LNF Scientific Committee, October 28th 1 Paola Gianotti LNF.

Slides:



Advertisements
Similar presentations
FINUDA TRIGGER FINUDA Collaboration Meeting Trieste, May Simonetta Marcello - Torino Paola Gianotti - LNF Fulvio Pompili - LNF Aldo Zenoni (MC)
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
sTGC for ATLAS Small Wheel upgrade
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Status Update on Mechanical Prototype in Rome November 6,
Beamline Takashi Kobayashi 1 Global Analysis Meeting Nov. 29, 2007.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
JT: 1 The Berkeley Lab STAR TPC Distortions in the Transverse Plane: An Update Jim Thomas.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Experimental Setup of the H8-RD22 Experiment Massimiliano Fiorini (on behalf of the H8-RD22 Collaboration) University of Ferrara – INFN Ferrara CARE HHH.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
STAR Collaboration Meeting Rene Bellwied – Wayne State University July 2004 SVT Calibration and STI tracking status An update of work since the SVT review.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Tevatron II: the world’s highest energy collider What’s new?  Data will be collected from 5 to 15 fb -1 at  s=1.96 TeV  Instantaneous luminosity will.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
1 ENH1 Detector Integration Meeting 18/6/2015 D.Autiero (IPNL) WA105:  Detector installation requirements  Detector racks and power requirements Note:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
F.Murtas1 LUMI GEM Bremsstrahlung Dafne Bhabha Dafne Upgrade.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
DA  NE-2 plans for the study of Nucleon Form Factors Marco Mirazita INFN Laboratori Nazionali di Frascati Workshop on Nucleon Form Factors Frascati,
Status of the TOTEM Experiment and Latest Results
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Nevio Grion- – LNF Scientific Committee, Frascati, May 29 th, 2003.
NBI2006 Starting OPERA data-taking with the CNGS beam D.Autiero IN2P3/IPN Lyon 5/9/2006.
Alignment Challenge at LHCb Steven Blusk Syracuse University LHC Alignment Workshop, Aug 3-5, 2006.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
Experimental Method: 2 independent detectors on both sides of IP
FCAL R&D towards a prototype of very compact calorimeter
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
First …. Hyper-meeting Who we are? (alphabetical order)
Layout of Detectors for CLIC
LumiCal mechanical design, integration with LDC and laser alignment
Integration and alignment of ATLAS SCT
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
LHCf – CSN1 Trieste O. Adriani
KLOE General Meeting - LNF March,
HPS Collaboration meeting, JLAB, Nov 16, 2016
Mini Tower Preliminary Results
(On Behalf of CMS Muon Group)
Experimental Method: 2 independent detectors on both sides of IP
as a prototype for Super c-tau factory
Presentation transcript:

LNF Scientific Committee, October 28th 1 Paola Gianotti LNF

LNF Scientific Committee, October 28th 2 Outlook Where we are since last committee… Detector installation progress Detector debug Targets preparation Online software/hardware upgrades Online luminosity monitor Micro-strips alignment procedure Where we plan to arrive till next committee… Magnet work in progress Central detectors installation plans Detector debug Cosmic rays tests Where we are since last committee… Detector installation progress Detector debug Targets preparation Online software/hardware upgrades Online luminosity monitor Micro-strips alignment procedure Where we plan to arrive till next committee… Magnet work in progress Central detectors installation plans Detector debug Cosmic rays tests

LNF Scientific Committee, October 28th 3 Where we were… During last committee (May 18 th ) the mechanical frame that houses FINUDA detectors, “CLESSIDRA”, was brought into the DA  NE hall To gain some time on the schedule the “CLESSIDRA” was also inserted inside the magnet (May 19 th )

LNF Scientific Committee, October 28th 4 Work done during the August shutdown ( 30/7  3/9 ) “Clessidra” alignment inside the magnet Piping and cabling detectors-FEE racks (ST, outer LMDC, TOFONE) Detector checkout & debug started (ST, outer LMDC, TOFONE) Begin of He-bag piping Slow control & safety systems installation TRIGGER cabling & debug New DAQ installation & debug

LNF Scientific Committee, October 28th 5 1.“Clessidra” has been aligned to the iron yoke to be planar (x-z plane horizontal) 2.The axis has been aligned to that of the cryostat. 3.The center of the “Clessidra” has been moved along z to be centered to have the same distance from the 2 end-caps The precision obtained on the x-z plane is 0.01degrees The precision obtained on the z axis alignement is 0.5 mm “Clessidra” has been aligned using a laser tracker (Leica LTD500)

LNF Scientific Committee, October 28th 6 e  side e  side

LNF Scientific Committee, October 28th 7 New DAQ system CPUCPU CorboCorbo VIC8250VIC8250 GTS CPUCPU CorboCorbo VIC8250VIC8250 TOF CPUCPU CorboCorbo VIC8250VIC8250 LMD CPUCPU CorboCorbo VIC8250VIC8250 STB CPUCPU CorboCorbo VIC8250VIC8250 ISIM OSIM PVICdiff BUS for data stream Run Control + GEB+ Storage VME crates Ethernet for command transmission and event monitoring CPUCPU CorboCorbo VIC8250VIC8250 PVICoptical connection for data stream COUNTING ROOM DAFNE HALL

LNF Scientific Committee, October 28th 8 Monitoring scheme Run Control PC Global monitor Event Display Single detector monitor Slow Control

LNF Scientific Committee, October 28th 9 Performance of the new DAQ system Active Detectors: TOF GTS Tot. buffer size: 1 kB Trigger rateDAQ rate MB/s [Hz] [Hz] Active Detectors: TOF GTS Tot. buffer size: 1 kB Trigger rateDAQ rate MB/s [Hz] [Hz] Active Detectors: TOF GTS Tot. buffer size: 2 kB Trigger rateDAQ rate MB/s [Hz] [Hz] Active Detectors: TOF GTS Tot. buffer size: 2 kB Trigger rateDAQ rate MB/s [Hz] [Hz] Active Detectors: TOF GTS LMD STB Tot. buffer size: 4 kB Trigger rateDAQ rateMB/s [Hz] [Hz] Active Detectors: TOF GTS LMD STB Tot. buffer size: 4 kB Trigger rateDAQ rateMB/s [Hz] [Hz]

LNF Scientific Committee, October 28th 10 Online luminosity monitor I With MC studies we have defined the Bhabha events topology: imult: ITOF mult = 2; back: back-to-back ITOF topology ; emult: ETOF mult 2  4; energy: small  E inside ITOF; tof:  t betweeen ETOF and ITOF 4.5  6.5 ns; x y 10 cm cutBhabhaK + KK s K l Touschek none imult back emult tof energy acceptance <1.9·10 -7 

LNF Scientific Committee, October 28th 11 Online luminosity monitor II 5  Bhabha = 810 nb for 45 o <  <135 o MC Bhabha trigger efficiency ~ L = 5·10 31 Bhabha trigger rate ~ 30Hz If Bhabha reconstruction efficiency 1 ~ 15’ to to give L 1%  Bhabha = 810 nb for 45 o <  <135 o MC Bhabha trigger efficiency ~ L = 5·10 31 Bhabha trigger rate ~ 30Hz If Bhabha reconstruction efficiency 1 ~ 15’ to to give L 1% As a cross check we can also obtain luminosity and energy values counting K  K  pairs

LNF Scientific Committee, October 28th 12 Work done during October shutdown ( 15/10  21/10 ) Test of end-caps closure Installation  -strips FEE Start of central detector cables spreading upon the magnet~2/3 He-bag piping going on Detector checkout & debug going on (ST, outer LMDC, TOFONE) TOF laser installation DAQ tests

LNF Scientific Committee, October 28th 13 Targets design Vanadium target profile Aluminum target profile Carbon target profile Lithium target profiles Silicon target profile        0.03 To decide which targets will be mounted for the first data taking, we are organizing a Workshop March 20/ together with the major theoretical experts (A. Gal, A.Ramos,…) To decide which targets will be mounted for the first data taking, we are organizing a Workshop March 20/ together with the major theoretical experts (A. Gal, A.Ramos,…)

LNF Scientific Committee, October 28th 14 Spectroscopized in coincidence First case of exclusive NM decay: a few/pb -1 Why a 6 Li target?

LNF Scientific Committee, October 28th 15 Spectroscopized d+d spectr. (  1/pb -1 if B.R.  ) p+ 3 H spectr.(0.5/ pb -1 if B.R.  )  + +n+ 3 H many events (  10 2 /pb -1 ) how distinguishable?    about 10 2 /pb -1   p  (in  coinc.) about 10/pb -1  n  (in  coinc.) a few/pb -1 4 He+  + spectr. (10 2 /pb -1 ) calibration

LNF Scientific Committee, October 28th 16 7 Li target prototype 4mm thickness Lithium is enclose in a 110  m thickness foil consisting of 3 layers: polypropylene+aluminum+polyester Lithium is enclose in a 110  m thickness foil consisting of 3 layers: polypropylene+aluminum+polyester

LNF Scientific Committee, October 28th 17 Lithium target mounted on the mechanical support

LNF Scientific Committee, October 28th 18 7 Li target prepared as manufacturing test for the final 6 Li target Drawn Li target Target obtained with melting

LNF Scientific Committee, October 28th 19 Melted Lithium inside the oven. Due to the high surface tension Lithium is not filling all the melting pot Melted Lithium inside the oven. Due to the high surface tension Lithium is not filling all the melting pot

LNF Scientific Committee, October 28th 20 A Lithium block obtained by melting is then drawn

LNF Scientific Committee, October 28th 21 Preliminary analysis: 1 telescope of 4 modules aligned with the “3D residual vectors” method convergence of parameters by using a sequential and iterative technique. Present analysis made for a stack of 4 modules, 6x4 parameters to be minimized check the distributions of residuals Aims: work out an alignment strategy for the double-sided silicon detector (VDET) test the VDET response while working at nominal conditions Aims: work out an alignment strategy for the double-sided silicon detector (VDET) test the VDET response while working at nominal conditions VERTEX DETECTOR Alignment procedure using cosmic data Data: collected ~10 6 “good” events VDET continuously working for ~3 months used 18 modules (18º±2º)C VDET in the ASTRA clean 21º-25ºC

LNF Scientific Committee, October 28th 22 Layout of the FINUDA central region 2 osim isim target tofino beam pipe telescope used in the present analysis reconstructed cosmic ray cm d

LNF Scientific Committee, October 28th 23 ndf = # events - # param  d = µm  = mrad  = mrad  r = 126 µm  z = 45 µm  = mrad 1st step Position of # 1 after the 1 st step Translation parameter: Dd Translation parameter: Dz Translation parameter: Dr Rotation parameter: 0r Rotation parameter: 0d Rotation parameter: 0z

LNF Scientific Committee, October 28th 24 2nd step  d = 2.6 µm  z = µm  r = 105 µm  = 0.1 mrad  = mrad  = mrad ndf = # events - # param … final step Translation parameter: Dd Translation parameter: Dz Translation parameter: Dr Rotation parameter: 0r Rotation parameter: 0d Rotation parameter: 0z

LNF Scientific Committee, October 28th 25 Results:  int : pitch/  12 = =  2  int +   mscat +  2 sag … to be analyzed and corrected average efficiency (1234/123) of a single module > 97% in the active region = 59.9  0.6µm Assessed time scale: ~ tracks required ~ 4 Hz of cosmic ray crossing TOFINO rate of 5678 tracks / all tracks ~  ~2 weeks of cosmic rays data taking d [um] z ~ 30 µm d ~ 15 µm = 36.9  0.3µm Stand. dev. of residues along d Stand. dev. of residues along Z

LNF Scientific Committee, October 28th 26 Work plans for January shutdown ( 02/02  17/02? ) Reconnection of the magnet to the Cryogenic line Magnet cooling down (~12 days after Kloe cooling) ITOF mounting & test; installation of few microstrips Inner LMDC insertion He Bag installation going on End-caps closure Magnet switching on Finuda foresees about 6 weeks of DAFNE shutdown starting from January 2 nd

LNF Scientific Committee, October 28th 27 January shutdown details I

LNF Scientific Committee, October 28th 28 January shutdown details II

LNF Scientific Committee, October 28th 29 Conclusions Up to now FINUDA installation is going on without particular problems. Good cooperation with A.D. Detectors installation & debug is our priority, but we are also preparing all the tools for running (targets, DAQ, Monitors, alignment procedure…) We are working in connection with the best theoreticians of the field to select the best set of targets [ ] Cosmic rays tests are foreseen starting from March Detector will be ready for roll-in by summer 2002