International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.

Slides:



Advertisements
Similar presentations
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Advertisements

Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
INDUSTRIAL & SYSTEMS ENGINEERING
Managing the Information Technology Resource Jerry N. Luftman
Unified Nuclear Industry Catalogue of Equipment and Materials Used for Designing, Construction and Operation of NPPs NIZHNY NOVGOROD ENGINEERING COMPANY.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
Wind energy in NZ 20% wind by 2030 Eric Pyle, Chief Executive, NZ Wind Energy Association.
Engineering Technology Division
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
IAEA, Vienna November 2007 SOME PROSPECTS FOR IMPROVING FINANCING OF DEVELOPMENT OF NUCLEAR POWER INFRASTRUCTURE TECHNICAL WORKSHOP ON THE ISSUES FOR THE.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
International Atomic Energy Agency Achieving human performance excellence in the nuclear industry through leadership, education, and training C. R. Clark.
1 IS 8950 Managing and Leading a Networked IT Organization.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
SOCIAL AND LABOUR PLAN.
Tom MAZOUR IAEA, Division of Nuclear Power
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
IAEA International Atomic Energy Agency Nuclear Energy Programme Implementing Organization (NEPIO) Anne Starz Nuclear Power Engineering.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Ministry of Economy, Trade and Industry Experience and Future Activities for Introduction of Nuclear Power Masaomi KOYAMA Deputy Director Nuclear Energy.
International Atomic Energy Agency IAEA Nuclear Knowledge Management Programme Meeting of the IAEA Technical Working Group on Nuclear Power Plant Instrumentation.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
Priority Programs of the Nuclear Power Industry Branch of Russia Vladimir Asmolov 17 th Symposium of AER on VVER Reactor Physics and Reactor Safety
TM/WSP 5-9 Nov Group B1- Management - Human resources development - Financing - Electric grid, industrial inv. and procurement QUESTIONS / DIFFICULTIES.
VUJE, a. s., Okružná 5, Trnava Strengthening the European Union Energy Security Prepared by Peter Líška (Slovak proposal) Brussels, 14th September.
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
IAEA International Atomic Energy Agency Nuclear Power Infrastructure Development Technical Meeting/Workshop on: TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT:
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Utility Engineers, PC.  Generation  Transmission  Distribution.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
IAEA International Atomic Energy Agency Milestones in Development of a National Infrastructure for Nuclear Power Infrastructure Issue: Management C.R.
ICS Area Managers Training 2010 ITIL V3 Overview April 1, 2010.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
CARILEC. An Association of Electric Utilities CARILEC An Association of Electric Utilities The Caribbean Electric Utility Service Corporation (CARILEC)
Operations as a Competitive Weapon
Session: Enabling Technologies for Energy Resiliency
Uniper Energy Services
János Krutzler Hungarian Atomic Energy Authority
AAEA Role in Improving EPR Coordination Interventions among Arab Countries Abdelmajid Mahjoub Arab Atomic Energy Agency
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
Enron Energy Services Energy Management Outsourcing Overview
مستلزمات بناء المحطات النووية ضو مصباح الهيئة العربية للطاقة الذرية
Communication and Consultation with Interested Parties by the RB
Leadership and Management for Safety
Regulatory Oversight of HOF in Finland
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Operations Management Introduction to operations Management 1.
Group B4. - Management. - Human resources development. - Financing
Nuclear Energy Programme Implementing Organisation
Presentation transcript:

International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP

International Atomic Energy Agency 2Grid Characteristics of Nuclear Power Plant (1)  Capital intensive but low fuel cost  Operator prefers large size unit operated in base load (not in frequency control/load regulation)  Regional interconnection of grids enables increased size NPP  (R  G) Preference to large size. However, sudden disconnection of a large scale NPP from the grid (reactor trip/scram) creates serious disturbance to the connected grid (frequency change)  Reactor trip to secure nuclear safety by sensing (BWR case) Low/High level of reactor water High neutron flux High containment pressure Excessive flow in Steam line Low vacuum in condenser High radiation in reactor building High acceleration (earthquake) etc.

International Atomic Energy Agency 3Grid Characteristics of Nuclear Power Plant (2)  (R  G) Once disconnected from the grid, the reactor takes time to resume power operation (considering influence to fuel)  (G  R) Reliability/quality of the grid influences transient/safety of NPP. In the case of frequency change//interruption/isolation from grid:  [Ex.] Frequency drop  reduced coolant flow  change in reactivity  Isolation  Reactor transient (power-coolant mismatch to fuel due to decrease of coolant flow by pump trip, reactor overpressure due to loss of steam exit to Turbine) and  Isolation  Potential safety issue (loss of power to safety systems etc.) Unless appropriate protection & control system in the NPP system design to prevent serious effect to reactor system are in place; Automatic trip of reactor (reactor protection system) Separation of plant electric system from the degraded grid Reliance on DC battery Emergency power source (DG, Gas Turbine) Steam bypass system

International Atomic Energy Agency 4 Grid In a relatively early stage of NP planning: Assessment of reliability/quality of grid and of the need to enhance it  General guidance on grid/NPP interface in the IAEA document: “Interaction of Grid Characteristics with Design and Performance of Nuclear Power Plants: A Guidebook, Technical Reports Series No. 224” (1983)  Assessment during the process of site selection (impact on economics from strengthening grid performance)  Need collection of information on the characteristics of the current power system and their projection to the time NPP is built & operated (connection with other grids, load curve, stability, quality, availability of replacement power in case of outage, automatic load shedding etc)

International Atomic Energy Agency 5  Phase I NEPIO to looks at:  Existing grid and generating capacity in relation to the available NPP technology  Anticipated future growth of grid capacity & potential for grid interconnections to improve grid characteristics  Stability and reliability of the electrical grid  Phase 2 Owner/Operator/Utility, based on detailed studies to determine the necessary expansion, upgrade or improvement, plan  for grid enhancement and/or expansion  for increase or strengthening regional interconnects to achieve acceptable grid reliability  for providing redundant, reliable sources of off site power for the NPP  for funding & schedule for implementation (compatible w/NPP schedule)Grid

International Atomic Energy Agency 6  Phase 3 Utility to implement the plan established in phase 2  Ensure coordination of grid operations (central grid operations) with NPP operations,  Verify the completion of all upgrades and enhancements to the grid and interconnects  Install and test the redundant off site power supplies to the NPP. Grid

International Atomic Energy Agency 7 Industry involvement & Procurement  Many commodities, components and services to construct, operate and maintain NPP  Opportunities for the growth of regional economy & stimulating science & technology  What happens if a component fails and the original manufacturer cannot provide replacement in a timely manner or is not in the market anymore?  Owner/Operator, together with EPC company, to discuss  Supply chain including local participation for stable O&M  Potential for localization and/or strategic alliance with the original vendors (Some Owners Group coordinates the purchase of replacement and upgrades)  Qualification of local suppliers (Compliance with the codes and standards and under rigorous quality programmes)  Access to and handling of design information

International Atomic Energy Agency 8 Industry involvement : Phase 1 NEPIO to assess;  National and local industrial capabilities,  Interest of business / industrial leaders in participating in the NPP project considering the special requirements necessary,  Necessary investment for intended upgrading of industrial facilities And develop  Short term and long term policies on the level of local participation

International Atomic Energy Agency 9 Industry involvement : Phase 2 In preparation of bid specification, Owner/Operator/Utility to consider;  Which national or local suppliers can reliably supply commodities, components or services to nuclear related or non-nuclear portions of the NPP,  What upgrades in skills and capabilities are realistic in a time frame to support nuclear construction, And to determine;  Bid specification in accordance with those decisions. Local manufacturer  Planned domestic industry involvement should be called out in the bid specification and will have to be negotiated with NPP supplier.

International Atomic Energy Agency 10 Industry involvement : Phase 3 Owner/Operator/Utility  Reassessment of the sources of supply to support O&M  If the national and local industrial structure has progressed sufficiently, the supply of spare parts, consumable supplies, maintenance services and services can be allocated accordingly Local manufacturer  Necessary qualification  Localization (technology transfer)

International Atomic Energy Agency 11 Procurement Phase 1: NEPIO to  Recognise the need for a procurement policy consistent with the industrial participation policy,  Consider a strategy to assure the necessary expertise in Industry/Operator is developed in a timely manner Phase 2: Owner/Operator/Utility to  Develop procurement programmes and procedures  Develop formal procurement specifications and vendor lists Phase 3: Owner/Operator/Utility to  Establish its own procurement organization with the programmes and skills necessary to conduct nuclear related purchasing of equipment and services  Establish outsourcing policy and extent of own technical expertise in O&M stage

International Atomic Energy Agency 12 …Thank you for your attention