"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.

Slides:



Advertisements
Similar presentations
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
Advertisements

11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 25 June, 2002WFC3 Monthly Status Review1.
S. Baggett, J. Anderson, K. S. Long, J. W. MacKenty, K. Noeske, J. Biretta, and the WFC3 team (STScI) WFC3 : Understanding and mitigating UVIS charge.
1 TIPS 2011 May Persistence in the WFC3 IR detector Knox S. Long.
The Field Camera Unit Project definition, organization, planning S. Scuderi INAF – Catania.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
Page 1. Page 2 SMOV Status SMOV is proceeding on-track Key programs executed –ERO program –Geometric distortion program completed –ACS to FGS alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
1 Wide Field Camera 3 Monthly Status ReviewJuly 17, 2007 WFC3 TIPS July 19, 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
NIRSpec Operations Concept Michael Regan(STScI), Jeff Valenti (STScI) Wolfram Freduling(ECF), Harald Kuntschner(ECF), Robert Fosbury (ECF)
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
May 21, 2009John MacKenty, STScI1 WFC3 SM4 Events and Current Status.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
HST Cal Conf -- Oct 27, 2005 Calibration Status and Results for Wide Field Camera 3 – R. Kimble/GSFC, Calibration Status and Results.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
1 TIPS May 17, 2007 WFC3 Ambient Calibration #2 Results H. Bushouse.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
1 Hubble Science Operations Status Rodger Doxsey 18 November 2004.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
The Second Generation of IR detectors for WFC3 Massimo Robberto European Space Agency and Space Telescope Science Institute.
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
February 21, 2002TIPS meeting1 "Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." TIPS.
1 WFC3 – Critical Science Review Science Driven CEIs Requirements.
May 22, 2003WFC3 Report at the June 03 TIPS1 Optical alignment and image quality testing at GSFC Test lead: Bill Eichorn, GSFC Test conductors: George.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
The Field Camera Unit Results from technical meeting S. Scuderi INAF – Catania.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
HST Cal Conf -- Oct 27, Calibration Status and Results for Wide Field Camera 3 – R. Kimble/GSFC, Calibration Status and Results.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
S. Baggett, J. Anderson, J. MacKenty, J. Biretta, K. Noeske, and the WFC3 team (STScI) HST/WFC3 UVIS Detectors: Radiation Damage Effects and Mitigation.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
TEMPO Instrument Update
Single Object & Time Series Spectroscopy with JWST NIRCam
WFC3 STUC 18 November 2004 Optical Stimulus.
JWST NIRCam Time Series Observations
STScI Ground System Development Status:
Presentation transcript:

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS Sub-array WFC3 Encircled Energy Testing Best Focus Curve Sept 19, 2002

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 2 Pre-Ship Review at Ball (Sept 17) SPIE in Kona (talks by MacKenty, Robberto, booth, slide show) WFC3 Mini-Handbook: SOC review complete, in press (Giavalisco et al.) OP-01: in WOWG review, next release Oct 31 (W.Baggett, ed.). ISRS (online at WFC3 Qualitative Design Orientation and POS TARG Coordinate Definitions (Lupie & Hartig) Wide Field Camera #3 IR and UVIS Filter Wheel Slot Assignments (Lupie) WFC3 UVIS and IR Channel Alignment Properties (Stiavelli) WFC3 Science Calibration Plan Part 2: An Overview of the Pre-flight Data Handling System (Reid) WFC3 Science Calibration Plan Part 1: Overview of Ground-Based Ambient and Thermal Vacuum Calibration Tests (Reid) The reference pixels on the WFC3 IR detectors (Robberto et al.) Internal background and dark current of the IR channel of WFC3 in ambient conditions (Stiavelli) Meetings/Documentation

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 3 UVIS & IR Image Suites  Full Suite IR & UVIS test bench images delivered by Ball according to schedule  All images processed and analyzed, fixes implemented by both FSW and pipeline/archive group.  WFC3 generic conversion and Keyword Database now in good shape. Data Processing Pipeline Not to scale; only 1 UVIS chip shown IR UVIS

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 4 Archive and ETC Archive  WFC3 tables & catalog defined; CDBS test environment in place.  Next step  receive and process MEB-generated detector images. Institute-level ETC Development  Requirements and test cases delivered to STScI APT.  Improved spectra for optical & near-IR sky background (incl. contribution from zodiacal light & Earthshine) now available in ETC.

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 5 Front End System  STScI Front End Development: on schedule.  Phase 5: Anneal Mode (proposal instructions, preprocessor, TRANS, & commanding) development done, currently in testing; UVIS subarray requirements gathering has started.  Timing & SMS Testing: Boot and Operate macro timing tests nearing completion. UVIS detector timing test ready to run (next step: IR detector and mechanisms).  WFC3 Interface (splinter) meeting Ball on Aug 3. Most recent Interface Ball on Sept 16.

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 6 Front End System Schedule Phase 1 (7/1/00 – 12/31/00) 1. Macro Definitions  2. Reconfigurations  Phase 2 (1/1/01 – 6/30/01) 3. Aperture Definitions  4. Basic UVIS ACCUM Mode  5. UVIS Dark and Bias Calibrations  Phase 3 (7/1/01 – 12/31/01) 6. Basic IR MULTIACCUM Mode  7. IR Dark Calibrations  8. UVIS & IR Tungsten and D 2 Lamp Operations  Phase 4 (1/1/02 – 6/30/02) 9. UVIS & IR ALIGN Mode  10. SAA Contour Definitions  11. UVIS & IR Spatial Patterns  12. IR Bright Earth Avoidance  13. IR Subarrays  Phase 5 (7/1/02 – 12/31/02) 14.Contingency Rework 15.ANNEAL Mode  IN TEST 16.UVIS Subarrays  NEXT ITEM 17.SMOV Special Commanding, Part 1 Phase 6 (1/1/03 – 6/30/03) 18.SMOV Special Commanding, Part 2 19.SMGT Preparations 20.UVIS Binning 21.CTE Monitoring Phase 7 (7/1/03 – 12/31/03) 22.UVIS Post-Flash Capability 23.Autoimage Insertion for UVIS Prism Operations 24.IR Automatic Post-SAA Darks Notes : -Reconfiguration programming & updates occur in each phase -Test SMS are ready for running on the software benches.

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 7 Detectors - UVIS  Ball completing final stages of enclosure for flight build 1.  DCL has completed data acquisition on irradiated devices 152 (2.5 & 5 yr) & 189 (1 yr).  Performance trade study underway: charge injection vs preflash.  Science IPT to consult with SOC, then make recommendation to the project.

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 8 Detectors - IR  FPA32 – Mechanical failure of TEC during early installation. No obvious problem: not TEC problem, qual unit successfully bonded. Ball is working on it.  Fabrication of Lot 7 detectors for WFC3 at Rockwell is ahead of schedule. Expected to have FPA50’s QE, stability of FPA32. Processing intended to minimize the dark current instabilities of the detectors. TEC FPA

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 9 Detectors – IR QE curves

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 10 Detectors – IR – testing of Lot 7  Testing of the first Lot 7 parts is underway at RSC.  Team personnel visited RSC on Sept. 10 to discuss the initial results of first 2 units. - Excellent QE, nearly perfect cosmetically. - Dark current unacceptably high; processing for subsequent detectors to be adjusted. Dark current (e-/s/pix) Num Of pixels

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 11 Optical Alignment  Optical Alignment at Ball Supported test activities, analyses of PSFs and modelling. WFC3 Optical Bench in the clean room with test equipment being readied for optical alignment

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 12 First Light First light on the UVIS channel : 9:20AM MST 8/10/02

"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 13 First Light Image In ground testing the 633nm UVIS PSF beats the encircled energy spec and goal performance. IR currently being done.