Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee,

Slides:



Advertisements
Similar presentations
8621 Georgia Avenue Silver Spring, MD
Advertisements

ASHA National Office Building 2011 AE Senior Thesis Ryan Dalrymple 5 th year Structural Option BAE/MAE Advisor: Dr. Thomas Boothby Photo Courtesy of Boggs.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
Kirk Stauffer BAE / MAE - Structural Option Senior Thesis Project Life Sciences Building The Pennsylvania State University University Park Campus.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Jonathan Coan AE Senior Thesis April 10, 2012 Weill Cornell Medical Research Building New York, NY Images courtesy of Ennead Architects.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Nicole C. Drabousky Pennsylvania State University Architectural Engineering Structural Option Spring 2006 Senior Thesis Presentation.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Mountain Hotel Urban Virginia Senior Thesis 2013 Faculty Advisor: Professor Kevin Parfitt Benjamin Borden Structural Option.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.
Swedish American Hospital Heart and Vascular Center Philip Frederick Structural Option AE Senior Thesis 15 April 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Adam Love Structural Senior Thesis Presentation 2010 The Pennsylvania State University FDA OC/ORA Office Building Silver Spring, MD.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
William W. Wilkins Professional Building Columbus, Ohio Michelle Benoit Senior Thesis Presentation Spring 2007 Structural Option.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Outline Introduction Structural Redesign Gravity System
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
Mitre III Building McLean VA Debra Schroeder Structural Option.
Presentation transcript:

Jon Hill – Structural OptionSpring 2005 Senior Thesis Structural Analysis and Redesign of Lynde and Harry Bradley School of Technology & Trade Milwaukee, Wisconsin

Jon Hill – Structural OptionBradley Tech High School Presentation Outline Proposal Structural Redesign Construction Study Façade Analysis Conclusions Background Information

Jon Hill – Structural OptionBradley Tech High School Background Information Project Team Owner: Lynde and Harry Bradley Technology & Trade School Commission Occupant: Milwaukee Public Schools Architect: Hammel Green & Abrahamson, Inc. Structural / Plumbing / Electrical Engineer: Hammel Green & Abrahamson, Inc. HVAC Engineer: IBC Engineering Services, Inc. Construction Manager: Hunzinger – Clark Joint Venture

Jon Hill – Structural OptionBradley Tech High School Background Information Project Description Function: High School Size: 280,000 SF Stories: 5 Total (1 below grade / 4 above grade) Cost: $50 Million Site Location 4 th & National

Jon Hill – Structural OptionBradley Tech High School Background Information Project Description Function: High School Size: 280,000 SF Stories: 5 Total (1 below grade / 4 above grade) Cost: $50 Million First Floor

Jon Hill – Structural OptionBradley Tech High School Background Information Project Description Function: High School Size: 280,000 SF Stories: 5 Total (1 below grade / 4 above grade) Cost: $50 Million Second Floor

Jon Hill – Structural OptionBradley Tech High School Background Information Project Description Function: High School Size: 280,000 SF Stories: 5 Total (1 below grade / 4 above grade) Cost: $50 Million Third Floor

Jon Hill – Structural OptionBradley Tech High School Background Information Project Description Function: High School Size: 280,000 SF Stories: 5 Total (1 below grade / 4 above grade) Cost: $50 Million Fourth Floor

Jon Hill – Structural OptionBradley Tech High School Background Information Architecture Expresses State-of-the-Art Technology Flexible Design to facilitate current and future technologies Green Design Concepts Natural Daylighting Recycled Building Materials Energy-efficient steam heating/cooling System Barrel Vault Roof Spans over 100 feet Supported by tension cables & smartbeams

Jon Hill – Structural OptionBradley Tech High School Background Information Existing Structure Cast-in-Place Concrete Spread Footings Square Columns 16” – 24” Pan & Joist System 32’ x 30’ bays 20” pan depth / 5” joist width 5” slab Open Web Steel Joists Flat Roof / Barrel Vault Roof

Jon Hill – Structural OptionBradley Tech High School Proposal Structure Redesign: Design an acceptable structural alternative Cost & Constructability Comparison: Evaluate alternate system Façade Analysis: Investigate a new façade design Project Criteria: Limit impact on exterior architecture (design goals) Minimal change to interior environment Provide a usable alternate structural system

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Option 1 Cast-in-Place Two-Way Slab with Drop Panels Good for square bays Option 2 Composite Steel System Fits any floor plan Easy to construct Steel System was chosen System not used efficiently due to its depth and weight Main members need to be fireproofed

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Design Criteria AISC LRFD 3 rd Edition Specifications Original design loads used Column / Foundation layout unchanged RAM Structural System used for design Vaulted Roof Modeled in RISA and supporting loads placed on RAM model Size Restrictions Columns 16x16W14 20x20W18 24x24W21 Beams Maximum System Depth of 25”

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Gravity Design Composite Deck Floor:Vulcraft 1.5” VLR Steel Deck (21 gage) – 4½” Concrete Cover Roof:Vulcraft 3” Roof Deck (18 gage) RAM Model Created

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Gravity Design Layouts – 2 nd Floor

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Lateral Design ASCE 7-02 Specifications System that allows gravity loads and lateral loads control Limit Drift to H/400 Barrel Vault Roof resists applied lateral loads internally Initial Design based on drift analysis Frames limited to interior spans Braced elements interfere with open floor plan

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Lateral Design N Frame Layout Reduces Building Torsion

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Lateral Design N North / South Direction Simple Moment Frames East / West Direction Standard Braced Frames Braced Members within Moment Frames

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Lateral Design Braced Members within Moment Frame

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Checks Stress Check RAM Frame Frame members increased due to stress values Gravity Connection Check User Entered Data (HGA) Lateral Connection Check Ram Frame Final Drift Analysis Story Drift << H/400 Building Drift << H/400

Jon Hill – Structural OptionBradley Tech High School Structural Redesign Results Steel Gravity System Effectively frames floor openings System depth acceptable Combination Lateral System Resists applied forces Reduces building torsion Maintains open floor plan

Jon Hill – Structural OptionBradley Tech High School Façade Analysis Original Façade One-wythe brick face supported by concrete backup Supported by angles tied into concrete on each level Alternate Façade One-wythe brick face with steel stud backup Supported by angles tied into edge beams on each level

Jon Hill – Structural OptionBradley Tech High School Façade Analysis Investigation Façade Problems Poor or missing flashing at windows or other penetrations Damage to system - brick damaged by freezing water - mildew damage Poor flashing / waterproofing design - water penetration to interior of building - corrosion of anchors or steel stud system - deterioration of gypsum sheathing

Jon Hill – Structural OptionBradley Tech High School Façade Analysis Investigation Design / Construction Considerations Match the durability of waterproofing and flashing to that of the other wall components. Protect the water sensitive gypsum sheathing by use of waterproofing. Provide through-wall flashing and weep details at each floor level. Maintain a wall cavity Prevent condensation and air flow inside the stud wall. Coordinate the various trades needed to install the wall and its flashing. Windows and doors must be tied into weather barrier and the exterior face of the wall

Jon Hill – Structural OptionBradley Tech High School Construction Study System Comparison System Total Cost Construction Time Concrete $2,878, Days Steel $2,158, Days Savings 25% 25.7% Cost and Construction Time decreased by ~ 25%

Jon Hill – Structural OptionBradley Tech High School Conclusions Met Design Goals Limited impact on exterior and interior architecture Alternate Steel System Not a better design but equally as effective Could save at most 25% of cost and construction time Able to create a professional design that is a viable option for Bradley Tech

Jon Hill – Structural OptionBradley Tech High School Acknowledgements Professionals Gordon Pierce Mathew Mikolainis Jeff Millmann Dean Rutila Peter Nelson Craig Allender Andreas Phelps Thesis Advisor Dr. Linda Hanagan Peers Kara Prince Ashley Byrne Thesis Supervisors Kevin Parfitt Jonathan Dougherty Thank You

Jon Hill – Structural OptionBradley Tech High School The End Questions ?