RADWG 6 TH - 2013 13 TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)

Slides:



Advertisements
Similar presentations
Chamonix 2010: January 27 th Session 6 – Radiation To Electronics: R2E Summary Radiation 2 Electronics Session th January 2010 Radiations to Electronics.
Advertisements

FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
Optical Fibre Dosimetry First Thoughts. Goal Target Measuring dose in a distributed way using optical fibres (“active”) Constraints: – Mixed-Radiation.
TE-MPE-TM 09/08/2012, TE-MPE-MS section WIC: Overview of on-going projects + Outlook to LS1 activities: - Short introduction to WIC systems - Booster renovation.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
J. MEKKI (1/14) 05/12/12 – RadWG meeting Summary of the radiation levels of the equipments at CNRAD RF MosFETs Cryogenics TE/EPC LED warning system BPM.
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Radiation test - PSI Date Equipment Owner Test groupDUT May 20th EN/STI OSL, TLD BE/BI Detector June 1stTE/EPCEN/STI Mosfet Voltage regulators Voltage.
RADWG 2 ND TH MARCH 2012 G. Spiezia (EN/STI/ECE)
RADWG 6 TH TH OCTOBER 2012 G. Spiezia (EN/STI/ECE)
J. MEKKI (1/6) 15/03/11 – RadWG meeting CNRAD installation summary Key dates Installation have been performed from 2 nd to 4 th of March. CNGS setup with.
Barriere O, Le Roux P
Injector De-cabling Project Project Team Meeting #
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Fraunhofer Test-Campaigns March 25 th 2013 (R2E) Mitigation Project: RadWG March 25 th 2013 FRAUNHOFER Test-Campaigns & Facilities M. Brugger.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
A&T Radiation Test Procedure RadWG Meeting November 14 th 2013 CERN R2E Project RadWG Meeting November 14 th 2013 Update on Fraunhofer Tests M. Brugger.
(1/8) J. Mekki RadWG meeting – 03/02/2015 CHARM facility update 03/02/2015.
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
The FGClite Project Status Update and Requirements R2E Extended Project meeting TE-EPC-CC R2E Team.
K. Foraz & Perrot A. L., EN/MEF - R2E Project LMC 25th May 2011 Thanks to EN/EL, EN/HE, EN/MEF, equipment owners the LHC integration team & the R2E team.
RADWG 4 TH TH JULY 2012 G. Spiezia (EN/STI/ECE)
TRIUMF and ISIS Test Facilities Radiation 2 Electronics (R2E) LHC Activities TRIUMF and ISIS test facilities Rubén García Alía, Salvatore Danzeca, Adam.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
J. MEKKI (1/8) 06/03/12 – RadWG meeting CNRAD plan Beam schedule – 1 st Slot Overall beam schedule for 2012 Equipments to be installed o Higher flux locations.
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
Radiation monitoring: what do we have and what do we need? M. Calviani, M. Brugger, P. Peronnard, J. Saraiva, G. Spiezia (EN/STI) R2E/Availability Workshop.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
H4IRRAD 2012 M. Calviani (EN/STI) for H4IRRAD team.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC Calendar for 2004   March   May   30 June -1 July  
R2E Workshop Preparations RadWG Meeting March 25 th.
RADWG Meeting April 2015 Salvatore Danzeca EN/STI/ECE.
BA6 newsRF power Cable list being worked out. BA6 newsLLRF Cable list done, pending check and confirmation.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
Follow-Ups and Project Structure R2E Meeting September 8th Project / Study Group / RadWG R2E Mitigation Project:  Responsible of development and implementation.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
New Irradiation Test Facility : CHARM June 10 th 2014 CERN R2E project CHARM Introduction June 10 th 2014 New CERN Irradiation facility : CHARM !!! Many.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Planning and strategy for HL-LHC R2E
R2E-MD preliminary report – 3rd/4th July th July LSWG meeting
CHARM facility update 23/04/2015
AFC 2017 (and 2018) AFC timeline:
CERN/SSC Technology Transfer Day
Cryo equipment strategy in the R2E context
Feedback on two irradiation testing projects Emergency lights and TETRA system Elisa Guillermain
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
RADMON Salvatore Danzeca (EN/STI) on behalf of the R2E Project and RADMON team Thanks to all the RADMON Team!
6th WorldFIP Insourcing Meeting
CNRAD dosimetry and Summary of the TS
Ongoing BE-BI developments going to be exposed to radiation
Collimator Control (SEUs & R2E Outlook)
RADIATION induced failures in LHC 28th June 2011
MICROFIP-Do we need further tests? 28th June 2011
RADWG Meeting February 2017
Radiation Working Group RADWG
Presentation transcript:

RADWG 6 TH TH NOVEMBER 2013 G. Spiezia (EN/STI/ECE)

AGENDA  Matters arising  Memorandum for the rad test  Update on Fraunhofer test  Update on CHARM  Rad test results from Cryo

PSI test – Done Date Equipment Owner Test groupDUT February EN/STI-BE/BIEN/STI, BE/BICypress memory, potentiometer, Samsung, BLM 24-Feb TE Switches March BE CO NanoFip March TE/EPC, EN/STIEN/STIVoltage reg, Voltage ref, Mux, Amplifier April TE/EPC TE/EPC, EN/STI ADC, SRAM for latch-up study May TE/EPC, EN/STIEN/STILM45, Oscillator, Current source, SRAM 25 Jun TE/EPC, EN/STI ADC ADS JuneTE/EPC,EN/STIEN/STI Analog switch, Mosfets, Amplifiers, LVDT conditioner JulyTE/CRG Components for beam screen heaters

PSI test Date Equipment Owner Test groupDUT September EN/STI, TE/EPC EN/STIVoltage reg, Amplifiers, Isolated regulator, Transceiver (05)-06 October TE/ EPC EN/STI TE/ EPC EN/STI ADC test (SEL study) - (R. Garcia Alia, S. Uznanski) OctoberTE/EPC FGC lite (S. Uznanski) October EN/STI TE/EPC EN/STIRadMon, Thermocouple board, FG, SRAM 1-3 November TE/CRG QPS TE/CRG QPS Heater board (N. Trikoupis) Components for QPS (J. Steckert) (23)-24 November TE/EPC, EN/STI EN/STIADC, Trigger Schmitt, Amplifier, ADC, BJT December QPS PH QPS PH Components for QPS (depend on the previous results) (J. Steckert) ASIC test (F. Anghinolfi)  sts/2013_PSI.htm sts/2013_PSI.htm

CEA Date Equipment Owner Test groupDUT AprilEN/STI Components, Pin diodes 14-May BE/BI, IT, EN/EL, PH/ESE passive Diode, Beacon, LED, Silicon chip 10 SeptemberPHpassiveExperiment devices 25 OctoberEN/ELPassiveLED block  Transport of the irradiated material still to be finalized  Material will be sent to 867  IT beacon  Diodes for BLM  Light EN/EL  Request for 2014  3 slots have been asked

Conferences  AMICSA  Workshop organized by ESA with CERN collaboration  ASICS and mixed signal components  Talks from industries  30 June-1 July 2014  # #  NSREC Paris  Combined with RADECS  July  details on the call for papers and the short course program  A talk of the short course will be given by Markus on: Radiation test challenges in accelerator mixed beam environments

Test Guidelines  JEDEC standard for SEE  Guidelines on requirements, procedures and report for 40 to 500 MeV proton irradiation of electronic devices for Single Event Effects (SEE), and reporting the results.  RADWG web site EDMS project link  Documentation  Guidelines  :V0/P:CERN :V0/TAB :V0/P:CERN :V0/TAB3

Status of projects with R2E concerns  Last meeting, the list of the projects with R2E concerns was presented  For the follow-up reviews are organized  The next will be on the on-going and furutre development for the Beam Instrumentation equipment 

Workshop for activated electronic boards  Access control system in function as of 18 November  Use of PAD and MAD  Access procedure edms no edms no

Back-up

Status of various projects  Follow up from CNRAD test (J. Mekki), H4IRRAD test (M. Calviani) and TID measurement requests on Equipment under testLocationStatus BPM- BE/BI/QP (C. DePlano, J. L. Gonzalez) SPS tunnel rad test postponed. Priority on installation Beam Profile- BE/BI/PM ( J. Focker)PS, LINACrad test at Fraunhofer (to be done) GEM,XWCA - BE/BI/EA(J. Spangaard)TT83 SEU on the FPGA. Status not known MosFETs for the PSB, BE/RF/IS (M. Paoluzzi) PS BoosterTest at Jparc Control PSB Dump, EN/CV, EN/STI (G. Mason, A. Morvillo) PSB Dump Test at PSI to be done. CV equipment ok Interlock TE/MPE (P. Dahlen)SPS Measurement of TID at SPS. Status not known Actuators, EN-MME-ES (K. Artoos)CLICTest at H4. Status not known

Status of various projects Equipment under testLocationStatus QPS, TE/MPE/EP (R. Denz, J. Steckert) LHC tunnel Test at PSI and Fraunhofer Power converter TE/EPC (Y. Thurel)LHC Replacement of the AC/DC converter Component test on going Power converter-FGC Lite (A. Dinius)LHCPrototype test to be done Cryo - Beam screen heaters, TE/CRG (N. Trikoupis) LHC tunnel Component testing ok. Full board to be tested LED Warning system, EN/EL/BT (J. M. Foray)LHC tunnel, PS, SPS CNRAD test OK. Test at CEA (To be checked) Ethernet switch, IT/CSLHC (shielded areas)installation only in safe area Wifi Access point, IT/CS LHC(Tunnel or shielded areas) installation only in safe area (no information on the results) Survey Equipment, BE/ABP/SU (Mateusz Sosin) LHC shielded areas- Point 2 and 5 Test at Fraunhofer IT beacons, IT/CS/CS (A. G. Molero) LHC tunnel SPS tunnel Problem for location at high dose, Test on going at CEA and Fraunhofer PLC EN/ICE (J. Ortola Vidal)LHC Shielded areasTested. Results not known DerivFIP, BE/CO/FE (J. Palluel) LHC tunnel and shielded area Tested Beam Loss Monitor, BE/BI/BL, (E. Del Busto)LHC tunnelTested NanoFip BE/CO, (E. Gousiou)LHC tunnel Tested; FieldDrive to tested at Fraunhofer

Fraunhofer institute - Germany  All the information and the news are on the web: raunhoferRadTests/WebHome raunhoferRadTests/WebHome

Test reports  Share the knowledge of the tested components  Reports are on EDMS  Add your own reports (PSI, CNRAD, H4IRRAD)  Many tested components are useful for other groups  Table of the tested components  reports/Radiation_report_menu.htm reports/Radiation_report_menu.htm

Passive dosimetry along 2012  Used RadFets and BatMons (battery version of the RadMon)  Removed from the machines  Results given for the following areas  TT83 (requested by Spanggaard)  TT2 (requested by BE/ABP, S. Gilardoni)  PSB Dump (requested by Calviani)  Door 352 (requested by RAMSES, M. Pangallo)  LINAC3 (requested by M. Calviani)  PS (requested by RF, M. Paoluzzi)  SPS (requested by BE/BI, J Gonzalez)  SPS (requested by TE/MPE, P. Dahlen)  ATLAS-LAR (requested by Luis Hervas)

Conferences  SEE symposium  # #  NSREC   RADECS 

CERN facilities  CNRAD and H4IRRAD  East area

Technical stop