NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC.

Slides:



Advertisements
Similar presentations
Hallmark w/Onsite Built Garage.
Advertisements

Tam Valley School Modernization - Phase 1 Summer 2011.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Flip this House Indiana! WE BELIEVE!!. Budget Septic$7,500 Sump Pump$1,100 Mold Treatment$600 gutters vinyl$350 window install$4,500 HVAC$750 carpet$2,000.
Objective: Develop plans for kitchen cabinets.
Hogan Residence Valued Repeat Customer Kitchen Remodel Kitchen Remodel See other presentations: See other presentations: Basement Bath Addition Basement.
CURRENT WORK West Wing - Exterior: Masonry and shingles finished, fascia and soffit work ongoing - 1 st Floor: Final coat of paint, casework installed,
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Custom Estate in Thousand Oaks Concept Vision Construction Documents.
Chapter 14 Floor-Plan Symbols.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
GMP and HACCP in school restaurants Comenius School Development Project 2006/07 Srednja šola Zagorje.
Elevations.
Understanding House Plans
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
FLOORSFLATSTOTAL AREA FIRST SECOND THIRD ST, 2 ND & 3 RD FLOOR PLAN FLOOR PLAN OF 2 BHK LUX. APARTMENT ON PLOT NO.
Site Plans.
As you walk into the front door: view into dining area and kitchen. This apartment has vinyl plank flooring in the living and dining areas and the kitchen.
Experience the verve of living by the banks and drift through the historic and scenic beauty of Pasig River. Project lot area composed of 14,000 square.
13 SCHOOL SAFETY CONCERNS AND IMPROVEMENT TRCS Rensizzle Architecture 2013 By: Jonathan, Melanie, Khalil, Abd-Elrahman,Ram Report Investigation Date: October.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
HVACR116 – Trade Skills Mechanical Drawings.
Section B Inventory Process and Forms. General Inventory Actions %Getting Started Set inventory goals and objectives %Who District Program Manager Site.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Finishing the Building
1 Levine Hall (Upenn) Photo Analysis. 2 Very nice stairwell.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
Chapter 24 Millwork and Cabinet Technology, Cabinet Elevations, and Layout.
Guinn Hall Project, Summer 2014 Scope of Project Painting Flooring Tub surrounds Tile in bathrooms Electrical upgrades Light fixtures New doors Ceilings.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
St. Peters School Carpeting and Refresh project October 5,6 and 7 th St. Peters School Carpeting and Refresh project October 5,6 and 7 th
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Space Planning Chapter 7 and 16.
FLOOR PLANS WHERE IT ALL BEGINS. FLOOR PLANS 1.Column Grids Backbone of all the documents, especially the floor plans Alpha characters horizontal Numeric.
Capital Improvement Program for September 9, 2014.
46 West Trace Creek The Woodlands, Texas. Front view of home.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
Inspection photo requirements Following this procedure will ensure that you get paid for the work completed. All rights to this document are reserved by.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
RENO IDEAS.
Careers in the Industry
Smrha-Monroe Family Pictures of the House August 2005.
PIP: INTERIOR DESIGN Kelsey. Top View South/West Angled Overview.
 There are 70,000 fires each year in Canada  Preventing fires will lessen the chance of injury or death  Knowing what to do in case of fire can save.
FIRE STATION No. 22 Improvement Project Project Budget Expenses.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
House Project.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
A HOUSE.
What’s with Time Square West? No. of Floors 43 Retail 1st and 2nd floor Parking 5 floors(2 basement, 3rd to 5th floor) No. of units 738 No. of parking.
Foundations of Technology Construction
Cornwall Central School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Buying a new home can be a daunting experience
Assembly And Installation Of Ikea Kitchen Cabinets
Capital Improvements Presentation
WHERE IT ALL BEGINS.
1 Semester Project Design A Multi Story Office Building
Architect’s Scale 1/4” = 1’-0”
Foundations of Technology Construction
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
3 HOUSE LIVING ROOM Your Name DDP Date
Pictorial/Orthographic
Presentation transcript:

NMH – Bldg 16 – Combat Medic Bldg Pictures taken 6 Jul 2010 See also MS Word document titled, “REPAIRS AND IMPROVEMENTS NEEDED IN BLDG 16 - COMBAT MEDIC BLDG AT NMH - 6 Jul 10.doc”

Picture taken from the 3 rd floor stairway looking up at water damage on the window/ceiling.

Typical window screen has holes and screen frames are bent or warped.

Typical latrine

Room C83 – Commandant of School’s Office. Needs AC installed. Needs internet access. Walls need to be patched/painted. Room needs to present professional appearance to students.

A wall or partition with door is needed at the top of the stairs on the 3 rd floor to separate physicians’ locker area from main hallway.

Example of room on 2 nd floor used for student barracks.

Another view of same room on 2 nd floor used for student barracks.

Room B55 on 2 nd Floor. Dining room area. New flooring is needed.

Room B55 on 2 nd Floor. Kitchen Area is worn and damaged. Cabinets, fixtures and finishes are well beyond their life expectancy.

Room B55 on 2 nd Floor. Picture taken from kitchen area looking through to dining area.

Exposed electrical wiring

Typical basement classroom needs improved HVAC, lighting, electrical, and flooring.

Example of water damage on wall of basement classroom.

Alcoves off main hallway in basement have lots of potential. This one shows no evidence of past water damage. These alcoves could be used for Nursing Skills Labs or storage areas if a wall and door were constructed and lighting/electrical were improved.

Another view of alcove off main hallway in basement.

This alcove off main hallway in basement is being used for storage of excess desks. See next slide.

Alcove in the basement used for storage.

Stairway closest to room T1 (in basement).

Stairway closest to room T1 (in basement). Debris under stairs.

Main hallway in basement – picture taken from end of hall closest to Room T1. New flooring / baseboards are needed to improve professional appearance.

Room T1 in basement. Example of paint splatter on transom windows.

Room T9 – Nursing Supply Storage – Shelving is needed. Possibly relocate to room without past history of pipe leakage / water damage. Leaking pipe has caused water damage in this corner…see next slide.

Room T9 – Nursing Supply Storage – Debris and water damage in corner closest to window.

Room T9 – Nursing Supply Storage – Water damage on the ceiling/wall next to the door.