ARIES- ACT, 26-27 Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting 26-27 September 2012 Bethesda,

Slides:



Advertisements
Similar presentations
RP Designs Semi-Custom e-Commerce Package. Overview RP Designs semi- custom e-commerce package is a complete website solution. Visitors can browse a catalog.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Conceptual design of a demonstration reactor for electric power generation Y. Asaoka 1), R. Hiwatari 1), K. Okano 1), Y. Ogawa 2), H. Ise 3), Y. Nomoto.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 How to Achieve High Reliability, Availability, and Maintainability L. Waganer June 2007.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
September 15-16, 2005/ARR 1 Status of ARIES-CS Power Core and Divertor Design and Structural Analysis A. René Raffray University of California, San Diego.
Progress on the Configuration Design of the Fusion Power Core for the ACT (Draft) X.R. Wang M.S. Tillack S. Malang Sept. 29, 2011.
1 Lane Carlson ARIES Pathways Project Meeting Gaithersburg, MD, Oct 13-14, 2011 Substantiating the ASC & Implementing the DCLL Blanket.
January 8-10, 2003/ARR 1 Plan for Engineering Study of ARIES-CS Presented by A. R. Raffray University of California, San Diego ARIES Meeting UCSD San.
September 3-4, 2003/ARR 1 Initial Assessment of Maintenance Scheme for 2- Field Period Configuration A. R. Raffray X. Wang University of California, San.
Systems Code Status J. F. Lyon, ORNL ARIES Meeting June 14, 2006.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 16 September 2004 ARIES Meeting at Madison, WI.
June 14-15, 2007/ARR 1 Trade-Off Studies and Engineering Input to System Code Presented by A. René Raffray University of California, San Diego With contribution.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Systems Code Cost Algorithm Status and Planned Enhancements L. Waganer/ L. El-Guebaly 3-4 April.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
ARIES- Pathways, August 26-27, Atlanta, GA Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting August 2009 Georgia.
ARIES-AT Study L. M. Waganer 3 May 2000 Status of Vacuum Vessel Design L. Waganer 3 May 2000 ARIES Conference Call.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Poloidal Distribution of ARIES-ACT Neutron Wall Loading L. El-Guebaly, A. Jaber, D. Henderson Fusion Technology Institute University of Wisconsin-Madison.
Development of the New ARIES Tokamak Systems Code Zoran Dragojlovic, Rene Raffray, Farrokh Najmabadi, Charles Kessel, Lester Waganer US-Japan Workshop.
ARIES Studies L.M. Waganer 18 Sept 00/Page 1 Power Core Maintenance Approach and Maintainability Analysis By L. M. Waganer The Boeing Company For the ARIES.
Progress on Engineering and Costing Algorithms for ARIES Systems Code Zoran Dragojlovic, Rene Raffray, Chuck Kessel and Leslie Bromberg ARIES Project Meeting.
Status of 3-D Analysis, Neutron Streaming through Penetrations, and LOCA/LOFA Analysis L. El-Guebaly, M. Sawan, P. Wilson, D. Henderson, A. Ibrahim, G.
26 Jan Lane Carlson, Charles Kessel Mark Tillack, Farrokh Najmabadi ARIES-Pathways Project Meeting San Diego, CA Jan 26-27, 2011 Needful Systems.
Page 1 ARIES Project Meeting, L. M. Waganer, 3-4 March 2008 Restructuring System Cost Accounts and Algorithms L. Waganer 3-4 March 2008 ARIES Project Meeting.
LOCA/LOFA Analyses for Blanket and Shield Only Regions – LiPb/FS/He System Carl Martin, Jake Blanchard Fusion Technology Institute University of Wisconsin.
Highlights of ARIES-AT Study Farrokh Najmabadi For the ARIES Team VLT Conference call July 12, 2000 ARIES Web Site:
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
ARIES-CS Page 1 Summary of ARIES Power Core Unit Costs L. Waganer The Boeing Company 4-5 September 2004 ARIES Meeting at UCSD.
Recent Results on Compact Stellarator Reactor Optimization J. F. Lyon, ORNL ARIES Meeting Sept. 3, 2003.
March 20-21, 2000ARIES-AT Blanket and Divertor Design, ARIES Project Meeting/ARR Status ARIES-AT Blanket and Divertor Design The ARIES Team Presented.
ARIES-IFE Study L. M. Waganer, June 7, 2000 Page 1 Considerations of HI Beam and Vacuum System Arrangement L. Waganer The Boeing Company 7 June 2001 ARIES.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Maintenance Schemes for a DEMO Power Plant and related DCLL Designs Siegfried Malang 2 nd EU-US DCLL Workshop2 nd EU-US DCLL Workshop University of California,University.
ARIES -AT Study L.M. Waganer ARIES 3/20-21/00 Page1 ARIES-AT Vacuum Vessel Design Approach L. M. Waganer The Boeing Company 20 March 2000 UCSD San Diego,
Progress in ARIES-ACT Study Farrokh Najmabadi UC San Diego Japan/US Workshop on Power Plant Studies and Related Advanced Technologies 8-9 March 2012 US.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
QC Follow-up for Single Family SEEM Calibration, HVAC UES Measures, and Weatherization Measures Adam Hadley Regional Technical Forum May 12, 2015.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 Lane Carlson ARIES Pathways Project Meeting San Diego, CA Jan 23-24, 2012 Updating the SCLL Design & ASC Documentation.
U PDATED ARIES-ACT P OWER C ORE D EFINITION AND S I C B LANKET X.R. Wang, M. S. Tillack, S. Malang F. Najmabadi and L.A. El-Guebaly ARIES-Pathways Project.
1 Lane Carlson 1, Mark Tillack 1, Farrokh Najmabadi 1, Charles Kessel 2 1 University of California, San Diego & 2 Princeton Plasma Physics Lab US/Japan.
ARIES- ACT, 21-22May 2013, Germantown, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting May 2013 Hampton Inn,
1 Lane Carlson ARIES-Pathways Project Meeting Gaithersburg, MD, July 27-28, 2011 Generalization and Blanket Updates to the ASC.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
ARIES- Pathways, October 25-26, 2010 Bethesda, MD Page 1 L. Waganer Consultant for The Boeing Company ARIES-Pathways Project Meeting October 2010.
1 Neutronics Assessment of Self-Cooled Li Blanket Concept Mohamed Sawan Fusion Technology Institute University of Wisconsin, Madison, WI With contributions.
R EFINEMENT OF THE P OWER C ORE C ONFIGURATION OF THE ARIES-ACT SA X.R. Wang 1, M. S. Tillack 1, S. Malang 2 and F. Najmabadi 1 1 University of California,
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
ARIES Meeting, UCSD L. M. Waganer, June 2006 Maintainability and Availability Analyses L. M. Waganer The Boeing Company ARIES Meeting University.
Progress of ARIES Systems Code Development Zoran Dragojlovic A. René Raffray Farrokh Najmabadi ARIES-“TNS” Project Meeting June 14 and 15, 2007 General.
Required Dimensions of HAPL Core System with Magnetic Intervention Mohamed Sawan Carol Aplin UW Fusion Technology Inst. Rene Raffray UCSD HAPL Project.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Neutron Wall Loading Update L. El-Guebaly, A. Jaber, A. Robinson, D. Henderson Fusion Technology Institute University of Wisconsin-Madison
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
1 Lane Carlson, Charles Kessel, Stephen Efthyvoulos ARIES-Pathways Project Meeting Bethesday, MD April 4-5, 2011 Finalized Systems Code Modifications &
Comments on ARIES-ACT 1/2011 Strawman L. El-Guebaly Fusion Technology Institute University of Wisconsin-Madison
MELCOR model development for ARIES Safety Analysis
Description of Thin Liquid Wall Protection w/Porous Walls
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Consultant for ARIES Project/UCSD/DOE
DCLL Blanket Analysis and Power Core Layout for ARIES-DB
Trade-Off Studies and Engineering Input to System Code
Actuaries Climate Index™
Comments on ARIES-ACT 10/20/2010 Pre-Strawman
ACT1 LOFA model updates and LOCA analyses
Systems analysis of ACT2 design space
Analysis of Technical and Programmatic Tradeoffs with Systems Code
ACT-1 design point definition
Presentation transcript:

ARIES- ACT, Sept, 2012, Bethesda, MD Page 1 L. Waganer Consultant for ARIES Project / UCSD / DOE ARIES Project Meeting September 2012 Bethesda, MD Assessing ACT Cost Results & Status of Cost Documentation

ARIES- ACT, Sept, 2012, Bethesda, MD Page 2 Status of ARIES Systems Code Results The ARIES Systems Code produced the ACT-1d performance and cost results on 26 July I used the print files for the source of data. The code has incorporated the costing algorithms recommended and this assessment was conducted to validate those results. PS. Where is the Availability shown?

ARIES- ACT, Sept, 2012, Bethesda, MD Page 3 Systemic Error The first finding was that the method for the GDP escalation factors is being incorrectly applied. ASC costs are reported in 2010$. All costs seem to be inflated by about 9.5%. GDP Implicit Price Deflator 27 July 2012 Cost Algorithm Basis ASC Reported Basis Example Calculation – Land Cost C = $20 M x (P net /1000) 0.3 x / (where P net = MW) = $20 M x ( /1000) 0.3 x / = $ M As opposed to reported cost of $ M, % high Second Example – Site Improvements and Facilities C = $27 M x / = $ M vs. reported cost of $ M, 9.529% high This error seems to be systemic to all the reported costs. The 2010$ base value is correct, but the base cost used was 2005$ instead of the 2009$ algorithm cost basis. Simple Fix. GDP Chained Basis Reported costs should = / = times 2009$

ARIES- ACT, Sept, 2012, Bethesda, MD Page 4 Some Accounts Not Estimated A few Cost Accounts, shown below, are not being estimated, probably due to lack of definition. These accounts need to be examined to determine the primary cost parameters and then develop cost algorithms for them Shield Cooling, Low Temperature Thermal Isolation Struts (TF Coils) Feedback Control Coils Cryogenics for Plasma Confinement Power Supplies for Plasma Confinement Stability Control Subsystem with Power Supplies Primary Vacuum Pumps Roughing or Backing Pumps Plumbing, Cryogenic (for Vacuum System)

ARIES- ACT, Sept, 2012, Bethesda, MD Page 5 Costs Are Reported in Two ASC Files The Systems Costs are reported in the “Costing Accounts” file, whereas more detailed cost data are reported in the “Systems - Full Part Printout” file. The latter has many different sections pertaining to different subsystems. However, the data in these two files do not agree in organization or content. The next two slides generally show how they correspond. Additional slides will provide more information about specific subsystems. Generally, I try to identify inconsistencies and not fix them.

ARIES- ACT, Sept, 2012, Bethesda, MD Page 6 “Costing Accounts” Results Do Not Match with “Systems - Full Part Printout” Fusion Energy Capture and Conversion: First Wall and Blanket, replaceable, IB & OB: Second Blanket, life of plant: Divertor Assembly, upper and lower, replaceable: High Temperature Shield, outside blanket &/or divertor, replaceable High Temperature Shield, outside of replaceable HT Shield, life of plant: Penetration Shielding (low temperature, active and passive): Shield cooling, low temperature: 0 ASC Full Part File The ASC file “Costing Accounts” data is inconsistent with the “Systems, Full Part Printout” Data. Only the Fusion Energy Capture and Conversion data is shown above. The categories do not correspond in all cases. e.g., There are two HT shields. I believe the upper one is the HT Shield/Structure (aka Steel Ring) and the lower one is the LT Shield. In the Full Part File, they are given the name HT, IB/OB and HT, Top and Bottom. See another VG for more info. Where do Manifolds show up? Vacuum Subsystem costs are inconsistent (see another VG) The CryoDome is estimated but where does it show up?

ARIES- ACT, Sept, 2012, Bethesda, MD Page 7 Costs Differ Between ASC “Systems - Full Part Printout” and “Costing Accounts” These two sets of data from the ASC output files differ. Mark needs to determine the source of the differences. Purple font text items are added for sums or non-mentioned data

ARIES- ACT, Sept, 2012, Bethesda, MD Page 8 Fusion Energy Capture Accounts and Need To Be Renamed Fusion Energy Capture and Conversion: First Wall and Blanket, replaceable, IB & OB: Second Blanket, life of plant: Divertor Assembly, upper and lower, replaceable: High Temperature Shield, outside of blanket and/or divertor, replaceable: High Temperature Shield, outside of replaceable HT shield, life of plant: Penetration Shielding (low temperature, active and passive): Shield cooling, low temperature: Acct Acct should be labeled “High Temp Shield and Support Structure - Replaceable or Life of Plant?” - Drop use of “Steel Ring” Acct should be labeled “Low Temperature Shield Outside the Vacuum Vessel, Life of Plant”

ARIES- ACT, Sept, 2012, Bethesda, MD Page 9 Lifetime Power Core Components Removed with Sector are SCR Items Fusion Energy Capture and Conversion: First Wall and Blanket, replaceable, IB & OB: Second Blanket, life of plant: Divertor Assembly, upper and lower, replaceable: High Temperature Shield & Support Structure, outside of blanket, replaceable: Low Temperature Shield, outside Vacuum Vessel, life of plant: Penetration Shielding (low temperature, active and passive): Shield cooling, low temperature: 0 A potential replacement strategy is to remove an entire sector, including FWB, Bkt II, Divertor and HT Shield/Support Structure to Hot Cell. Then a refurbished sector is moved back to the power core. During operation, the FWB and Divertors are removed, the Blanket II and HT Shield/Support Structure are inspected and the FWB and Divertors are replaced. Therefore, the Bkt II and HT Shield/Support Structure are in the Hot Cell about half the time. But the second set needs to be accounted as Scheduled Component Replacement hardware, SCR. We need to rename recommends the “steel ring” should be replaced at 10 or 20 yrs. Which is being used? What is best terminology for replaced components? Replaceable, Recyclable, LOP?

ARIES- ACT, Sept, 2012, Bethesda, MD Page 10 Radial Builds Differ Between ASC Code and Laila’s 5/31-6/1 Meeting Data Radial Build from 5/31-6/1/12 Meeting Laila, Xueren and Mark need to resolve differences.

ARIES- ACT, Sept, 2012, Bethesda, MD Page 11 Material Costs Are Slightly Out of Date In the Materials Properties file, the material unit cost basis is Rev P, so Les just provided Mark the current Rev S version. The material cost database is presently displayed in 2011$. Are these values converted to 2010$ for the Cost Accounts? Lithium enrichment should be 55-60% per El-Guebaly presentation on 5/31/12. (60% OK?)

ARIES- ACT, Sept, 2012, Bethesda, MD Page 12 Errors in the FWBS Reporting Volume of FWB and Bkt II are similar, yet the Bkt II mass is double with identical materials. However costs are similar. Materials for LT Shield in ASC data seem to be FS/SiC, not FS/WC/B-FS, per El-Guebaly, 5/12. Eliminating the SiC and adding WC and B-FS would significantly lower the LT Shield cost. The ratio of volume, mass and cost between the LT Shld and HT Shield/Support (aka Steel Ring) at roughly 10 seems excessive, although the LT Shield/Str is thicker and at a larger radius on the OB region. In the Systems Data/Full Parts file, the product of the mass times the most expensive material unit cost for that component is only a small fraction of the reported cost in either the Full Parts file or the Cost Accounts.

ARIES- ACT, Sept, 2012, Bethesda, MD Page 13 Further Examination of FWBkt and Bkt II Full Parts File Data OB Bkt has twice the volume of IB, but 66% of the mass and 128% of the cost, Tungsen in the IB might help explain the higher weight, but not the cost difference. Blanket II is 50% thicker than the OB Blanket and has 67% more volume, which is probably correct. However the mass is five times as much and cost 2.67 times as much. Is this due to material composition errors (should be FS/WC/B-FS)? $45.72 M Cost Acct Data $56.14M

ARIES- ACT, Sept, 2012, Bethesda, MD Page 14 Examination of HT and LT Shields In Systems – Full Part File Data is from System – Full Part Printout It is difficult to identify the shielding components by name. All categories are called “HT”. Some are called IB and OB, others are called replaceable Top and Bottom. Suggest correcting nomenclature per prior slides. The HT IB/OB Shields (LT Shield?) volumes are 8.25 times as large as Replaceable HT Top/Bottom Shields (HT Shield/Structure?), 12.1 times as heavy, and costs 5.1 times as much – this is probably due to the SiC content in the Rep HT T/B Shields. Need to verify data.

ARIES- ACT, Sept, 2012, Bethesda, MD Page 15 Power Core Vacuum System Costs Do Not Agree With Part File Data Vessel components costs are not consistent. Maintenance ports show up as a higher cost as they are more massive. Not sure what “Maintenance Port Sum” means. VV ducts do not match the Account Cost results. Primary and Roughing Pumps and Cryo Plumbing are not in Part File Full Part File Cost AcctsVacuum vessel Main86.26$ Vacuum Vessel327.33$ Vacuum Vessel Outboard42.30$ He Liq-Refr16.65$ Maintenance Port166.37$ Includes doors? Primary V. Pumps-$ Maintenance Port Sum192.02$ Roughing Pumps-$ UpperVVDuctBottomWall4.36$ Vac Pump Ducts 30.40$ UpperVVDuctTopWall2.49$ Plumbing, Cryo-$ UpperVVDuctSideWall9.41$ Total374.38$

ARIES- ACT, Sept, 2012, Bethesda, MD Page 16 Summary of ASC ACT Costs The cost reporting methodology is in place and is working The consistency of the nomenclature should be improved Compatibility of cost data internal to the Parts File and between the Cost Accounts needs to be corrected An error in the escalation methodology needs to be fixed The materials data base needs to be updated

ARIES- ACT, Sept, 2012, Bethesda, MD Page 17 Status of ARIES Cost Documentation  From 2007 to 2009, I have been documenting the historical economic basis for the ARIES Systems Code and updating the costing algorithms.  The updated cost algorithms have been implemented in the ASC code.  A comprehensive ARIES Cost Account Document has been written and updated that describes the evolution of MFE power plant economic cost estimating process from the early 1970’s to the current time. The basis for the current costing algorithms are defined and substantiated.  The present intent is to publish the document on the ARIES web as an evolving economic document that is the basis for the ASC economic analyses.