Network design Topic 6 Testing and documentation.

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Advertisements

QuEdge Testing Process Delivering Global Solutions.
System Testing 2  Effective March 3, 2014, new requirements for system testing were implemented  State Agencies are now required to provide to FNS:
Network Management Basics Network management requirements OSI Management Functional Areas –Network monitoring: performance, fault, accounting –Network.
Software Quality Assurance Plan
CREATING CERTAINTY Intelligent router tool, designed to create certainty in your network. 1COPYRIGHT © 2010 SERTUS NETWORKS LIMITED - ALL RIGHTS RESERVED.
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
ITIL: Service Transition
Network Design and Implementation
P ART 4 T ESTING, O PTIMIZING AND D OCUMENTING Y OUR N ETWORK D ESIGN 1.
VoIP: Full Lifecycle Management Russell M. Elsner APM Technology Director OPNET Technologies, Inc.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Prototyping the WAN Designing and Supporting Computer Networks – Chapter 8.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Implementation Plans and Teams IACT424/924 Corporate Network Design and Implementation.
Managing the Information Technology Resource Jerry N. Luftman
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Testing - an Overview September 10, What is it, Why do it? Testing is a set of activities aimed at validating that an attribute or capability.
Introduction to Software Testing
Load Test Planning Especially with HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
Documenting Network Design
CIS460 – NETWORK ANALYSIS AND DESIGN
Solution Overview for NIPDEC- CDAP July 15, 2005.
Web Development Process Description
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Characterizing the Existing Network Designing and Supporting Computer Networks.
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Server Virtualization: Navy Network Operations Centers
Test Organization and Management
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
IT Requirements Management Balancing Needs and Expectations.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Identifying Application Impacts on Network Design Designing and Supporting.
Software Quality Assurance
NETE Computer Network Analysis and DesignSlide 1 Documenting Network Design NETE-4635 Computer Network Analysis and Design.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
© 2009 Cisco Systems, Inc. All rights reserved. ROUTE v1.0—1-1 Planning Routing Services Creating an Implementation Plan and Documenting the Implementation.
Top-Down Network Design Chapter Twelve Testing Your Network Design Oppenheimer.
Chapter Sixteen Managing Network Design and Implementation.
Network design Topic 1 Business goals. Agenda Network life cycle Network design process Business goals Scope Constraints.
Network design Topic 2 Existing network infrastructure.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Preparing the Proposal Designing and Supporting Computer Networks – Chapter 9.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Prototyping the Campus Network Designing and Supporting Computer Networks.
Chapter 12 The Network Development Life Cycle
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
State of Georgia Release Management Training
Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Creating the Network Design Designing and Supporting Computer Networks – Chapter.
ITEC 275 Computer Networks – Switching, Routing, and WANs
ITIL: Service Transition
BA Continuum India Pvt Ltd
Software and Systems Integration
Top-Down Network Design Chapter Twelve Testing Your Network Design
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
Software Requirements
Introduction to Operating Systems
Description of Revision
Introduction to Software Testing
IS4680 Security Auditing for Compliance
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

Network design Topic 6 Testing and documentation

Agenda Testing tasks Prototyping Testing plan Tools Network Design Document

Testing Ensure that the design has met the business and technical goals Provide assurance and demonstrate to the customer that the solution meets business and technical goals Identify problems Acceptance testing – To demonstrate how the solution meets the goals to the customer's satisfaction – To obtain signoff and approval to move to implementation stage

Testing tasks Verify that the design meets business and technical goals Validate LAN and WAN technology and device selections Verify the Service Provider plan Identify bottlenecks or connectivity problems Test redundancy and effect of link failure Determine optimisations Acceptance testing Identifying risks and planning for the implementation process

Industry testing Vendors, independent test labs and trade journals publish testing information Generally, most tests are component tests and not whole system tests – Testing results made not be relevant to the design and configuration – How valid are the test results? For complex networks, design your own tests

Prototyping Prototype is a model of a system which can validate the operation and performance of the system – It is not the complete system – Should include the most important functions and risky functions – Should demonstrate elements of the design to the customer – Use resources effectively: people, equipment, money and time

Prototyping Test network in a lab – Work out the bugs without impacting users – Initial configurations, evaluate products – Model predicted performance and QoS Integrated into production network but tested off hours Integrated into a production network and tested in business hours

Planning a ‘live’ test Advise users in advance and ask them to continue with normal work tasks Advise administrators and managers in advance Run multiple short tests to minimise user impact Run tests with small traffic and configuration changes first and move up to larger impact tests

Test plan Test objectives and acceptance criteria Types of test to run Network equipment and other resources required Test scripts Timeline and milestones for testing the project

Objectives and acceptance criteria Based on the business and technical goals Objectives should be specific and concrete Stated so that a pass or fail can be recorded Test should measure results without industry bias and be based on industry standards where possible Use baselines as reference point for comparison tests, eg 20% less CRC error rate

Types of test to run Performance tests – Throughput – Delay – Delay variation – Response time – Efficiency Stress tests – Decreased service when the load increases Failure analysis – Network availability and accuracy – Causes of outages Other tests – Manageability, useability, adaptability, security, regression

Documenting network equipment Network topology drawing – Major devices, addresses, names, WAN and LAN links and link capacity List of devices that will be required – Names, version numbers, availability Testing tools – Network management and monitoring tools – Traffic generation tools – Modelling and simulation tools – QoS and service-level management tools Other resources needed – Time in lab – Power, air conditioning, rack space – Staff and users required

Test scripts Test objective Acceptance criteria Topology Testing steps – What tools is used for each step – What measurements will be taken – Initial values and testing parameters – What information will be logged

Timeline and milestones List major tasks and the person assigned to those tasks – Writing test objectives and acceptance criteria – Design the network topology – Determine hardware and software Order hardware and software Confirm availability – Write test scripts – Install and configure hardware and software – Conduct tests – Log results – Analyse results Create test report – Present results to customer

Testing tools Network-management and monitoring tools – Cisco Works – HP OpenView – IOS commands and OS tools Traffic-generation tools – Protocol analyser – Multiport traffic generators Modelling and simulation tools QoS and service-level-management tools – NetPredictor

Network design document Executive summary Project goal Project scope Design requirements – Business goals – Technical goals – User communities and data stores – Network applications Current state of the network – High level map – Health and performance analysis Logical design Physical design Results of network design testing Implementation plan – Project schedule – Project budget Design document appendix

Agenda Testing tasks Prototyping Testing plan Tools Network design document