1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 ) 2008.01.19.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
ISTISNA’.
Contracts – important issues
Cargo Direct International
I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17 th Contracting Squadron 1 Termination of Commercial Contracts.
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
22 Lloyd’s Salvage Agreement LOF
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
LECTURE 7 CLAIMS RELATED TO SUB-CONTRACTORS
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Default and Enforcement. 2 Enforcement: Cumulative Remedies Proceed under non-UCC law, and satisfy a judgment out of almost any asset the Debtor owns;
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
1 How to Write an Incremental Funding Modification Sarah Echt May 2004.
WHAT’S NEW IN HOTEL CONTRACTS
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS. FIDIC MEASUREMENT AND EVALUATION CHAPTER 20 SECTIONS 20.5 TO 20.8.
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
The Islamic University of Gaza Engineering Faculty
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Basic Financial Requirements for DoD Government Contracting 2015 National SBIR/STTR Conference The views expressed in this presentation are DCAA's views.
An Act of Parliament to provide for compensation to employees for work related injuries and diseases contracted in the course of their employment and for.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
INTERNATIONAL SALES LAW - seminar 2004 ISL Contractual Risk Management in Transnational Sales Transactions ISL: objectives, functions and structure Management.
Contract price & payment
Mikael Wahlgren NCC Construction Sverige AB ESCL Conference August 25th 2006 – Risk in Construction and how to deal with them. Duty for the contractor.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Service Tax Voluntary Compliance Encouragement Scheme, 2013 [Chapter VI of Finance Act, 2013] Amnesty Scheme – Updated with Department Clarification.
FIDIC Conditions of Contract for Construction
The Building and Construction Industry Security of Payment Act 2002 (Vic) made simple Western Suburbs Law Association Tuesday 4 June 2013 Michael Heaton.
Contract Review.  1. The final step in the vendor contracting process should be getting the vendor’s standard written contract and signing the contract.
AN INTRODUCTION TO FIDIC CONDITIONS OF CONTRACT PART (I) FOR E. P. C
Copyright© JSE Limited ROLLING OF SETTLEMENT AND FAILED TRADE PROCEDURES Brett Kotze Clearing & Settlement Division 05 August 2008.
Compensation events and claims Presented by Prof. Khem Dallakoti.
1 Analyisis application Incoterms EXW – Ex Works General notes  The seller delivers the goods at the moment that he places the goods at the disposal.
FAR Part 31 Contract Cost Principles and Procedures.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
1 A decade of revisions at UNCITRAL Special Course 6 – James Castello Lecture 5 Arbitration Academy PA R I S SUMMER COURSES
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
ENGINEER Engineer Duties: Carry out the duties assigned in the contract.Carry out the duties assigned in the contract. Engineer's staff shall include qualified.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Chapter 38 Agency Twomey, Business Law and the Regulatory Environment (14th Ed.)
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
1 Unification of contract law and Russian law ICC documents.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Presented to: By: Date: Federal Aviation Administration Ready for Cost Type Contracts - Accounting Systems and Administration Small Business Vendor Day.
Construction Contracts Act, Adjudication & Payment Claims Conference 2016 The Right to Suspend Work Explained Lydia B. Bunni BL Wednesday 28 th September.
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Particular Conditions of Contract & Appendix to Tender
Drawings Introduction to FIDIC - Drawings -.
Administration of a FIDIC Contract - Financial Management
Administration of a FIDIC Contract - Award to Commencement -
Particular Conditions of Contract & Appendix to Tender
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
ارائه دهنده : آمنه هادی پور
THE EMPLOYER Right, of access to the site.
Construction Contract Administration Presentation of chapter four at FIDIC ( The Contractor ) Prepared By : Jomah M. AL-Najjar Instructor : Dr. Kamalain.
Public works contract Clauses 10.5 & 11.5 Explored
Construction Contract Administration
Presentation transcript:

1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )

Procedure for Test after Completion 12.2 Delayed Tests 12.3 Retesting 12.4 Failure to Pass Test after Completion 12.1 Procedure for Test after Completion 12.2 Delayed Tests 12.3 Retesting 12.4 Failure to Pass Test after Completion CHAPTER 16 TEST AFTER COMPLETION

Procedure for Test after Completion(1/2)  If Test after Completion are specified in the Contract, this Clause shall apply. Unless otherwise stated in the Particular Conditions: a) the Employer shall provide all electricity,fuel and materials, and make the Employer’s Personnel and Plant available b) the Contractor shall provide any other plant, equipment and suitably qualified and experienced staff, as are necessary to carry out the Test after Completion efficiently; c) the Contractor shall carry out the Test after Completion in the presence of such Employer’s and/or Contractor’s Personnel as either Party may reasonably request.

Procedure for Test after Completion(2/2)  The Test after Completion shall be carried out as soon as is reasonably practicable after the Works or Section have been taken over by the Employer. The Employer shall give to the Contractor 21 days’ notice of the date after which the Test after Completion will be carried out. Unless otherwise agreed, these Tests shall be carried out within 14 days after this date, on the day or days determined by the Employer.  The results of the Test after Completion shall be complied and evaluated by the Contractor, who shall prepare a detailed report. Appropriate account shall be taken of the effect of the Employer’s prior use of the work.

Delayed Tests  If the Contractor incurs Cost as a result of any unreasonable delay by the Employer to the Test after Completion, the Contractor shall (i) give notice to the Employer and (i) give notice to the Employer and (ii) be entitled subject to Sub-Clause 20.1 [Contractor’s Claims] to payment of any such Cost plus reasonable profit, which shall be added to the Contract Price. (ii) be entitled subject to Sub-Clause 20.1 [Contractor’s Claims] to payment of any such Cost plus reasonable profit, which shall be added to the Contract Price.  After receiving this notice, the Employer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this Cost and profit.  If, for reasons not attributable to the Contractor, a Test after Completion on the Works or any Section cannot be completed during the Defects Notification Period( or any other period agreed upon by both Parties), then the Works or Section shall be deemed to have passed this Test after Completion.

Retesting  If the Works, or a Section, fail to pass the Test after Completion: a) sub-paragraph (b) of Sub-Clause 11.1 [Completion of Outstanding Work and Remedying of Defects] shall apply, and b) either Party may then require the failed Test, and the Tests after Completion on any related work, to be repeated under the same terms and conditions.  If and to the extent that this failure and retesting are attributable to any of the matters listed in sub-paragraphs (a) to (d) of Sub- Clause 11.2 [Cost of Remedying Defects] and cause the Employer to incur additional costs, the Contractor shall subject to Sub-Clause 2.5 [Employer’s Claims] pay these costs to the Employer.

Failure to Pass Test after Completion(1/3)  If the following conditions apply, namely: a) the Works, or a Section, fail to pass any or all of the Tests after Completion, b) the relevant sum payable as non-performance damages for this failure is stated ( or its method of calculation is defined) in the Contract, and c) the Contractor pays this relevant sum to the Employer during the Defects Notification Period, then the Works, or a Section shall be deemed to have passed these Tests after Completion. then the Works, or a Section shall be deemed to have passed these Tests after Completion.

Failure to Pass Test after Completion(2/3)  If the Works, or a Section, fail to pass a Test after Completion and the Contractor proposes to make adjustments or modifications to the Works or such Section, the Contractor may be instructed by (or on behalf of) the Employer that right of access to the Works or Section cannot be given until a time that is convenient to the Employer.  The Contractor shall then remain liable to carry out the adjustments or modification and to satisfy this Test, within a reasonable period of receiving notice by (or on behalf of) the Employer of the time that is convenient to the Employer.  However, if the contractor does not receive this notice during the relevant Defects Notification Period, the Contractor shall be relieved of this obligation and the Works or Section (as the case may be) shall be deemed to have passed this Test after Completion.

Failure to Pass Test after Completion(3/3)  If the Contract incurs additional Cost as a result of any unreasonable delay by the Employer in permitting access to the Works or Plant by the Contractor, either to investigate the causes of a failure to pass a Test after Completion or to carry out any adjustments or modifications, the Contractor shall (i) give notice to the Employer and (ii) be entitled subject to Sub-Clause 20.1 [Contractor’s Claims] to payment of any such Cost plus reasonable profit, which shall added to the Contract Price. After receiving this notice, the Employer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this Cost and Profit. After receiving this notice, the Employer shall proceed in accordance with Sub-Clause 3.5 [Determinations] to agree or determine this Cost and Profit.

10 Figure 16.1 Tests after completion under the FIDIC Silver Book C carries out tests after completion as soon as reasonably practicable after taking over: - upon 21 days’ notice from E of date after which tests maybe carried out,and - within 14 days of the notified date, unless otherwise agree (12.1) C entitled to payment of costs incurred plus reasonable profit (12.2) Does E unreasonably delay the tests after completion? Are the tests carried out during the defects notification Period? YES NO Do the works or section pass the tests after completion? C still obligated to carry out tests after completion. Is the reason attributable to C? NO YES YES NO NO YES YES

11 Does either party require retesting?(12.3) YES NO C obligated to remedy defects in order to pass tests (12.3) NO YES YES NO NO YES Has C paid relevant non-performance damages for this failure?(12.4) Works or section deemed to have passed tests after completion (12.2). C pays E’s costs if C responsible under contract for cost of remedying defect causing test failure (12.3). Tests after completioncompleted. Results of the tests after completion complied and evaluated by C, who prepare a detailed report, taking into account the effect of any prior use of the works by E (12.1).

12 簡報結束敬請指教 Test after Completion