TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~

Slides:



Advertisements
Similar presentations
Bob Hirosky, UVa 7/27/01  Level 2 Processor Status  Bob Hirosky The University of Virginia 
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Dennis Coyne Excomm Jan 26, 2004
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
SSD Ritter Review June 20, 2012 The Silicon Strip Detector an overview and introduction Jim Thomas Lawrence Berkeley National Laboratory.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Craig Drennan Linac and Booster Beam Diagnostics Proton Source Workshop December 7 and 8, 2010.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Response to TeV BLM Review Report (Beams Doc 1147) 1 Recommendation # 1: …the BLM upgrade be done Response to #1: Great - thankyou for this endorsement.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Beam Transport AIP Beam Transport to Delivery Ring Instrumentation and Controls Update Brian Drendel December 15, 2014.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
P. Shanahan June 13, Near Detector Electronics Status Status Production Issues Peter Shanahan FNAL MINOS Collaboration Meeting June 13, 2003.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
F Booster Long Straight Corrector Upgrade Technical Status and Schedule for Installation Craig Drennan DOE Tevatron Operations Review March 27, 2007.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
DTOS FAQ Speed is the key for the future PM : Jimmy Hsu Ext : 7298 (Version 1.5)
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
6 Oct 2003Vince Pavlicek1 Make a BPM out of a Damper?
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
S. Pordes TeV BLM Review 4/19/04 1 Motivation for replacing present system: => Requirements on replacement system => Motivation for architecture of proposed.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
Tevatron BPM Upgrade Stephen Wolbers DOE Review February 25, 2004.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
S. Pordes TeV BLM Review 4/19/04 1 Motivation for replacing present system: => Requirements on replacement system => Motivation for architecture of proposed.
Amsterdam, Oct A. Cotta Ramusino, INFN Ferrara 1 EUDRB: status report and plans for interfacing to the IPHC’s M26 Summary: EUDRB developments.
Beam Loss Monitor Upgrade J. Lewis Run 2 Meeting 27 January 2005.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
TBPM Front-End Software Design Review
LAPP BPM Read-out Electronics
HEMODYNAMIC SIMULATOR II P09026
Upgrading the Digital Component of the Bunch Current Monitors
ECAL electronics schedule
CMX Status and News - post PRR -
CMX scope and functionalities
Status of TTF HOM Project Aug 9, 2005
DCM II DCM II system Status Chain test Schedule.
Presentation transcript:

TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~ Aug 2 In order to test the key components of the system with real beam, in real beam environment we will need: –1) >2 Digitizer Cards –2) Crate, Backplane –3) Timing Controller Card Readout using existing test stand CPU and EDB interface

TeV BLM Review 4/19/042 Tevatron BLM Review - Schedule BLM Replacement Production schedule: If digitizer tests are successful, and we pass a technical review we will order production quantities of parts. The remainder of the schedule is paced by the engineering effort required to design the other cards, and the system testing which involves the BLM project and machine people. The digitizer design is the responsibility of Craig Drennan. It is assumed here that all the other cards are the responsibility of Al Baumbaugh. If all goes well, we could have a full crate of pre-production cards to test by Feb 2005, this assumes 3 versions of digitizer card and 2 versions of all other cards. Single crate testing and modifications -- 3 months (Tevatron Only). This system is left in place to gain operational experience. Production, testing and installation of the full set of BLM Crates and systems -- 2 months + 2 months On this draft, system is available at the beginning of Sept. 2005

TeV BLM Review 4/19/043 Tevatron BLM Review Draft Schedule1 of 4

TeV BLM Review 4/19/044 Tevatron BLM Review Draft Schedule2 of 4

TeV BLM Review 4/19/045 Tevatron BLM Review Draft Schedule3 of 4

TeV BLM Review 4/19/046 Tevatron BLM Review Draft Schedule4 of 4

TeV BLM Review 4/19/047 Tevatron BLM Review - Schedule Boards can be designed in parallel. Schedule paced by available engineering; (layout and assembly resources are available) Could reduce overall time by ~ 3 months if more engineering effort is available remarks on draft schedule

TeV BLM Review 4/19/048 Tevatron BLM Review - Schedule BLM Replacement Current Status: Pre-Prototype Digitizer Card is in layout Analog Front end Testing nearly complete Backplane Schematic is nearly complete We are finalizing the specs in conjunction with Tevatron, Booster, and Main Injector personnel Work has started on Software for new CPU We are in the process of getting a sample 3U Crate from Rittal Architecture of the New CPU, Abort Controller Card, Timing Card, and EDB Interface Card are complete. Schematic work has not yet begun.

TeV BLM Review 4/19/049 Tevatron BLM Review - Schedule The full functionality of these systems requires ACNET front end software and application software to deal with the new BLM data structures. At installation the new BLMs will “look” like the old BLMs, which do not have the many buffers and abort modes of the new system. Initially we may read out the new BLMs through the old multibus BPM system. Software development will continue in both Host and front ends for some time.