LIGO-G030258-00-D Commissioning and Detector Plans Stan Whitcomb Program Advisory Committee 6 June 2003 Caltech.

Slides:



Advertisements
Similar presentations
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Advertisements

Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G D 1 Requirements Environment and constraints Performance requirements Functional requirements.
Laser Interferometer Gravitational-wave Observatory1 Characterization of LIGO Input Optics University of Florida Thomas Delker Guido Mueller Malik Rakhmanov.
LIGO-G M 1 Initial LIGO Seismic Isolation System Upgrade Dennis Coyne LIGO Seminar March 29, 2002.
Overview Ground-based Interferometers Barry Barish Caltech Amaldi-6 20-June-05.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
Advanced LIGO Commissioning Overview Stanford LVC Meeting, August 27, 2014 Peter Fritschel.
1 LIGO-G D LIGO Commissioning PAC Meeting, 18 May 2005, LIGO Livingston Joe Giaime, LSU & LLO, for the entire commissioning team. PAC Meeting,
LIGO-G D Commissioning PAC11, 2001 Daniel Sigg, LIGO Hanford Observatory.
G D Initial LIGO improvements & Advanced LIGO P Fritschel PAC Meeting LLO, 18 May 2005.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
G R DC Readout for Advanced LIGO P Fritschel LSC meeting Hannover, 21 August 2003.
LIGO-G D Installation and Commissioning Status Stan Whitcomb Program Advisory Committee 14 June 2001 Caltech.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
LIGO-G Z LIGO Commissioning Report LSC Meeting, Hanover August 19, 2003 Peter Fritschel, MIT.
Status of LIGO Aspen January, 2005 Nergis Mavalvala LIGO-G D Commissioning and detector improvements for S4.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
LIGO- G D Status of LIGO Stan Whitcomb ACIGA Workshop 21 April 2004.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
LIGO-G D The LIGO-I Gravitational-wave Detectors Stan Whitcomb CaJAGWR Seminar February 16, 2001.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
LIGO-G D Commissioning, Part II PAC 12, June 2002 Peter Fritschel, LIGO MIT.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
LIGO-G Z Guido Mueller University of Florida For the LIGO Scientific Collaboration ESF Exploratory Workshop Perugia, Italy September 21 st –23.
LIGO-G D LIGO Detector Performance Michael E. Zucker LIGO Livingston Observatory NSF Review of the LIGO Laboratory 17 November, 2003 at LIGO Livingston.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
LSC Meeting at LHO LIGO-G E 1August. 21, 2002 SimLIGO : A New LIGO Simulation Package 1. e2e : overview 2. SimLIGO 3. software, documentations.
Status of LIGO Andri M. Gretarsson Livingston Observatory LIGO-G L.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
23/7/2003LIGO Document G C1 LIGO S2 Overview Philip Charlton California Institute of Technology On behalf of the LIGO Scientific Collaboration.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
G D LIGO Commissioning Update LSC Meeting, March 16, 2004 Peter Fritschel.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO-G D Commissioning P Fritschel LIGO NSF review, 23 October 2002 M.I.T.
LIGO-G D Advanced LIGO Systems & Interferometer Sensing & Control (ISC) Peter Fritschel, LIGO MIT PAC 12 Meeting, 27 June 2002.
Aspen January, 2005 Nergis Mavalvala
Reaching the Advanced LIGO Detector Design Sensitivity
Fred Raab, LIGO Hanford Observatory November 8, 2005
Commissioning Progress and Plans
Installation and Commissioning Status Stan Whitcomb
Nergis Mavalvala MIT IAU214, August 2002
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
Design of Stable Power-Recycling Cavities
Commissioning the LIGO detectors
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Status of the LIGO Detectors
40m Laboratory Upgrade Progress Report
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
Improving LIGO’s stability and sensitivity: commissioning examples
Panel Questions addressed
Status at the Prague meeting
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Presentation transcript:

LIGO-G D Commissioning and Detector Plans Stan Whitcomb Program Advisory Committee 6 June 2003 Caltech

LIGO-G D LIGO PAC -- June Commissioning History Now E2 E3 E4 S1 Science Run Washington earthquake First Lock One Arm Power Recycled Michelson Recombined Interferometer Full Interferometer Washington 2K Louisiana 4k Washington 4K LHO 2k wire accident S2 Science Run Q 2Q 1Q 4Q 3Q 4Q 3Q E1 E5 Inauguration E6 4Q2Q 1Q 3Q E7E L4k strain 150 Hz [Hz -1/2 ] Q1Q E

LIGO-G D LIGO PAC -- June First Science Run (S1) August 23 - September 9, 2002 (~400 hours) Three LIGO interferometers, plus GEO (Europe) and TAMA (Japan) Range for binary neutron star inspiral ~ kpc Hardware reliability good for this stage in the commissioning »Longest locked section for individual interferometer: 21 hrs (11 in “Science mode”) LLO-4KLHO-4KLHO-2K3x Coinc. Duty cycle42%58%73%24%

LIGO-G D LIGO PAC -- June S1 Sensitivities Will hear about searches for different sources tomorrow

LIGO-G D LIGO PAC -- June S1 Noise Component Analysis, LLO 4k G D 5 Rana Adhikari noise analysis

LIGO-G D LIGO PAC -- June Changes Between S1 and S2 Optical lever improvements »Structural stiffening (designed for thermal/kinematic stability, not low vibration) »Improved filtering to take advantage of reduced resonances »Pre-ADC "whitening" for improved dynamic reserve Improved DAC "De-Whitening" »Match DAC dynamic range to spectrum of correction forces at each frequency »Tricky handoff; reciprocal analog & digital filters must switch roles after lock acquisition, without transients Digital Suspensions installed on LHO-2K and LLO-4K »New coil drivers & realtime control code for suspensions »Lower noise, switchable dynamic range (200 mA acquisition, 5 mA running) »Separate DC biases for alignment »Better filtering, diagonalization and control/sequencing features MORE POWER »Enabled by better alignment stability »Also required control of "I-phase" photocurrent (overload) »Now ~ 1.5 W into mode cleaners, ~ 40 W at beamsplitter (R~40) »Only mA average DC photocurrent at dark ports !! (optics very good)

LIGO-G D LIGO PAC -- June Stability improvements for S2 Wavefront sensing alignment control progress »LHO-4K: 8 of 10 (14) alignment degrees-of-freedom under feedback control –Greatly improves long term power stability –Still need: all DOF; more feedback bandwidth to reduce short term power fluctuations »LLO-4K: 2 DOF under feedback control –Bandwidth of this loop increased 10x since S1, reducing short term fluctuations –Phase camera implemented: makes a 2-D map of the RF amplitude and phase Proven useful as a manual alignment aid »LHO-4K: 2 DOF under feedback control

LIGO-G D LIGO PAC -- June S1 6 Jan

LIGO-G D LIGO PAC -- June Second Science Run (S1) February 14 – April 14, 2002 (~ 1400 hours) Three LIGO interferometers and TAMA (Japan) Steady improvement in sensitivity continues »Range for binary neutron star inspiral for LLO-4K up to 1.2 Mpc Duty cycle similar to S1 »Increased sensitivity did not degrade operation »Longest locked stretch ~ 66 hours (LHO-4K) LLO-4KLHO-4KLHO-2K3x Coinc. Duty cycle37% (42%)74% (58%)58% (73%)22% (24%)

LIGO-G D LIGO PAC -- June S2 Sensitivities Approximately 10x improvement over S1 LIGO I Design Preliminary!

LIGO-G D LIGO PAC -- June Tasks at Hand Seismic retrofit at LLO Finish wavefront sensing alignment system RFI cleanup, linear power supplies Thermal lensing Shot noise sensitivity Optical gain increase of LSC photodiodes Acoustic coupling Others: microseismic peak reduction (LHO), ISS, photon calibrator, ASI servo, WFS 5, replace lossy PMCs, clean MC mirrors, digital IO WFS, tune up PSLs, remote power dial, 2K ITMX replacement, read/ process more LSC channels, finish stabilization servos, duty cycle

LIGO-G D LIGO PAC -- June Commissioning: SEI Upgrade The Seismic Isolation System (SEI) at LLO needs to be upgraded »Seismic noise environment much worse below 10 Hz than originally planned (logging largest factor, but also train, other anthropogenic noise) »Plan is to add an active, external pre-isolation (EPI) stage without disturbing the alignment of the installed optics Current Plan: »Continue prototype testing at LASTI, including migrating from dSpace to VME based controls »Review held for 4/18; management decision on how to proceed pending »Order components, fabricate and assemble; fabrication/assembly phase lasts ~5.5 months »Installation starts ~Jan ‘04 and should complete ~Apr ‘04

LIGO-G D LIGO PAC -- June Commissioning: SEI Upgrade at MIT Hydraulic External Pre-Isolator (HEPI) electro-Magnetic External Pre-Isolator (MEPI) BSC HYDRAULIC ACTUATOR ( HORIZONTAL ) OFFLOAD SPRINGS HYDRAULIC LINES & VALVES CROSSBEAM PIER HAM STIFFENING BEAM OFFLOAD SPRING CROSSBEAM ELECTRO-MAGNETIC ACTUATORS

LIGO-G D LIGO PAC -- June Optical characterization Good news: optics quality is (almost all) good »Recycling gain meets or exceeds goals –LLO-4K: Gain of nearly 50 seen, more usually about 45 –LHO-4K : Gain of »Contrast defect meets or exceeds goals –LLO-4K : P as / P bs = 3 x –LLO-4K : P as / P bs = 6 x Bad news: Very low RF sideband gain/efficiency »LHO-4K : Sideband power efficiency to AS port: ~6% »Cause: thermal lensing in the ITMs isn’t at the design level »Achieving shot noise goal requires that this be fixed LHO-2K: Cause of low recycling gain (20) discovered »Bad AR coating on ITMX, must be replaced

LIGO-G D LIGO PAC -- June Thermal Lensing RF sideband efficiency is very low »Efficiency: TEM 00 SB power at anti- symmetric port, relative to input SB power »H1 efficiency: ~6% »Need a stable PRM: lack of ITM thermal lens makes g 1 ·g 2 > 1 »Thermal lensing relies on point design Possible solutions »Change RM (w/ new ROC); 6 month lead time »Add the missing heat to ITMs with another source »Operate at optimal power (could be higher or lower than design!) DC (carrier) RF sidebands Arm power RF sidebands in PRM Bad mode overlap ITM Heating

LIGO-G D LIGO PAC -- June Shot Noise Sensitivity Simple power calculations project a factor of ~2 shortfall »Improvements to SB efficiency with thermal lensing should get us there Pick-off detector »Power levels in pick-off beams not well controlled, could limit noise through cross- couplings if not careful Factor of 6 short only 10x more light avail. H2 Sensitivity with 50-70mA of Light

LIGO-G D LIGO PAC -- June Optical Gain Increase for LSC Photodiodes Dynamic range requirement: 1000x »Locking ~100  A / running ~100 mA »Solution: –Separate PDs for locking (low power) and running (high power) –Remote control for input power ASI signal dominant! Multiple AS port detectors »LHO-4K: P AS = ~500 mW  4 detectors »LLO-4K: P AS = ~30 mW  1 detector ASI Servo AS Port

LIGO-G D LIGO PAC -- June Acoustic Peaks: Scattering/clipping Peaks occur in Hz band, at a level x the SRD Source for LHO correlated noise (stochastic search) Considering: »Acoustic isolation improvements: ISC tables only, or all LVEA? »Modify output periscopes/mirror mounts: stiffer, damped »Active ISCT beam direction stabilization »Larger in-vacuum Faraday »Eliminate EO shutters quiet loud Acoustic Excitations

LIGO-G D LIGO PAC -- June Summary Lots to do!