Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.

Slides:



Advertisements
Similar presentations
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Advertisements

DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
ODOT- Office of Environmental Services. Every ODOT project has the potential to create an impact on the public. The public relies on our transportation.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
What is a Feasibility Study (FS) and an Alternative Evaluation Report (AER)? ENVIRONMENTAL UPDATE MEETING NOVEMBER 20, 2014 HEATHER MCCOLEMAN OES MAJOR.
The Building Blocks of Public Involvement Presented By Kevin E. Davis Environmental Supervisor ODOT Office Of Environmental Services The Ohio Planning.
Scoping in the EIA process Proposal Identification Screening
NEPA ASSUMPTION SURFACE TRANSPORTATION PROJECT DELIVERY PROGRAM.
Project Prospectus and Design Acceptance Package ( and a little more) Alan Lively Project Delivery Specialist January 30, 2009.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Environmental Assessment Public Meeting
ODOT’s New PI Manual Kevin E. Davis Environmental Supervisor Office of Environmental Services.
Federal Transit Administration New Starts Project Development Process
Overview of the Federal Aid Process for Transportation Projects.
Environmental Justice: Policies, Guidance, and Answers to Frequently Asked Questions FTA Region VII Civil Rights Training.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
WETLANDS and ODOT Environmental Services Oregon Department of Transportation.
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Project Development Process November 28, 2011.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
WETLANDS and LOCAL PROGRAMS Environmental Services Oregon Department of Transportation.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
I Larry Heil, FHWA October 15, 2003 Environmental Streamlining.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
ENVIRONMENTAL JUSTICE: FROM PLANNING TO PROJECT Ohio Planning Conference July 16, 2014.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
The PDP and Decision-Making
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Locally Administered Federal-Aid Project Initiation Workshop Prospectus Part 3 and NEPA Requirements Presenter: Howard Postovit; ODOT Region 5 Region Environmental.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Public Involvement. Why? Who Cares? –What we do matters to the public –Effective PI enables proactive input and enhances the decision- making process.
Project Development Process. ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make.
Proposition 1 Workshop: the Grant Application Process July 2015.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
PDP & Construction. Construction Reviews Preliminary Engineering – PM Discretion Construction Review Items Construction schedule Access Construction limits.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
Metro Atlanta Project Delivery Task Force Overview GAMPO Annual Work Session October 29-30, 2015.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
PURPOSE & NEED Categorical Exclusion Training Class.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Developing a Public Involvement Plan Why Develop a PI Plan? PI Plan Format Public Involvement Training Class – Presented by the Office of Environmental.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
PROJECT CONTROL Project Control Defined Types of Control Systems
Municipal Class Environmental Assessment
FOR LOCAL AGENCY FEDERAL AID PROJECTS
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
FOR LOCAL AGENCY FEDERAL AID PROJECTS
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Controlling Project Cost and Schedule
Environmental Commitments
White Flint North Entrance Feasibility Study
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

Project Development Process

ODOT’ PDP A project management and transportation decision-making tool. Developing the detail to the level necessary to make the right decision. PDP focus is: –Streamlining –Merger of Environmental/Design –Risk Management –Flexibility

ODOT’s Process

ODOT has 5 project paths (1=easy, 4/5= ODOT’s most complicated projects) Each path advances through five phases Studies/engineering are “right-sized” within each phase to better support decision-making

PDP Project Paths

ODOT’s Process Vast majority of ODOT projects are Path 1 and Path 2 projects –Most completed in-house Majority of Consultant program is Path 3 and some Path 2 projects ODOT has less then 20 projects that are Path 4 or 5

Planning (PL)

Planning your project… Planning/programming High level planning and development Data gathering and analysis Statewide Transportation Plan (STIP)

Project Initiation Package Why “active” Scoping? Define Study area and Logical Termini Define PDP Path –Discipline Specific focus areas of the PIP Design Traffic/safety/etc. Geotechnical Environmental ROW/Utilities (start planning for…) Review/Approval

Purpose and Need Focus on an understanding of the issues that will need addressed by this project –Crash Analysis –Traffic Data –Can have secondary goals (economic development opportunities, bike/ped accommodations, etc.) P&N must have supporting data!

Concept, Scope, Budget Ensure supporting data and analysis are in place to support a P&N Identify critical information needed to make a decision on the Preferred Alternative. Identify critical path elements Establish schedule/budget Getting started…scoping…

Preliminary Engineering (PE)

PE and EE Separate, but together!!! Federal Authorizations…

Developing the Preferred Alt Goal of the PE Phase –To identify the project’s Preferred Alternative –To ensure we have a strong understanding of the impacts associated with this project –Considerations: design, utilities, ROW and construct-ability. –Defined Budget/Schedule

Feasibility Studies –First level decision document Goal is to make a decision on the preferred alternative or to narrow down the alternatives (or elements) that are focused in an Alternative Evaluation Report. Documentation of ODOT’s decision.

Feasibility Studies –Path 1 projects don’t require a FS –Format- Path 2 for projects Feasibility Study can take the form of: –Discipline specific study –Mtg minutes w/supporting studies –Feasibility Study- stand alone report –Preferred Alternative Must be based on P&N MOTAA, TSL, Safety Studies combined w/specific project info (environmental/PE)

Feasibility Studies –For Projects that are: Higher Path projects, Complex in nature, multiple alignments, public controversy, etc.… –Preferred Alternative or reduced alternatives MOTAA, TSL, Safety Studies are performed Specific project info will be used to drive the decision Feasibility Study will be a stand alone report –Discipline specific studies –Preliminary Engineering (no Stage I) –May recommend AER

Alternative Evaluation Report Second Level decision document –Builds upon the Feasibility Study Will never have an AER without an FS in place Will always have an AER with a Path 4/5 project –Purpose is to make the decision of Preferred Alt. –Detail in an AER Higher level engineering High level of Environmental ROW/Utilities/Geo-tech/, etc. Coordination

Alternative Evaluation Report AERs –Can focus on individual alignments as a whole Example: Widening project (left, right, center) as a whole project. or –Can focus on individual elements of a Preferred Alternative identified in the FS Example: Intersection elements of a widening project. –Identify Preferred, Impacts, etc. –NEPA confirmed in EE Phase

Project Management PM Tips for the PE phase: –Be flexible (level of design, level of PI, level of coordination w/other areas….) are all dependent upon the complexity and decision- making needed. –Move tasks from other areas if you need the info to address your project… Cost Estimates/Project Schedule Transition to Environmental Eng

Environmental Engineering (EE)

Environmental Engineering Goal of EE Phase: –Progress Stage 1 and Stage 2 Design –Complete outstanding environmental studies –Complete NEPA and Permit approval –Begin ROW acquisition

Environmental Engineering Environmental Studies and Approval –Can be based on PE, Stage 1 or Stage 2 –Environmental commitments Stage 2 Design Process Waterway Permits Can begin ROW/Utilities –Title/deed, etc., –acquire w/state monies, etc.

Environmental Engineering Design considerations:  Ensure design is buildable Address Temp/Perm fills How will this project be built? Ensure room for staging, de-watering, etc.  Ensure environmental commitments are addressed in the design and bid documents  Utilities are addressed…

Environmental Engineering ROW considerations –Can begin all pre-acquisition activities Deed research, Appraisals, Necessary coordination, etc. –Consider Hardships or Protected Buys

Project Management PM Tips for the EE phase: –Monitor costs/schedule closely –Map out critical path elements Start waterway permits early…. Utility relocation –Cost Estimates/Project Schedule Transition to Final Engineering

Final Engineering/ROW (FE)

Final Engineering/ROW Goal of FE Phase: –Progress ROW and Utility relocation/process –Complete Design and bid documents –Begin mitigation implementation

Final Engineering/ROW Considerations: –Environmental Commitments Ensure they are built into the design and bid documents –Ensure design is buildable: Staging Stormwater details (dewatering, etc.) Retaining wall example…

Construction (CO)

Construction Commitment Compliance Mitigation implementation Verify Design efforts –Site visit/talk w/inspectors –Ensure Maintenance is aware of issues.

Project Development Process