Silicon Strips for PHENIX SVTX Status and Plans for Silicon Strips in PHENIX SVTX Abhay Deshpande Recent development: Possibility of the second Si Pixel.

Slides:



Advertisements
Similar presentations
Charged Particle Tracker for a RHIC/EIC joint detector Detector layouts based on EIC and NLC Physics drivers Silicon detector technologies Simulations.
Advertisements

PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
The SVT in STAR The final device…. … and all its connections … and all its connections.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Silicon Stripixel Detector Junji Tojo RIKEN Vertex2005 Lake Chuzenji, Nikko, Japan November 7-11, 2005.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
RC chip Junji Tojo RIKEN VTX Meeting February 9 th, 2005.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Temperature dependence of sensor leakage current Contents Introduction Measurement Result Summary Junkichi Asai (RIKEN BNL Research Center) (Hiroki kanoh.
1. LANL-led silicon detector project (FVTX) installed into RHIC this FY, 4.5 cm from beam pipe Increased leakage current in detectors implies somewhat.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Silicon Vertex Tracker (VTX) for PHENIX Experiment at RHIC Y. Akiba (RIKEN) for PHENIX collaboration Detector Advisory Committee Meeting November 22, 2003.
1 R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
Summary of Si Strip Group QA Preparation & Schedule and Costs Abhay Deshpande Stony Brook University PHENIX VTX Detector Readiness Review Brookhaven National.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
News on microstrip detector R&D —Quality assurance tests— Anton Lymanets, Johann Heuser 12 th CBM collaboration meeting Dubna, October
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
18 March 2009 Thomas Bergauer Prototype batch of DSSD from commercial vendors & Proposal for SVD Layout HEPHY Vienna.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Spin Physics with the PHENIX Silicon Vertex Tracker Junji Tojo RIKEN for the PHENIX Collaboration Advanced Studies Institutes - Symmetries and Spin July.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
PHENIX Vertex Detector with Conventional Strip Sensors Abhay Deshpande Stony Brook University.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Silicon strip tests Silicon upgrade workshop in Nashville June 9, 2003 Yuji Goto (RIKEN/RBRC)
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
Status of Stripixel Sensor + SVX4 Test Junji Tojo RIKEN VTX Meeting June 1 st, 2004.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Development of Novel Si Stripixel Detectors for For Nuclear and High Energy Physics Experiments* Z. Li and the Si Detector Development and Processing group:
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
SPHENIX Mid-rapidity extensions: Additional Tracking system and pre-shower Y. Akiba (RIKEN/RBRC) sPHENIX workfest July 29,
SPHENIX Silicon Tracker 2015/10/20 Japan Korea PHENIX collaboration meeting Y. Akiba (RIKEN)
SPHENIX Silicon Tracker 2015/07/10 Radiation Lab meeting Y. Akiba (RIKEN)
RIKEN/CERN pixel electronics/bus R&D plans Johann M. Heuser RIKEN - Radiation Laboratory PHENIX Silicon Upgrades Meeting 10 April 2003.
Straw man layout for ATLAS ID for SLHC
Si Sensors for Additional Tracker
CERN R&D plans and Infrastructures
Requirements and Specifications for Si Pixels Sensors
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
SuperB SVT Silicon Sensor Requirements
EENP2 Silicon Detectors.
Silicon tracker and sensor R&D for sPHENIX
Sidet Facilities A snap shot of space and equipment at Sidet and their current use Projected future uses and upgrades Hogan Nguyen, Fermilab May 22nd 2007.
Presentation transcript:

Silicon Strips for PHENIX SVTX Status and Plans for Silicon Strips in PHENIX SVTX Abhay Deshpande Recent development: Possibility of the second Si Pixel Layer has changed somewhat the role Si Strips will play in the Si VTX detector for PHENIX. The full impact of this on the final design specifications of the SVTX is now beginning to be studied; the detailed layout for Si Strip needs to be modified to include different possibilities and options made available by the second pixel layer. Si Strip Group will present its present activities and hopefully we will have extensive discussion on this future near and long term goals towards the end of this meeting.

Silicon Strips for PHENIX SVTX Silicon Strips for PHENIX SVTX: Overview Abhay D. & Doug F. –Activities and status of QA test facilities at SBU and UNM, respectively Kieran B. –IV/CV tests at BNL/Instrumentation & near future plans and possibilities of use of BNL-Instrumentation automatic probe station during Fall 2004 Junji T. –Strip pre-production and SINTEF visit: Necessity of pre-production, status and plans for near future –Status of sensor test with SVX4 chip at RIKEN Junkichi A. –Strip sensor sensor dark current measurements at RIKEN (temperature dependence of leakage current) Y. Goto –Summary of R&D at RIKEN Vince C. –ROC development and issues (see next slide) John L./Craig O. –Strip pilot status Vladimir Rykov, Hua Pei: Simulation issues/status

Silicon Strips for PHENIX SVTX Points of Concern/Discussion Today (remind myself) Pitch adaptor: (comments from Junji/Vince) –Pitch of Sensor (80 microns) SVX4 (48 microns) Part of the sensor? Put it on ROC? Is the adaptor going to be DC or AC coupled? –To be decided after we hear about S/N ratio measured by Junji et al. At RIKEN Radiation Length Budget: –Strip Sensor: thickness: >3%? Vince’s recent –Significant increase from 1.8%, but first realistic numbers –Cooling etc. estimates realistic? Compare with ALICE/Hiroaki –Impact: simulations needed, comments --> Discussion/Vladimir

Silicon Strips for PHENIX SVTX QA plans at Stony Brook (I) In February 2004: Junji,Atsushi,Hiroaki & Abhay visited the SBU Silicon Detector QA facility SBU High Energy Physics Group involved in the D0 Silicon VTX upgrade: Principle QA facility, experts who developed the QA procedure for D0 Unfortunately, most of the upgrade expect L0 inner most layer upgrade was cancelled. SBU-HE group does NOT need their infrastructure after (~) December 2004 for about 2yrs when PHENIX could utilize the laboratory SBU-RHIC Group plans to do just this and perhaps augment the facility with additions

Silicon Strips for PHENIX SVTX QA at SBU (II) What is available at SBU Silicon Laboratory? –A clean room –An semi-automatic probe station –Expertise in programming and performing the QA –All after approximately January What SBU RHIC group will provide? –Initially, trainies who get trained on the system with D0 L0 Si VTX testing (Fall of 2004) –Abhay + 1 post doctoral fellow + at least 1 graduate student + local technical support + Undergraduate Student(s) –Then we will essentially take over the laboratory for PHENIX use some time in Spring 2005 (AFTER D0 work is COMPLETED) –If needed additional large space and additional clean room facilities –In addition: we are exploring possibility of augmenting the existing Lab. Facilities with a Wire-Bonder which PHENIX could use. Status will be clear towards the end of the Summer 2004.

Silicon Strips for PHENIX SVTX What if we need additional facility earlier? Early alternative for PHENIX: –BNL Instrumentation (Z. Li) has recently indicated that WE PHENIX/SBU/RIKEN could use one of the existing semi-automatic probe station in the Instrumentation if we want to. –Kieran Boyle (SBU Graduate student) is exploring this option and will talk more about this in his presentation –In principle, this can be a useful option if needed in addition to UNM and RIKEN within the next month or two, before the SBU facility becomes fully available in Spring 2005