Coal Creek Culvert Replacement Pacific Coast Salmon Coalition.

Slides:



Advertisements
Similar presentations
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Advertisements

Annual Stock Assessment – Coded Wire Tag Program (ODFW & WDFW) BPA Project Numbers: and
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Lolo Creek Watershed Project #
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Toppenish Creek Watershed ( ) Yakama Nation Division of Natural Resources.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
WRIA 8 Salmon Recovery Council 2007 SRFB & PSAR Grants Project Subcommittee Report & Recommendations July 19, 2007.
ESCAPEMENT GOALS? WE DON’T NEED NO STINKING ‘SCAPEMENT GOALS! Hal Michael Washington Department of Fish and Wildlife
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Aptos Lagoon: Habitat Use by Steelhead Trout & Tidewater goby Kristen Kittleson Fishery Resource Planner County of Santa Cruz.
March SRSRB Meeting.  The purpose of this discussion is to provide early feedback to project sponsors  Five Application Submitted 1. South Touchet RM.
Restoration Ecology 2011 Bradley Buckallew. Anadromous Born and spend juvenile life in freshwater Venture out into ocean to spend their adult lives Return.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Project Slide Show. This 1893 photograph is of the Prather pump in the Shasta River Canyon about five miles upstream of the mouth of the river. Large.
Drainage District #7 Pump Station Retrofits for Safe Fish Passage Ryan Bartelheimer, P.E. Snohomish Conservation District.
Location Coal Creek upstream of Coal Creek Parkway Photo Point 5A Camera Point 5 Bearing 192 ° Goal Monitor log movement Duration 5 years Regime 2 times.
FOREST PRACTICES 222 An Introductory Short ( Very Short ) Course.
Camera Point #4 Photomonitoring Project Coal Creek 10/14/08.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
Directions to Camera Point: Starting in the parking lot, cross the driving bridge and turn right downstream toward the third light post on the left. Stand.
Implementation of the Biological Opinion for Russian River Water Supply, Flood Control Operations & Channel Maintenance National Marine Fisheries Service.
Lake Sammamish Kokanee Conservation & Connections to the South Central LIO David St. John King County Department of Natural Resources and Parks and the.
Ryan Johnson Earth and Physical Science Department Western Oregon University Monmouth, Oregon
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Pataha Creek, 10% of Flow, RM 0.1 (L): 67degrees Tucannon River, 90% of Flow, RM 11 (R): 70 degrees.
Nez Perce Tribe Department of Fisheries Resource Management WATERSHED DIVISION FCRPS Biological Opinion Expert Panel “Gap Filling by Habitat Actions”
Evaluation of Fish Passage Improvement Projects in the South Coast and Rogue River Basins Duck Creek Associates Dylan Castle.
The Upper Lochsa and Progress Toward Restoration Rebecca A. Lloyd, NPT Watershed Division.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Coos Watershed Association Watershed Restoration Projects.
1 Testing the Ability of Native Cutthroat Trout to Pass Through Small Culverts on Steep Slopes N. Phil Peterson, Ryan K. Simmons, Jeffery T. Light Forest.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Fish and Game Commission Meeting October 8, 2014 Stafford Lehr Fisheries Branch 2014 Proposed Fresh Water Sport Fishing Regulation Changes.
Dungeness Watershed Action Plan Olympic National Forest.
Reconnecting Fluvial Westslope in Skalkaho Creek Is this working and how do we tell?
Lake Roosevelt Rainbow Trout Habitat/Passage Improvement Project No Jason McLellan Confederated Tribes of the Colville Reservation January.
Seattle City Light Stewardship Program Background: SCL stewardship work was contracted with SFEG to be conducted on the City’s lands purchased under the.
Fish and Game Commission Meeting February 5, 2014 Fisheries Branch Stafford Lehr Request for Emergency Regulatory Action.
Pam Jeane Deputy Chief Engineer- Operations Sonoma County Water Agency Habitat Enhancement and Water Delivery.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
2012 Triennial Regulation Proposals. Department Proposals District and Special Regulation Changes  Allow harvest of hatchery trout and steelhead in catch.
ODOT’s Fish Passage Program Ken Cannon, Aquatic Biology Program Coordinator John Raasch, Environmental Resources Unit Manager Susan Haupt, Geo-Environmental.
1 How the Water Board Protects California’s Water Quality Kate Hart, Board Member Chair Central Valley Regional Water Quality Control Board.
Salmon and Steelhead Conservation through adaptive management of water levels in the Jenner estuary NOAA’S National Marine Fisheries Service.
Tillman Creek Acquisition
ROAD HAZARD ASSESSMENT
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Project funded by: Wild Rivers Coastal Alliance
Fish Passage Barriers & Salmon Recovery
Crow/Quartz Creek Instream Large Wood Recruitment
Salmon Habitat and Still Creek Restoration
North Fork Teanaway Large Wood Trapping Implementation
Results & Discussion Cont. Acknowledgements & References
Sand Deposits and Flooding Along the San Jacinto River
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Stream Connectivity in the Clark Fork Watershed
Taneum Creek PIT Tag Interrogation Site
Leveraging Funding from Other Sources: a Programmatic Approach
State Water Board Order WR95-17: MMWD Compliance Reporting
Stream Crossing Replacement Policy
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

Coal Creek Culvert Replacement Pacific Coast Salmon Coalition

Project Description  Coal Creek is a tributary to the Dickey River. The Dickey River and its’ tributaries provide abundant low-gradient habitat for spawning and rearing Coho, Steelhead and Cutthroat. The Dickey drainage is known as one of the top Coho smolt producers (measured by square kilometer of drainage) in Washington State. The Dickey confluences with the Quillayute River in the Quillayute Esturary.  The culvert on Coal Creek we will be addressing is under the 5000 line, a well used logging road. The current structure is a 96” CMP that is perched and undersized. The average stream width upstream is 14’ with a 20” outfall drop that plunges directly onto large rip rap, placed to protect the road, creating an obstacle to salmonid migrating upstream to access the habitat above the blocking culvert. Because the pipe is undersized at the inlet there is a whirlpool effect that is resulting in bank destabilization. There is approximately 6’ of road fill covering the CMP.

Location  °N °W  8.2 Mile on 5000

Driving Directions From the stop light in Forks  Drive on HWY 101 for 1.4 miles  Turn left onto the La Push Rd. Drive 3 miles.  Turn right onto Quillayute Rd. Drive 3.7 miles.  Turn right onto Mina Smith Rd. Drive.07 miles.  Turn left onto the Drive 3.8 miles the culvert is directly under the road.

Map Project Site

Map

Drainage

Current Conditions  96” or 8’ Corrugated Metal Pipe  Under Sized  Perched  Degraded Pipe  2.9 Miles of inaccessible stream

Cost Estimate  Total Cost of the Project is $260,472  Rayonier 35% match is $91,165  Request from SRF Board $169,307

Budget

RMAP Project Requirements  Project is not solely mitigation. Project is not Mitigation  Project is an expedited action ahead of the Department of Natural Resources approved RMAP schedule. Project is currently scheduled for 2016  Expedited actions do not include RMAP projects that might be delayed beyond their originally scheduled completion date. It will be 4 years earlier  Project must provide a clear benefit to salmon recovery. It opens almost 3 miles of habitat  There will be harm to salmon recovery if the project is delayed (i.e., not completed earlier than the scheduled RMAP completion date). 3 miles of habitat, inaccessible  Large landowners must provide 35 percent match for fish passage projects and 50 percent for sediment reduction projects. Meets 35% criteria and is a fish passage blockage

Priority  Listed in the North Pacific Coast Lead Entity Strategy, Appendix B: 2011 Project List as a priority project.

Proposed Structure  Big R style bridge  60’ long  16’ wide

Bridge Design

Design

Permit  HPA  FPA

Site Photos

Downstream

Outfall Drop

Inside the Pipe

Species  Coho  Steelhead  Cutthroat

Partners  Rayonier (Property Owner)  WDF&W  Quileute Tribe (Post Project Monitoring)

Questions?