 11/07 49 LHC Phase 2 Cleaning & Protection p p Core Unavoidable losses Beam propagation Impact parameter ≤ 1  m Primary halo (p) e  Shower p Secondary halo e  Shower Tertiary halo Absorber Primary collimator CFC W/Cu Absorber Super- conducting magnets SC magnets and particle physics exp. Particle Beam axis Impact parameter Collimator Hybrid Colli- mator TCSM Phase 2 material Phase 1 Colli- mator TCSG CFC Phase 1 Colli- mator TCSG CFC  Low electrical resistivity, good absorption, flatness, cooling, radiation, … Primary collimator CFC & Crystal 1.Phase 2 materials for system improvement. 2.Crystals AP under study (surface effects, dilution, absorption of extracted halo).

RWA, GSI 11/07 50  September workshop provided important input and support…

RWA, GSI 11/07 51 Draft Work Packages White Paper (WP), Europe (FP7), US (LARP) WP1Management and communication WP1 (FP7)– Management and communication WP2Collimation modeling and studies WP2 (WP, FP7, LARP)– Collimation modeling and studies WP3Material & high power target modeling and tests WP3 (WP, FP7, LARP)– Material & high power target modeling and tests WP4Collimator prototyping & testing for warm regions WP4 (WP, FP7, LARP)– Collimator prototyping & testing for warm regions Task 1 Task 1 – Scrapers/primary collimators with crystal feature Task 2 Task 2 – Phase 2 secondary collimators WP5Collimator prototyping & testing for cryogenic regions WP5 (FP7)– Collimator prototyping & testing for cryogenic regions WP6Crystal implementation & engineering WP6 (FP7)– Crystal implementation & engineering

RWA, GSI 11/07 52 First prototype with helical cooling circuit (SLAC workshop) Design with 2 rotatable Cu jaws Strong SLAC commitment and effort: Theoretical studies, mechanical design, prototyping. New full time mechanical engineer hired. Looking for SLAC post-doc on LHC collimation! SLAC Collimator Design and Prototyping: Rotatable LHC Collimator for Upgrade

RWA, GSI 11/07 53 Working Together to Develop Solutions… Many if not most new accelerators are loss-limited in one way or another!Many if not most new accelerators are loss-limited in one way or another! core requirement for successCollimation has become a core requirement for success. The LHC upgrade program is or will be just one example. full collaborative approachCollimation is so challenging in modern accelerators that it warrants a full collaborative approach to extend the present technological limits. 17 partnersCollaborations exist or are under discussion with presently 17 partners: Alicante University, Austrian Research Center, BNL, EPFL, FNAL, GSI, IHEP, INFN, JINR Dubna, John Adams Institute, Kurchatov Institute, Milano University, Plansee company, Protvino, PSI, SLAC, Turin Polytechnic strong support from the international communityThe importance and intellectual challenge is reflected by the strong support from the international community. Operational and design challengesOperational and design challenges impose fascinating technological and physics R&D.

RWA, GSI 11/ ) Conclusion LHC advances the accelerator field into a new regime of high power beams with unprecedented stored energy (and destructive potential). The understanding of beam halo and collimation of losses at the level will be crucial for its success (high luminosity)! LHC collimation will be a challenge and a learning experience! Collimation is a surprisingly wide field: Accelerator physics, nuclear physics, material science, precision engineering, production technology, radiation physics. A staged collimation approach is being implemented for the LHC, relying on the available expertise in-house and in other labs. The collaboration and exchange with other labs is very important to design and build the best possible system (achieve our design goals)! Bid for support from European Community (FP7). We hope to have GSI as major partner in the domain of understanding and controlling beam losses.

RWA, GSI 11/07 55 The Collimation Team… Collimation team: About 60 CERN technicians, engineers and physicists… in various groups and departments. + many friends in connected areas (BLM’s, MP, …) + collaborators in various laboratories (SLAC, FNAL, BNL, Kurchatov, …)