1 ITU-R Liaison Group Report - Session #72 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0006 Date Submitted: Source: Reza ArefiVoice: Intel Venue: IEEE Session #72, WG Opening Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and. Further information is located at <htFurther information is located at and.ateriml> and <
ITU-R Liaison Group Report - Session #72 Opening Plenary Reza Arefi ’s ITU-R Liaison Official IEEE Session #72 Singapore, March 2011
Relevant Documents from Previous Sessions IEEE L /0017r6 IEEE ITU-R Liaison Group Workplan IEEE L /0130 Agenda for the first meeting of the WirelessMAN-Advanced Transposing Organizations (WATO), to be held on 15 March 2011 IEEE L /0134r1 ITU-R Liaison Group Report to Closing Plenary of Session #70 ========== Also =========== IEEE L /079 IEEE IMT-Advanced review process (IEEE /r6)
Input Documents for Session #72 Liaisons L _0004 – Draft ARIB STD-T103, Version 1.0: 200 MHz- Band Broadband Wireless Communication Systems between Portable BS and MSs ( ) L _0003 – Coordination on P draft PAR – P Contributions IEEE L802.16itu-10/ Comments on the Overview section of the draft IEEE
Proposed Objectives for Session #72 per Workplan Prepare M meeting X contribution, review with , and approve at the EC Finalize contribution for IMT.RSPEC (Overview in B.1 & titles and synopses of the GCS in B.2) Further develop contribution to WP 5D on M.1224 (to provide Abbreviations), Ref: IEEE L /0132d1 Send LS to ARIB, TTA and the WiMAX Forum on the status of preparations for submission towards IMT.RSPEC Develop contributions to WP 5A on topics such as M2M,CRS, etc. beyond Workplan Review input contributions and take appropriate action Review input liaison statements and prepare responses as appropriate, review with , and approve at the EC Update ITU LG workplan as appropriate
Proposed Agenda for the Week 1) Introduction, approval of the agenda 2) Review and follow workplan of IEEE L /0017r6 3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary 4)Update workplan 5)Approve all outgoing documents 6)Other business
Proposed schedule for the Week (Room: 4506) MondayTuesdayWednesdayThursday AM 08:30 to 12:00 WATO Meeting 08:30 to 12:30 Location: ) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary 4) Update Workplan 5) Approve all outgoing documents 3) Review input contributions and liaisons and prepare responses and any other output documents to external organizations as necessary PM 13:30 to 17:00 (Mon. 4:00- 6:00 PM) 1) Introduction, approval of the agenda 2) Review and follow workplan of IEEE L /0017 6) Other business
UPDATE ON ITU-R IMT-ADVANCED DEVELOPMENT
We are here IMT-Advanced Development Process
Evaluation Reports from external evaluation groups were presented and reviewed (see next slide) WP 5D developed acknowledgments back to evaluation groups (IMT-ADV documents) WP 5D agreed that steps 4 and 5 of the process are COMPLETE WP 5D preliminary concluded that step 6 is also complete – Started filling out of M.2113 compliance templates which contains WP 5D view that both technologies meet the requirements – To be included in IMT.RADIO to be finalized at 5D#9 Outcome of WP 5D #9
completed Step 6 and Step 7 – Step 6: Review to assess compliance with minimum requirements – Step 7: Consideration of evaluation results, consensus building and decision – Finalized IMT.RADIO – Announced final decision on IMT-Advanced technologies WirelessMAN-Advanced LTE-Advanced – Started development of Recommendation M.[IMT.RSPEC] to contain detailed specifications of IMT-Advanced radio interfaces – due for completion in April 2011 Outcome of WP 5D #10
To complete Step 8 – Finish development of first version of Recommendation M.[IMT.RSPEC] to contain detailed specifications of IMT- Advanced radio interfaces – Further develop future update process of Recommendation ITU-R M.[IMT.RSPEC] WP 5D #11
ActivityStartStop ITU-R Action/Deliverable/Milestone WP 5D Meeting #8 9 Jun June 10 Liaison to External Organizations on the procedural details and detailed timelines for the completion of draft new Rec. ITU ‑ R M.[IMT.RSPEC]. RIT/SRIT Proponents - Due to ITU-R by 6 Oct. 10 Delivery to ITU-R by RIT/SRIT Proponents of Form A. See Item 4 (Table 3). WP 5D Meeting #9 13 Oct Oct. 10 WP 5D takes note of the Form A’s in order to determine the structure of draft new Rec. ITU-R M.[IMT.RSPEC]. WP 5D provides liaisons to RIT/SRIT Proponents and GCS Proponents. GCS Proponents - Due to ITU-R by 30 Mar. 11 Delivery to ITU-R by the GCS Proponents of the Overview and either titles and synopsis of the GCS, or the Directly Incorporated Specification when GCS is not utilized. See Item 1(Table 2). Delivery to ITU-R of the Global Core Specifications by the GCS Proponents. Detailed transposition references would not be required at this point. See Item 2 (Table 2). Delivery to ITU-R of Certification B by GCS Proponents. See Item 5 (Table 3). WP 5D Meeting #10 6 Apr Apr. 11 WP 5D takes note of the Certification B’s. WP 5D finalizes and preliminarily agrees draft new Rec. ITU-R M.[IMT.RSPEC] (not necessarily including the detailed transposition references). WP 5D Liaison of the preliminary WP 5D agreed draft new Rec. ITU-R M.[IMT.RSPEC] to the relevant GCS Proponents and authorized Transposing Organizations for their use in developing their inputs of the detailed references. WP 5D Meeting #11 7 July July 11 WP 5D addresses responses from External Organizations on draft new Rec. ITU-R M.[IMT.RSPEC] Transposing Organizations (in the case of a GCS being utilized) - Due to ITU-R by 21 Sep. 11 Delivery to ITU-R of transposition references by each Transposing Organization for incorporation into the WP 5D preliminary agreed draft new Rec. ITU-R M.[IMT.RSPEC] See Item 3 (Table 2). Delivery to ITU-R of Certification C by each Transposing Organization. See Item 6 (Table 3). WP 5D Meeting #12 12 Oct Oct. 11 WP 5D reviews and agrees the completed draft new Rec. ITU-R M.[IMT.RSPEC] (which now includes all transposition references) and forwards to Study Group 5 Radiocommunication Bureau - 14 Nov. 11 Submission by Counsellor for SG 5 of completed draft new Rec. ITU-R M.[IMT.RSPEC] (with all transposition references) to SG 5, based on currently anticipated SG 5 meeting schedule Study Group 5 21 Nov Nov. 11 Study Group 5 considers adoption of the new Rec. ITU-R M.[IMT.RSPEC] for forwarding to the Radiocommunication Assembly for approval. Radiocommunication Assembly 16 Jan Jan. 12 Radiocommunication Assembly considers approval of Rec. ITU-R M.[IMT.RSPEC]
M EETING OF W IRELESS MAN-A DVANCED T RANSPOSING O RGANIZATIONS (WATO) 15 M ARCH 2011
First meeting of WirelessMAN-Advanced Transposing Organizations (WATO#1) on 15 March 2011 Participation from IEEE, ARIB, TTA, and WiMAX Forum Discussion topics include: – IMT-Advanced documentation development – Presentations from TOs – Agreement on transposition and communication plans – Discussion of M.[IMT.RSPEC] update process – WATO meeting frequency and schedule – WATO meeting arrangements and next meeting WATO#1