Critical Decision Method Case Study: B747 Disclaimer: Knowledge, Skills & Ability must known to the SME correct as at 17 Jul 08.

Slides:



Advertisements
Similar presentations
Service Gaps and Need It Now Market. Distribution Market Place Bottom Line pressures by Distributor Management Major Inventory Reductions –C and D Items.
Advertisements

Robert L. Helmreich, Ph.D. FRAes The University of Texas
Total Productive Maintenance
Prospectus about Land Rover type reconnaissance car.
Lean Six Sigma - a new approach to airport consultation and management Tony Gollin and Thomas Hyde.
HIGHER PE SWIMMING PREPERATION OF THE BODY Lecture 3.
APOLLO 13 Safety Message Bob Sieck Odyssey Spacecraft NASA Project Engineer April 1970.
Presentation to HRPA Algoma January 29, My favourite saying… Fail to plan, Plan to Fail. 2.
SYSM 6309 Advanced Requirements Engineering By: Paul Wasilewski.
Accidents: Review & Investigation Basics. It is important that you check with your Comprehensive Loss Control Coordinator, Human Resources, and Supervisor.
Business Critical Rules March 2015
Road Traffic Accident Procedures Service Delivery 2.
Machine / TA Inspections Rick Weight Cashman Mining Field Service Supervisor Brett Avery Cashman Field Service Technician.
IES 303 Chapter 4: Process Analysis Week 4 Dec 1, 2005 Objectives:
Validate Plan ABC Call © 2005 IDS Solutions Inc. All Rights Reserved Duplication for resale is illegal Version1.1 Nov06 BACK.
Chapter 6 - Total Quality Management
Airspace Resource Allocation -Operations Impact Prof. R. John Hansman, Director MIT International Center for Air Transportation
Types of Risks 1.Project risks –Impact schedule and cost –Includes budgetary, schedule, personnel, resource, customer, requirement problems 2.Technical.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
BEHAVIOR BASED SAFETY & YOU!!! PART I
Practical Energy Conservation Tips for Gas Turbine Propulsion Ships.
Copyright © 2011 Resource RTO 1 Copyright © 2011 Resources RTO 1 When things go wrong! What are the issues buried within the training systems?
Winter Operations GENEVA CASE AIRPORT OPERATIONS IN EXTREME WEATHER CONDITIONS (winter )
CHALLENGES AND OPPORTUNITIES FOR CRITICAL ANALYSIS IN ASSESSMENT.
Special Topics Introduction to Aeronautical Engineering
Chapter 1-Driving & Mobility
Workshop PRIXNET – 11/12 Mars CONGESTION PRICING IN AIR TRANSPORTATION Karine Deschinkel Laboratoire PRiSM – Université de Versailles.
Emergency Communication And Evacuation SOP# 505 Training On Demand.
Root Cause Tutorial Page 1 More on Hazard Identification Techniques 1.Identify potential hazards that could threaten the safety of your employees,
CREW RESOURCE MANAGEMENT
ASIANA AIRLINES FLIGHT 214 BY DANIEL LEE. AIRCRAFT: BOEING 777.
By Capt Ab Manan Mansor Project Paper - DFOM. Objectives & Learning Outcomes To enable students to undertake a relatively major research work related.
1 TRANSMISSION SYSTEM OVERVIEW NETWORK OPERATING COMMITTEE April 17, 2007 New Mexico Transmission System Overview.
IES 303 Engineering Management & Cost Analysis | Dr. Karndee Prichanont, SIIT 1 IES 303 Chapter 4: Process Analysis Objectives: Introduce some practical.
1 IE 590D Applied Ergonomics Lecture 26 – Ergonomics in Manufacturing & Automation Vincent G. Duffy Associate Prof. School of IE and ABE Thursday April.
OFFICE ERGONOMICS TRAINING Sue Smith BScGradDipOTMSafScMMgt.
ASIA PACIFIC Air Traffic Flow Management
1 Failures and fault classification Jørn Vatn NTNU
Lecture 2: Composition of Aircraft Weight
Transportation Tuesday TRANSPORTATION TUESDAY Are you a good driver? A question we need to ask ourselves before hitting the road.
Chapter 13 Project Management. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Define and give.
LECTURE 9 SAFETY RISK MANAGEMENT AVIATION SAFETY & SECURITY.
Route and Network Planning
Airlines and Aircraft Airline Services Airline Evaluation Airline Contracts.
COLLABORATIVE DECISION MAKING
GEN1 Fuel Mapping Overview Engine RPM Throttle Opening % Active Cell Active Cell RPM Active Cell Throttle Position Active Cell Map Compare ( See “Map Comparing”
Problems n The main problem is the congestion of traffic in the air. With the congestion come further problems, such as: –There are too few large airports.
So you want to be an… Airline Pilot. Airline Pilot Pilot and navigate the flight of multi-engine aircraft in regularly scheduled service for the transport.
 They identify the widget that broke or malfunctioned, then locate the person most closely connected with the technical failure: the engineer who miscalculated.
Simulation Modeling and Analysis Ernesto Gutierrez-Miravete Rensselaer at Hartford October 14th, 2003.
Alex Montgomery.  Fly aircraft used to transport cargo or people  Coordinate location using a variety of different gauges and tools and relay that information.
 Our system supplies the data and manuals that an airline needs to fly -- at the maximum levels of safety, security, and efficiency -- based on The system.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Hazard Identification & Safety Risk Management.  Hazard Identification and safety risk management (SRM) are the core process in the management of safety.
Mr. Lagomarsino Money Power with Technology Applications.
1 Important Factors in My Landing As suggested by Ed Schultz, I responded back their requirements with bullets of my experience. At first I thought I had.
Continuous Quality Improvement: Our Desired State The Vision for Continuous Quality Improvement (CQI)
Supervisor’s Guide for Employees in Professional Series
Transportation, Distribution, & Logistics Careers
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
PIONEER CEMENT PROJECT BEHAVIOR BASED SAFETY !!!.
Air Carrier Continuing Analysis and Surveillance System (CASS)
Fans & Heaters technical seminar
UA Road Transport Safety Forum Hazard & Effects Management Program
Chapter 4: Job Design and Job Analysis
RISK ANALYSIS Resource Documents
BEHAVIOR BASED SAFETY & YOU!!! PART I
Science of Helicopters
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Presentation transcript:

Critical Decision Method Case Study: B747 Disclaimer: Knowledge, Skills & Ability must known to the SME correct as at 17 Jul 08

Sweep 1: Identifying and selecting incidents Sweep 2: Timeline verification and decision point identification  Location: Korea  Weather: Winter  Time: Dec 2007 morning  Event: During push-back, B-747 flight back to Singapore, engine unable to start.  Cause of Defects: Starter unable to rotate  Decision Point 1: 30 mins to departure -  Option 1: Technical Flight delay (involving 400 pax, 3-hr down-time, spares may not be available)  Option 2: Use 1xair-blower to melt the ice (adopted)  Decision Point 2: 20 mins to departure –  Realized ice was melting slowing:  Option 3: Revert to Option 1 - Technical Flight delay (involving 400 pax, 3-hr down-time, spares may not be available)  Option 4: Use hammer to break the ice (adopted)  Decision Point 3: 15 mins to departure –  Observation: Bits of ice were “dropping off” : Hopeful…  Option 5: Blew ground air unit to maximum speed to drive the rotor  Observation: Starter unit came to live  Outcomes: Able to start the engine & departure as per schedule  Option 6: Call for immediate Technical Flight delay Critical Decision Method:B747

Sweep 3: Progressive Deepening (the story behind the story)  Perceptions:  If delay: SME “kena” – passengers complained, supervisors demanded explanation/report, admin loading to the ground crew, …  No logistic spares  Nature Instinct: Make good/rectify faults as the engine just need to start  Expectations:  Must NOT cause any damage to the rotor  To start the engine without causing flight delays  Judgements: Safety NOT an issue -  Usage of Air Blower – SME observed that the ice was catching the rotor and there was no point to change the rotor  Usage of Hammer – SME opined that hammer will create the vibrations with calibrated knocks to loosen the ice. Knocking must be near to the rotor (approximately 2” from the rotor blade)  Goals:  Start the engine by all means: no flight delays  Uncertainties:  Usage of Air Blower & Hammer – Not proven methodology & Not in the Manuals  Concerns:  Answerable to Stakeholders (Branding: Top Airlines in the World) Critical Decision Method: B747

Sweep 4: “What if?”: – Case 1: Ice not breaking up Continued blowing hot air to increase temperature to melt the ice – Case 2: Hammer calibrated wrongly & broke rotor Activated Technical Flight Delay – Case 3: If novice was in charge, how? Refer to Manual & delay flight – Case 4: If the time has been different, how? Longer Time – Monitor & wait for the ice to melt – Use Air Blower to blow longer – Will NOT use hammer Shorter Time – If Ice is melting, will increase temperature and delay the flight slightly – If Ice is NOT melting, will declare Technical Flight Delay – Case 5: What training will have to offer an advantage? Basic principles of working components – Case 6: What knowledge, information or tools could have helped? Availability of spares Know where to pull items from other operators Critical Decision Method: B747