1 Panel on New Air Traffic Control and Management Technology February 23, 2007 Regional Airport Planning Committee Panel on New Air Traffic Control and.

Slides:



Advertisements
Similar presentations
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Advertisements

Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Using CNS/ATM to Dramatically Improve Gate-to-Gate Operations Captain Bob Hilb UPS Advanced Flight Systems October 8, 2007.
Air Traffic Management
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Continuous Climb Operations (CCO) Saulo Da Silva
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Best Practices for Taxi Operations at Towered & Non-Towered Airports
The European Organisation for the Safety of Air Navigation BORYSPIL ACE & PLANNING STUDY Mariia Naumenko.
Automatic Dependent Surveillance – Broadcast (ADS-B) What is it, and how can it help improve operations in Micronesia? Captain Rocky Stone Chief Surveillance.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
Presented to: By: Date: Federal Aviation Administration North Florida Flight Standards District Office FAA Safety Team Safety Presentation Technically.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization ASBU Methodology Summary of Block 0 Modules H. Sudarshan SIP/2012/ASBU/Nairobi -WP/8 Workshop on preparations.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Stabilized Constant Descent Angle NPA’s
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
Special Topics Introduction to Aeronautical Engineering
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Future ATM Technologies May 19 th 2015Oslo ATM conference Oslo, May 19 th 2015 Don-Jacques OULD FERHAT VP, Airspace and Airlines Services.
Rob Eagles Director ASIA PACIFIC Safety, Operations & Infrastructure.
Study Continuous Climb Operations
The Professional Aspects of Mixed Mode for Runway Operations.
The SESAR Target Concept of Operations ASAS Related Aspects
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
GNSS Aviation Applications
Gate-to-Gate Operations Update Captain Bob Hilb UPS Advanced Flight Systems April 14, 2008.
ADVANCED AVIATION TECHNOLOGIES RELATED TO AVIATION CAPACITY IMPROVEMENTS Prepared for: MTC Prepared By: Don Crisp ATAC February 23, 2007.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
NextGen Current System Primary Radar – Creates blip on Radar Screen Secondary Radar – Aircraft encodes identifier and telemetry data VHF Radio – Voice.
By: Date: Federal Aviation Administration Surveillance and Broadcast Services November 12, 2008 Merging and Spacing Enabling Continuous Descent Arrivals.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
Lecture 3: Air Traffic Control Tower
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
The Benefits of RNP-RNAV in Commercial Operations 4 th Steering Committee Meeting COSCAP-North Asia 2, 3 March 2005, Shanghai, PRC Captain Frank M. Hankins.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
EUROCONTROL European Organisation for the Safety of Air Navigation.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
DIRECTION TECHNIQUE CERTIFICATION Paris, April 2008 SL ASAS TN2 Workshop ppt ASAS & Business.
LECTURE 4: ICAO CHART requirements
© 2015 Noblis, Inc. Jonathan Hammer Modeling for Verification and Validation Workshop, FAA WJHTC Monte Carlo Modeling Techniques in FAA Systems Development.
COLLABORATIVE DECISION MAKING
Radar.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Arrival Charts and Procedures
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
William C. Withycombe March 14, 2012 Federal Aviation Administration Pacific Aviation Directors Workshop State of the FAA.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Vertical, lateral separations based on time / distance
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

1 Panel on New Air Traffic Control and Management Technology February 23, 2007 Regional Airport Planning Committee Panel on New Air Traffic Control and Management Technology Enablers for Capacity Gains from New Air Traffic Control and Air Navigation Technologies by Tom L. Cornell, Jr. (650)

2 Panel on New Air Traffic Control and Management Technology February 23, 2007 Bay Area Air Traffic Challenges Today n Traffic is rebounding and will exceed 2000 levels n Aircraft delays are returning n Major capacity improvements involving new runways or other large capital programs are difficult due to cost and environmental hurdles n What can technology do to enhance capacity, reduce delays, and improve safety?

3 Panel on New Air Traffic Control and Management Technology February 23, 2007 What’s the Question? n What are benefits to individual approaches/departures? –Savings in flight time fuel burn? –Reduced landing minimums? n What are benefits to multiple approaches/departures at same airport? –More simultaneous independent operations? –Increased capacity and reduced delays? n What are benefits to regional air traffic and ATC? –Reduced pilot and controller workload? –Greater utilization of secondary airports? n In short: “What do these advanced navigation systems, singly or in combination, enable us to do?”

4 Panel on New Air Traffic Control and Management Technology February 23, 2007 Technology Objectives –Providing all-weather landing capability at multiple airports –Providing conflict free transition routes to and from regional airports –Enhancing regional airport system capacity through coupled performance-based surveillance and communications systems –Maintaining visual arrival and departure rates in low- visibility conditions These technologies are potential tools for airport system planning to help achieve the objectives of:

5 Panel on New Air Traffic Control and Management Technology February 23, 2007 What Are the Technology Enablers? n Location accuracy n Pilot and controller vision n Spacing and sequencing n Workload reduction

6 Panel on New Air Traffic Control and Management Technology February 23, 2007 Location Accuracy n Do you know where you are and where everyone else is? –Area Navigation (RNAV) –Required Navigation Performance (RNP) –RNP Special Aircraft and Aircrew Authorization (SAAAR) –Automatic Dependent Surveillance-Broadcast (ADS-B) with Cockpit Display of Traffic Information (CDTI)

7 Panel on New Air Traffic Control and Management Technology February 23, 2007 Radar Flight Tracks Before & After RNAV SIDS n ATL RNAV Standard Instrument Departures n DFW (AAL) RNAV Standard Instrument Departures Source: RNAV/RNP Program Update, Federal Aviation Administration

8 Panel on New Air Traffic Control and Management Technology February 23, 2007 Departure Procedures- Before & After RNAV n Departures are vectored n Significant dispersion n Limited exit points n Departures fly RNAV tracks (not vectored) n Flight-track dispersions reduced n More efficient vertical profiles n Additional exit points available n Voice transmissions reduced (30-50%) BEFOREAFTER Source: Federal Aviation Administration

9 Panel on New Air Traffic Control and Management Technology February 23, 2007 Moving to Performance-Based Navigation Source: Federal Aviation Administration

10 Panel on New Air Traffic Control and Management Technology February 23, 2007 RNP Background – Alaska Airlines n Pioneered RNP in Alaska –To serve "terrain-challenged" airports (e.g., Juneau- Gastineau Channel ) –Exploit advanced avionics on its B ’s Source: Alaska Airlines

11 Panel on New Air Traffic Control and Management Technology February 23, 2007 First Certified Public RNP SAAAR Approach to Runway 19 at DCA n Established 9/28/05, RNP 0.11 n Previous approach minimums: 720-foot decision altitude and 2 & 1/4 mi. visibility n RNP approach minimums: 475-foot decision altitude and 1 & 1/4 mi. visibility Source: RNAV/RNP Program Update, Federal Aviation Administration

12 Panel on New Air Traffic Control and Management Technology February 23, 2007 Applications of RNP SAAAR Criteria in U.S. Source: Federal Aviation Administration

13 Panel on New Air Traffic Control and Management Technology February 23, 2007 ILS Approaches to JFK Runway 13L and ILS Approaches to LGA Runways 4 and 22

14 Panel on New Air Traffic Control and Management Technology February 23, 2007 Planned RNP SAAAR Approach to JFK Runway 13L/R Sponsored by JetBlue Airways Source: Federal Aviation Administration

15 Panel on New Air Traffic Control and Management Technology February 23, 2007 Automatic Dependent Surveillance-Broadcast (ADS-B) and Cockpit Display of Traffic Information (CDTI) n GPS-equipped airplanes constantly broadcast their current position and flight information over a dedicated radio datalink n ADS-B “out" is envisioned by FAA as replacement of older, less-accurate radar systems n ADS-B “in“ -- transmissions are received by –Air traffic control surveillance stations –Other ADS-B equipped aircraft within reception range that can display traffic on CDTI

16 Panel on New Air Traffic Control and Management Technology February 23, 2007 CDTI Support for Displaying Surrounding Traffic

17 Panel on New Air Traffic Control and Management Technology February 23, 2007 Pilot Vision n Can you see the runway environment and other traffic? –Head-Up Displays (HUD) –Head-Up Guidance Systems (HGS) –Enhanced Vision Systems (EVS) –Synthetic Vision Systems (SVS)

18 Panel on New Air Traffic Control and Management Technology February 23, 2007 Head-up Displays (HUD) / Head-up Guidance System (HGS) n Presents primary flight, navigation, and guidance information onto a transparent glass display positioned between the pilot's eye and the flight deck window –Focused at infinity –Provides for better situational awareness n Show critical information –Airspeed –Altitude –Flight path –Runway image superimposed over actual view out window n Southwest Airlines uses HUD alone to hand-fly Cat-III approaches n Designating the HUD as the primary flight display is also under consideration

19 Panel on New Air Traffic Control and Management Technology February 23, 2007 HUD / HGS for Surface Movements n Enables aircraft to takeoff in visibility conditions as low as 300 feet; normal visibility minimums are 600 feet

20 Panel on New Air Traffic Control and Management Technology February 23, 2007 Enhanced Vision System (SVS) Displays n Can display image of the airport environment, (buildings, ground vehicles, lighted and unlighted aircraft, and terrain, etc.) on head-up or a head-down display, such as a CRT or LCD n Reportedly adds some $500,000 to price of HUD

21 Panel on New Air Traffic Control and Management Technology February 23, 2007 Enhanced Vision System (EVS) Displays Enables Gulfstream 550 to fly CAT-I approach down to a decision height of 100 feet

22 Panel on New Air Traffic Control and Management Technology February 23, 2007 Synthetic Vision System Displays n Provides pilots with a realistic depiction of terrain databases and standard aircraft systems on a standard flight deck display. n SVS is primarily used on approach or takeoff during low visibility conditions, providing pilots with realistic visuals and easy-to- follow flight path guidance.

23 Panel on New Air Traffic Control and Management Technology February 23, 2007 Spacing and Sequencing n Can you maintain required aircraft spacing and sequencing of aircraft to optimize capacity? –4D Trajectories (4DT) –Controller Sequencing Aids –Autoland / Fight Management System –Downlink –4DT-based ATM Ground Station –Wake Turbulence Avoidance “Bubble” Detection technologies Airport design – using crosswinds

24 Panel on New Air Traffic Control and Management Technology February 23, 2007 Swedish Flight Trials of 4D Trajectories n SAS B FMS updated for downlinking “4D” trajectories to the runway up to an hour in advance n Will enable controllers to establish a required time of arrival (RTA) n Will allow pilots to: –Cross threshold within ±10 sec. of RTA –Conduct continuous-descent approaches (CDA) n First “green approach” flown into Stockholm’s Arlanda Airport on January 19, 2006 –Constant descent at idle power from cruise starting at 34,000 feet 22 minutes out Source: Aviation Week & Space Technology 11/07/2005, page 50  Increased situational awareness  Improved safety, capacity, and productivity  Reduced operating costs, fuel burn, and emissions  Reduced communications and workload

25 Panel on New Air Traffic Control and Management Technology February 23, 2007 It Comes Down to Industry Acceptance n Acceptance / comfort with technology n Willingness to monitor rather than active control n Pilot and controller acceptance n NATCA / ALPA / Other acceptance n Retraining and recurrent training n Risk / blunder analysis n Equipage – both aircraft and Air Traffic Control n Mixed equipage n Required performance vs. specific equipment n System integration