1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Probestation 1: 6“ (200mm * 300mm + 360° rotation + 15mm Z) QTC Instruments: HP4274A (LCR), K6517 (electrometer), HP6614C (voltage supply), K595 (quasistatic.
Calice Meeting DESY 13/2/07David Ward Guidelines for CALICE presentations Recently approved by the Steering Committee.
1/13/2004USCMS Tracker Meeting Sergey Korjenevski U of R Status Report IV curve and “second kink” QA stand status - R poly measurement has been debugged.
October 7, 2003 US Silicon Tracker group Sergey Korjenevski University of Rochester 1 Quality Assurance Test Stand University of Rochester oQTC at Rochester,
Sensor overview Ulrich Heintz Brown University, Providence, RI 6/18/2015U. Heintz - Sensor Overview 1.
Surveyors Conference Project Update for the as of March 2007 Right of Way Data Management System (RWDMS)
8/22/01Marina Artuso - Pixel Sensor Meeting - Aug Sensor R&D at Syracuse University Marina Artuso Chaouki Boulahouache Brian Gantz Paul Gelling.
Sergey Korjenevski KSU The Run IIb Silicon Tracker Workshop, Dec 12-13, out of 23 Status update and Test results for Run2b Si sensors at KSU Sergey.
B. IlleWACH /11/20021 WELCOME to WACH I am happy to introduce this ‘Workshop Analysis Calorimetry H4’ dedicated to M0’ data analysis and the.
Frank Lehner U Zurich Characterization of inner layer sensors DØ Inner Layer Sensor Production Readiness Review FNAL, 8/8/2003 M. Demarteau, R. Demina,
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
Sergey Korjenevski KSU DØ Run2b Silicon meeting, Oct 10, Preliminary testing results of Elma and HPK sensors Sergey Korjenevski Kansas State University.
Quality Test of L1 sensors HPK 10 sensors –Tested all, 6 sent to Fermilab – Test structures, HPK 133 L00 CDF ELMA 9 sensors –Tested 6 of 9.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
4/2/2003P. Riedler/CERN SPD Team1 Testing Wafer test status Annealing tests on VTT ladder.
2004/09/07 Junkichi Asai (RBRC) (Kieran Boyle (SBU))
Silicon RunIIb Workshop, Dec , A. Bean, M. Demarteau Slide 1 Workshop  Workshop is to “Move beyond the Technical Design Proposal”  Many.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
QA Workshop at CERN 3-4 November Hamamatsu silicon detectors for high energy physics experiments Kazuhisa Yamamura*, Shintaro Kamada.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
Matthias Bergholz DESY Zeuthen 1 Mpix Sensors.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
Testing Site Qualification Purpose: –Perform detailed scans of the silicon microstrips to make sure they all work. –Check HPK. Candidates for Certification:
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
DOE Rev of Run IIb Sep 24-26, Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University Frank Lehner University.
D. Buchs, A. Chen, D. Hurzeler, L. Lúcio, L. Pedro, M. Risoldi Software Modeling and Verification group Applications Discovered = Appear Save or Discard.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
1 HBD Update: DC Meeting June 2006 Thomas K Hemmick for the HBD Crew…
Silicon Strips for PHENIX SVTX Status and Plans for Silicon Strips in PHENIX SVTX Abhay Deshpande Recent development: Possibility of the second Si Pixel.
1 Device Simulations & Hardware Developments for CBM STS Sudeep Chatterji CBM Group GSI Helmholtz Centre for Heavy Ion Research CBM Collaboration Meeting,
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
RD50 Michael Moll – PH-TA1-SDMeeting February 25, Three R&D strategies:  Material engineering - Defect engineering of silicon (oxygenation, dimers,
Dzero RunIIb Sensor PRR, August 8, Marcel Demarteau Slide 1 DØ Inner Layer Sensor Production Readiness Review August 08, 2003 M. Demarteau for the.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Run Iib Workshop Dec 12-13, 2002 Silicon sensors procurement and quality assurance WBS Regina Demina Kansas State University.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Production Readiness Review of L0/L1 sensors for DØ Run IIb R. Demina, August, 2003 Irradiation studies of L1 sensors for DØ 2b Regina Demina University.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Emulsion processing at Gran Sasso a brief update The new building Meetings between Company’s management and GS staff to fully define the project ‘Work.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
CALO News Pascal Perret LPC Clermont 23 October 2011.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Preparation for silicon sensor arrival sensor delivery schedule aggressive expect 130 L2-L5 sensors each in July and August sensor lot/batch will likely.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Banner Project Overview February 24, Presentation Objectives:  What is the Banner Project ?  When are we doing it ?  How will we do it ?  Who.
Project status, Apr 2003 Barrel Muon Alignment 9 April 2003, G. Bencze Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 General.
Si Sensors for Additional Tracker
Right of Way Data Management System (RWDMS)
Karlsruhe probe equipment and QA proposals/expertise
Banner Project Update for Division Deans
10/month is the present production rate 2 FTE + sporadic contributions
X-ray Pump-Probe Instrument
LCLS Undulator System Production Management
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Status of Hamamatsu Silicon Sensors
Presentation transcript:

1 Silicon Testing at KSU Sergey Korjenevski Kansas State University 06/18/2002 (11 slides total)

2 Outline  Prototype Availability  Prototype properties (IV-CV measurements)  QA Procedure  Radiation Test Preparation  Documentation web page  Manpower

3 Stock  14 prototypes of L0 delivered by Mike Merkin in February 2002 – 2 at Fermilab in L0 noise testing, 1 at Stony Brook  Names - 234_1d1; 234_11d2; 234_5d1; 234_7d2; 236_1d1; 236_1d2; 236_3d2; 236_3d1; 236_9d1; 236_9d2; 235_1d2  Two types of silicon  Low depletion 22V  “Higher” depletion 70V  I leak at depletion (from 70 to 340 nA)  Low breakdown (from 260V to 530V) (specifications V bdn >700V after irradiation)

4 Stock V depletion

5 Stock Leakage current

6 Stock Breakdown

7 QA Procedure  Hardware complications  Source of noise – devices cross talk  Possible solutions  Electronics (Improved guard box? Cables?)  Software control (switches?)  Run test all over measuring different elements, i.e. IV separated from CV (Time?)  ELMA DC pads are quite small for I leak measurements  Is it too late to make any adjustments?

8 Expected Delivery  Last news from Moscow Dima Karmanov is coming on June 27 th – July 2 nd with 14 improved L0 prototypes He also will bring 4 L1 prototypes  QA data taken at Moscow (Cac, Rpoly, Idiel, CV and IV) will be used for calibration as well.  HPK in four months or so.

9 Radiation Test  While Dima Karmanov is on his way we plan to begin Engineering Run using stocked detectors.  Run will start next Monday, 6/24/2002  Details in Tim’s talk of May 22, 2002, D0run2b Silicon meeting

10 Documentation  The new web site has been setup. It has not been populated yet. Will contain all relevant information on Si Detectors testing at KSU such as equipment, QA documents, test data, pictures, software, links and so on.  Will be finished by the end of the week.

11 Manpower  SKK  Dima Karmanov  Jesus Hernandez – experienced undergrad, leaving in 3-4 months  MSU REU student Mike Litos, David Minae and Christen Kitten – started training, available for summer, for irradiation test in particular

12 NOTES  Note on radiation schedule and procedure to be ready by the middle on next week upon engineering run experience  oxygenated?  documentation web page