1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Cleco Transmission Planning Summit 2013
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2012
Entergy Louisiana, LLC (North) 2010 to 2012 Draft Construction Plan
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Xcel Energy Projects From 2008 Reliability Assessment.
Nov 11, 2011 RPG Meeting Cross Valley Brownsville Loop Project – Status report.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting December 16, 2009.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
1 New Orleans, LA July 31, 2007 Randy Helmick Vice President, Transmission Business Entergy Transmission Planning Summit.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
DEC System Voltage Planning - June 2018
Presentation transcript:

1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007

2 Proposed EGSI-LA Transmission Reliability Projects Port Hudson Bus Upgrade (2007) McManus Capacitor Bank Expansion (2008) Jefferson Davis 69 kV System Improvements Phase I (2008): Lawtag-Jennings Winn cap bank installation Phase II (2011): Chlomal-Lacassine Lacassine breaker installation Welsh to Lawtag Nesser Sub: Build a new 69kV line (2009) 138 kV Alchem-Monochem: Line Upgrade (2010) Various Areas: Circuit Breaker Upgrades (2007 and beyond) Acadiana Area Voltage Improvement (2009) Colonial Academy Cap Bank Installation (2010)

3 Scenario: The Port Hudson 230/69kV auto is rated at 200 MVA, but its 69kV terminal jumper is rated at 135MVA. This terminal along with some associated switches may overload under contingency. Recommended solution: Temporary solution: Upgrade underrated bus section and switches Proposed In-Service Date: 2007 Estimated cost: $60 k Long Term Solution: Reconfigure Pt. Hudson 69kV substation to a breaker and half or ring bus, or build a new substation adjacent to the existing. Detailed scope and in-service date to be determined. Port Hudson : Bus/Switch Upgrade

4

5 Scenario: The 69kV transmission system between Jennings and Chlomal substations serves approximately 90 MW of load including the radial transmission system from Lawtag substation. The main "trunk" of this system is the contiguous segments comprised of Line 13 (Jennings-Compton-Elton), Line 16 (Elton- Tupper-Serpent-Carter), and Line 11 (Carter Lacassine-Chlomal). This 69kV system is part of the underlying lower voltage system in parallel with the bulk 500 kV lines between Lafayette and Lake Charles. Lawtag to Jennings 69kV line overloads for the loss of 500kV line from Nelson to Richard and a couple of others lines in Entergy’s system. Chlomal to Lacassine 69kV line overloads for the loss of 69kV line segments between Jennings and Elton. For the loss of 500kV line Nelson to Richard, 69kV line from Welsh to Lawtag will overload. Recommended solution: Phase I (2008): Upgrade 4.78 miles of 4/0 CU from Jennings to Lawtag with a conductor rated at least 106 MVA of capacity. Install a 15 MVAr capacitor bank at Winn Substation. Phase II (2011): Upgrade miles of 1/0 ACSR from Chlomal to Lacassine with a conductor rated at least 69MVA of capacity. Install a circuit breaker at Lacassine. (breaker installation will depend on cost and benefits it provides) Upgrade about 6 miles of 4/0 CU from Welsh to Lawtag with a conductor rated at least 69 MVA of capacity. Jefferson Davis: 69 kV System Improvement

6 Install 15 MVAr Capacitor at Winn Upgrade 69 kV line from Lawtag to Jennings Install a breaker at Lacassine Upgrade 69kV line from Chlomal to Lacassine Upgrade 69 kV line from Welsh to Lawtag

7 Nesser Area Voltage Improvement Scenario: Nesser is on a long radial tap on the Harelson-Jones Creek 69kV line. Nesser substation is experiencing rapid growth of over 6% per year. For the loss of Harelson-Nesser tap, voltage at Nesser drops below acceptable level. Recommended Solution: Build a new 69kV line from Jefferson to Nesser Substation. Proposed In-Service Date: 2009 Estimated cost: $4.6 MM

8 Nesser Area Voltage Improvement Build a new 69 kV line

9 69 kV McManus Capacitor Bank Expansion Scenario: The 69 kV transmission system radiating north of Port Hudson substation serves 12 substations including McManus. Loss of Port Hudson to Jackson 69kV line will cause low voltages at multiple substations. Recommended Solution: The existing cap bank rating is 18 MVAR. Install additional cells adding up to 30 MVAR capacity. Remove fuses from a group of cells leaving sufficient number energized to provide only 24 MVAR output for now. As the need arises, install fuses on the remaining cells and restore the full capacity to 30 MVAR. Final cap bank size depends on load growth. Proposed In-Service Date: 2008 Estimated cost: $230 k

10 Expand 69 kV capacitor bank 69 kV McManus Capacitor Bank Expansion

11 Lafayette Area Voltage Improvement Scenario: Loss of 138kV line from Moril to Leblanc or Moril to Hopkins will cause low voltages at a couple of substations in Lafayette area. Recommended Solution: Install two 36 MVAr cap banks at Leblanc. In addition, the existing 18MVAr cap bank at Meaux needs to be upgraded to 36MVAr. The normally-open switch at Lake Arthur needs to be closed after the completion of the Winn cap bank installation and upgrade of the 69kV line from Lawtag to Jennings. Proposed In-Service Date: 2009 Estimated cost: $2.3MM

12 Install two 36MVAr cap banks at Leblanc Upgrade existing 18MVAr cap bank at Meaux to 36MVAr Acadiana Area Voltage Improvement

kV Colonial Academy Capacitor Installation Scenario: Loss of 138kV line from Richard to Colonial Academy will cause low voltages at Colonial Academy, Acadia, Scanlan and Scott. Recommended Solution: Install a 36 MVAr capacitor bank at Colonial Academy or at Acadia substation for contingencies only. Proposed In-Service Date: 2010 Estimated cost: $1 MM

14 Install 138kV capacitor bank 138 kV Colonial Academy Capacitor Installation

15 Alchem - Monochem: Upgrade 138 kV Line Scenario: Alchem to Monochem 138kV line overloads for the loss of any segment of the 230kV line Vulchlor-Woodstock-Belle Helene-Licar-Polscar-Willow Glen. Recommended Solution: Upgrade 6.76 miles of 336 ACSR line and bus at Alchem and Monochem with a conductor rated at least 380 MVA of capacity. Proposed In-Service Date: 2010 Estimated cost: $4.5 MM

16 Upgrade 138kV Line Alchem - Monochem: Upgrade 138 kV Line

17 EGSI-LA Breaker Upgrades Scenario: Based on symmetrical and asymmetrical fault current analysis, various circuit breakers have been identified as underrated. Recommended Solution: Replace identified underrated circuit breakers with appropriately sized breakers. –Mossville 138kV # –Scott 138kV #’s 8820, & 8825 –Carlyss 69kV #’s 7840 & 8775 –Nelson 138kV # 7990 –Coly 69kV #’s 20375, & –Esso 230kV #’s 20075, 20080, 20085, –Nelson 230kV # –Scott 69kV #’s 8865, 8860 Proposed In-Service Date: 2007/2008 Estimated cost: $2.5MM

18 Target Areas Around Acadiana Area Beyond 2011 Richard-Colonial Academy- Scott line overloads FTLO Webre-Wells 500 kV line, lines crossing the Atchafalaya Basin overload Wells Scott-Judice-Meaux Line Overloads Note: FTLO means “for the loss of” Scott Auto overloads FTLO either. Champagne to Sunset line overloads Scott to Carencro Line Overloads. Lafayette to Holiday line overloads

19 Target Areas Around Lake Charles Beyond 2011 Nelson-Mossville Line overloads Spot loading and load growth increasing on distribution level voltage L.C. Bulk auto overloads FTLO either Nelson-Moss Bluff 230kV line overload Upgrade L.C. Bulk to Chlomal

20 Upgrade Chlomal-Iowa 69 kV line Expand existing capacitor bank at Sarpent or Elton Jennings Auto overloads FTLO either

21 Target Areas Around Baton Rouge Beyond 2011 Coly-Denham Springs overloads, FTLO Gloria-Harelson Gloria-Harelson overloads, FTLO Coly-Denham Springs 69 kV line Jackson to Marydale overloads