A joint project between the Chartered Institute of Building Services Engineers (CIBE) and the Association for Decentralised Energy (ADE) finalised June.

Slides:



Advertisements
Similar presentations
REALTY KNOWLEDGE ARBITRAGE ADDING VALUE THROUGH AT LandSmiths Projects Pvt. Ltd. Credentials Statement.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
New Paradigms for Measuring Savings
Project Title Speaker Name Job Function Organization type ( maximum 10 words – reflecting project concept and results )
Use of resources 2008/09 Briefing. Response to UoR consultation 203 responses from all types of organisation, auditors, stakeholders 61% agreed with overall.
Indicative Business Case
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Duke Energy Carolinas Dan River Combined Cycle Project 8/17/10 For Vogt Power, my best estimate is 214 shipments (rail, truck, LTL, and small parcel- UPS.
Evaluation of Decentralised Energy Systems – Fuel Poverty Oliver Martin-Du Pan Prof. Dino Bouchlaghem Prof. Philip Eames Prof. Paul Rowley Authors:
Sustainable Architecture Presented by Caroline Batson Senior Architect and Sustainability Manager.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Brought to you in association with The Benefits of Strategic Partnership.
Decentralised energy the role of a sustainable sports centre Winchester Fit for the Future With input and advice from the University of Winchester and.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Southwark’s New District Heating Network.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
Camden Sustainability Partnership Board 1st March 2011.
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
Workshop – Local Financing, Role of ESCo Gavin Slater City Energy & Carbon Manager, Glasgow City Council
1 Brendan Devlin Adviser, Markets and Infrastructure Directorate B, DG ENER European Commission.
PLS WORKSHOP September 18, 2012 Greg Miller Ice Energy Terry Andrews CALMAC Manufacturing Corp.
New Procurement & Delivery Arrangements for the Schools’ Estate Presentation to Strategic Advisory Group 18 April 2005.
Heat Network Partnership
S/W Project Management
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Rural Development’s Rural Energy for America Program (REAP) Grants and Loans Guarantees & Renewable Energy Feasibility Studies June 5, 2009.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Partnership for Urban South Hampshire Sustainable Growth.
Lidzbark Warmiński heating plant in RETScreen Software Justyna Pawilonis 28 March 2007 Lidzbark Warmiński.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
GREATER BIRMINGHAM & SOLIHULL LOCAL ENTERPRISE PARTNERSHIP AREA Priority Axes 4 & 6 - Calls Workshop Supporting the shift towards a low carbon economy.
Local Development Plans and Heat Networks Alexandra Lewis Planning Officer (Development Planning) Falkirk Council Development Services.
Working together for a decarbonised heat sector District Heating Strategy Support Programme Module 4: Commercial & financial strategies (Part 1) Paul Moseley,
1 Energy Efficiency & Utilities Sector March 2014 CALIFORNIA COMMUNITY COLLEGES CHANCELLOR’S OFFICE.
Ensuring the delivery of secure low carbon energy David Green Chief Executive, UKBCSE.
Low Carbon Infrastructure Transition Programme (LCITP) Background Programme aims Projects areas supported Eligible applicants Case Study What's next Contact.
Low carbon heat international showcase Edinburgh The Public Sector Role in Developing Area-wide Low to Zero Carbon Heat 18 th November 2014.
Financial Engineering Instruments in 2014 – 2020 ETC 10 th European Week of Regions and Cities Brussels, 10 October 2012.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
DISTRIBUTED GENERATION, RENEWABLE ENERGY AND SUSTAINABILITY. IMPACT ON POWER QUALITY AND NETWORK PLANNING “Inauguration of the 6th Framework Programme”
Feasibility Study as a Basis for Investment Financing Arto Nuorkivi ESCOBALT Project Manager, Finland Kaunas, Dec. 14, 2005.
Heat Network Partnership Workshop Glasgow 8 September 2015.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
1 Water Services Training Group 17 th Annual Conference Creating a new Irish Water Industry INEC, Killarney, 5 th September 2013.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
IDEA SUBMISSION India Innovation Lab for Green Finance.
DRIVING PROFITABILITY IN CHALLENGING TIMES Steve Mather Neighbourhoods and Regeneration Director © Places for People Homes Limited 2013.
1 BASE London – DE panel discussion 11 th July 2013 District Energy strategy into reality Turning.
Mobilising Local Energy Investment Funds in Greater Cambridge (MLEI) Contract No: IEE/11/036/SI October 2015 The sole responsibility for the.
Rob Boyer Associate, AECOM. Heat Innovation - Changing the way we think about delivering heat Rob Boyer, Associate Director Infrastructure and Sustainability.
Ryan Gunn Scottish Government. Low Carbon Infrastructure Transition Programme - LCITP Scotland’s Low Carbon Project Development Unit.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Funding for Innovation Dr Deborah Pullen – Director, MBEKTN.
Rob Connatser NSS Instrument Work Packages and XLPM.
Planning and Realisation of Wind Farms
Fort Stanwix National Monument Energy Audit Contract
East Hampshire District Council Energy Alton
2017/18 SIP Request Process September 2016.
District Heating Network
ASSET MANAGEMENT.
Affordable Energy Production from Renewable Fuel
Strategic Managing Operational
RealValue H2020 Overview RealValue project funded under H2020 LCE 8 – 2014: Local / small-scale storage Commenced 1st June 2015 (duration 36 months) EU.
Developing and Issuing the RFP
PROJECT DELIVERY METHODS
Feasibility Study for E-mobility in Montenegro
Local Authorities and Sustainable Energy
Presentation transcript:

A joint project between the Chartered Institute of Building Services Engineers (CIBE) and the Association for Decentralised Energy (ADE) finalised June 2015

Key to a low carbon infrastructure The Code seeks to provide clear and measurable outputs which will ensure that a heat network operates effectively and meets client and customer expectations. Setting minimum standards is a key step to provide greater confidence for specifiers and clients and these can also be included in the tendering/contracting process.

Select dummy image and right click> change image> and then select the high res image you wish to use. Hold down shift whilst using the mouse to scale the image up or down, to avoid it from stretching. Please delete this instruction after doing so. Scope of the code Preparation and briefing Feasibility Design Construction and installation Commissioning Operation and maintenance Ensuring Customer expectations are met

Improve the quality of feasibility studies, design, construction, commissioning and operation by setting minimum requirements and identifying best practice Increase energy efficiency Ensure high quality customer service Increase confidence in heat networks for customers and investors Focus on feasibility studies

HNP and the Code To achieve sufficient accuracy of peak heat demands and annual heat consumptions – CIBSE TM22 applied to annual loads To identify the most suitable low carbon heat sources and location of an energy centre To determine the location of top-up and standby boilers and use of existing boilers To select suitable operating temperatures – Consider renewables, heat loss and heat storage requirements. To define heat network distribution routes, pipe sizes and costs – HNP standard schedule of rates for pipework and heat loss To determine building connection costs including heat metering To minimise the negative impacts of phasing the development

Development of scope and preparation of specification. Framework of credible study providers Evaluation of responses Preparation of financial viability HNP added value– Brief, Procurement, quality control and reduced cost Output to feed into LCITP funding Detailed Feasibility

Framework contract for DH feasibility 8 Delivery contractors Arup Burro Happold Craighall Energy GEP Environmental Parsons Brinckerhoff Ramboll Ricardo-AEA Jacobs

Investment grade proposal Business case and proposition to prospective investors Contents: Information memorandum Project description Investment Proposition Delivery Strategy Potential investor exit points Timeline Information is available to potential investors Collaborative Partners and Advisers Market demand analysis List of project backers Valuations