DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries.

Slides:



Advertisements
Similar presentations
FEDERAL SPACE AGENCY International conference “Europe space policy: ambitions 2015” Session 1. “General view on propulsion systems: LV of the future”
Advertisements

Институт прикладной математики им. М.В.Келдыша РАН Keldysh Institute of Applied Mathematics, Russian Academy of Sciences.
Space conveyer Space conveyer Results of Advanced Research.
1 Air Launch System Project Proposal February 11, 2008 Dan Poniatowski (Team Lead) Matt Campbell Dan Cipera Pierre Dumas Boris Kaganovich Jason LaDoucer.
Babakin Space Center, Space Research Insitute, Makeev Rocket Design Bureau COSMOS ONE: THE FIRST SOLAR SAIL a project of The Planetary Society with Cosmos.
Attitude Determination and Control
AAE450 Spring 2009 Attitude Determination in Low Earth Orbit Description: Research Attitude Determination Systems Filter Pertinent Reference Material from.
Unit 2 GEOSTATIONARY ORBIT & SPACE SEGMENT
1 NATIONAL PROGRAMMME National Space and Aeronautics Programme – AEROSPAŢIAL – Space Exploration Subprogramme M I N I S T R Y OF E D U C A T I O N A N.
Spacecraft Design and Sizing Dr Andrew Ketsdever MAE 5595 Lesson 14.
Spacecraft Launch Vehicles
The project of the scientific - educational small satellite for research of Earth upper atmosphere density Prof. Igor Belokonov
Aerospace Engineering By Patrick Ferrell. Aerospace Engineering is the main branch of engineering concerned with the research, design, development, construction,
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Recent Development of EO Satellite in Vietnam Assoc. Prof. Dr. Pham Anh.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
Launch System Launch Vehicle Launch Complex Orbit Insertion Orbit Maneuvers.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
Chapter 23 Space Transportation Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
Dr Mark Cresswell Satellite Sensors EG5503.
DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries.
1 Samara State Aerospace University (SSAU) Modern methods of analysis of the dynamics and motion control of space tether systems Practical lessons Yuryi.
1 Head of Russian Federal Space Agency ISS Program International Cooperation Paris, June 17, 2009.
A3 Altitude Test Facility
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
Attitude Determination and Control System (ADCS)
Satellites and Launch Vehicles. “Gee Whiz” Facts Number of satellites currently in orbit is over 900 Satellites orbit at altitudes from 100 miles (Low.
Dynamic Design: Launch and Propulsion Genesis Launch Vehicle: The Delta Rocket Student Text Supplement.
Different Coverage Patterns for a Single Satellite and Constellation of Satellites in Real Time with the STK Pedro A. Capó-Lugo Graduate Student Dr. Peter.
© Lavochkin Association, 2013 Ganymede Lander mission overview.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
COMT 3911 Satellite Basics COMT 391 Wireless. COMT 3912 Satellite Components Satellite Subsystems –Telemetry, Tracking, and Control –Electrical Power.
факс: +7 (846)
BY- JAY PATEL( ) AAKASH PATEL ( ) URVISH SONI( ) GUIDED BY:DR. K PRIYAN &PROF. SNEHAL POPLI CIVIL & STRUCTURAL ENGG DEPT.
CAPACITY Operational Atmospheric Chemistry Monitoring Missions CAPACITY Final Meeting - WP Ground Segment synthesis Final Meeting ESTEC02/06/05.
AIAA RM Second ATS at UCCS Polar-Orbiting, Passive, Atmospheric Calibration Spheres (POPACS) Presented by R. Gilbert Moore Director, Project.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
Guidance and Navigation
Mir Space Station Presented By: David Garnetti. Brief History of Mir The first space shuttle docked with Mir in 1986 The first space shuttle docked with.
DSL Distributed Systems Laboratory ATC 23 August Model Mission: Magnetospheric Multiscale (MMS) Mission Goal “To study the microphysics of three.
Space Station Will it be accessible for You and Me?
Space platform and Orbits Introduction to Remote Sensing Instructor: Dr. Cheng-Chien LiuCheng-Chien Liu Department of Earth Sciences National Cheng Kung.
The structure of control and data transfer management system for the GAMMA-400 scientific complex A.I. Arkhangelskiy a, S.G. Bobkov b, M.S. Gorbunov b,
Space Systems LaboratoryMassachusetts Institute of Technology SPHERES Development of Formation Flight and Docking Algorithms Using the SPHERES Testbed.
UNCLASSIFIEDUNCLASSIFIED Lesson 2 Basic Orbital Mechanics A537 SPACE ORIENTATION A537 SPACE ORIENTATION.
Spacecraft: A vehicle or device designed for travel or operation outside earth’s atmosphere.
GMAT9205 – Fundamentals of Geopositioning Gael Desliens
The Shuttle Transportation System Produced by Loren Fletcher (click picture)
CRICOS No J a university for the world real R ENB443: Launcher Systems Image Credit: ESA Caption: The generic Ariane-5 (Ariane Flight 162) lifting.
March /5/2016 At A Glance STARS is a real-time, distributed, multi-spacecraft simulation system for GN&C technology research and development. It.
MARS ORBITER MISSION (MANGALYAAN) PRESENTED BY,PRESENTED BY,RAMYA.K M.TECH COS 1 st yrM.TECH COS 1 st yr.
© ИАЦ КВНО ЦНИИмаш Собственность ИАЦ. All rights reserved GLONASS Status and Progress Sergey Revnivykh CGSIC Meeting , Savannah, GA, US.
S PACE FOR E DUCATION, E DUCATION FOR S PACE AO/1-8224/15/NL/ND E Pavol Valko December 2015.
Characteristics of remote sensing satellites. Satellites generally vary in their architecture Usually remote sensing satellites are having two plateforms.
SATELLITE ORBITS The monitoring capabilities of the sensor are, to a large extent, governed by the parameters of the satellite orbit. Different types of.
Categories of Satellites
Space Robotics Seminar On
AE Review Orbital Mechanics.
Preliminary Platform Design for KuaFu-A
Liquid LVs propellant consumption control terminal system
Technical Resource Allocations
Design and realization of Payload Operation and Application system of China’s Space Station Wang HongFei 首页.
Measurements of the Moon by CLARREO Pathfinder and ARCSTONE
LAUNCH OF GEO STATIONARY SATELLITES
SDO Flight Dynamics Subsystem
Development and Principles of Rocketry
By: Faith Yizek 9H and Alex Neacsu 9M
Main information on the «WORLD SPACE OBSERVATORY» project
Presentation transcript:

DISTRIBUTION AMONG INDUSTRIES Space industry Power industry Rail transportation Different industries

CONTROL SYSTEMS FOR INTERCONTINTAL BALLISTIC MISSILES

CONTROL SYSTEMS FOR LAUNCH VEHICLES

GNC SYSTEM FOR LV TO LAUNCH SATELLITES AND SPACECRAFTS

GNC SYSTEM FOR LV TO LAUNCH SATELLITES AND SPACECRAFTS

CONTROL SYSTEM FOR DNEPR LAUNCH VEHICLE Dnepr LV features: it is a middle-class LV for space vehicle injection into the Earth circular and elliptic orbits; booster ( two stages ) is a part of 15A18 missile withdrawn from action; upper ( the third ) stage is a derivative from warheads delivery stage of 15A18 missile. New features of upper stage: - repeated main engine firing and new scheme of its operation; - additional low-powered motive installation for stage stabilization while coasting; launch – from silo launch facilities, Baikonour. CS Performance : LV mission and motion control at phases of pre-launch preparation, launch and space; vehicle placing into required orbit; it is derived from CS for 15A18 missile by means of modification both HW and SW; combined error of injection comes to: - for orbit altitude, km - 4; - for angle of orbit inclination, ang. min - 2,5; duration of injection, hours - up to 1,0.

CONTROL SYSTEM FOR ROKOT LAUNCH VEHICLE ROKOT LV features: booster ( two stages ) is a part of 15A35 missile withdrawn from action; upper ( the third ) stage is a specific developed one. It provides repeated main engine firing and controlled coasting flight: launch will be made from launch pad, Plesetsk. CS Performance: LV mission and motion control at phases of pre-launch preparation, launch and space vehicle placing into required orbit; it is designed for the ROCOT LV specially, with up-to- date componeuts use; combined error of injection comes to: − for orbit altitude, percentage up to 1,0; − for angle of orbit inclination, ang. min up to 2,5; duration of injection, hours - up to 7,0.

CYCLONE-4 LV features: it is a middle - class LV for space vehicle injection into a near- earth circular or elliptic orbits; its upper, the third, stage is a specific developed one and provides repeated main engine firing and controlled coasting flight; it is intended to be launched from an equatorial launch site. CS Performance: it provides LV mission and motion control at phases of pre- launch preparation, launch and payload placing into required orbit; it provides stages equipment check at all phases of LV mounting and testing; it is designed with up-to-date components use; to improve injection accuracy it is equipped with INS and GPS based navigation subsystem; combined error of injection comes to: - for orbit altitude, km up to 1,5; - for angle of orbit inclination, 2..3 ang. Min; duration of injection, hours - up to 3,5. CONTROL SYSTEM FOR CYCLONE-4 LAUNCH VEHICLE

CONTROL SYSTEMS FOR SPACECRAFTS TSELINA family Their orbit altitude were of km. 84 ones were launched. Some of them operate up to the present OCEAN family Their circular orbits had an altitude about 500 km. 5 spacecrafts were launched. Some of them operate up to the present – 1984 KOSMOS family They were placed into geostationary orbits and allowed the imaging of the Earth surface. System «Oko»

CONTROL SYSTEMS FOR SPACECRAFTS ARKON Spacecraft for Earth remote sensing. Apogee km. Perigee km. 1997, KORONAS Automatically guided orbital station for study of solar activity. It operates up to the present COUPON The first component of space segment for satellite intercommunications and data communications system BANKER. (geostationary orbit). 1997

CONTROL SYSTEMS FOR MODULES OF STATION «MIR»  «Kvant», «Kvant-2», «Kristall», «Spectr», «Priroda»  Docking with station «Mir»  Delivery of the scientific apparatus, PLs and propellant  Control of the station «Mir» motion Orbits: Circular km

PERFORMANCE DATA OF CONTROL SYSTEM (CS) FOR SUPPLY SPACECRAFT-MODULE (SSM) AND FUNCTIONAL AND CARGO UNIT (FCU) Peculiarity: CS is installed in power unit FCU that is the first component of the ISS ALPHA; FCU CS is a modification of basal control system which was qualified completely during preparation and mission of modules QUANTUM-2, CRYSTAL, SPECTRUM and NATURE. Development chronology-1994…1997. Performance data of the CS for FCU is in accordance of those for the SSM. In addition the FCU CS will provide the specified spatial orientation during docking to FCU of the rendez -vous module NODE1 Unity delivered by re-used spacecraft SHUTTLE as well as the orientation of joint structure FCU+NODE1 during direct docking of SHUTTLE the next time; This CS can be used to construct other components of the ISS ALPHA. To expand the CS functionality and to upgrade its performance it can be supplemented with additional HW and SW. Such modification will provide combined operation of FCU CS and CS of other ISS components as well as the operation of ISS different configurations during its assembling and operation.

ISS: Final configuration The 1 st phase of the ISS assembling: FCB "Zarya" + NODE-1 in autonomous flight during ~ 600 days Phase of the ISS assembling: FCB "Zarya" + NODE-1 perform docking to service module «Zvesda» ISS «ALPHA»

SC name, date of launch Egyptsat-1, МS-2-8, МS-2-8М, 2013 Purpose Remote sensing of Earth. Remote sensing of Earth. Scientific data acquisition for investigation of space plasma characteristics. Remote sensing of Earth. Testing of ammoniac propulsion system. Tasks for control system Building of orbital orientation. Turns of SC into required direction. Control of SC sub-systems hardware and PL. Processing of command information. Building of orbital orientation. Turns of SC into required direction. Control of SC sub-systems hardware and PL. Processing of command information. Building of orbital orientation. Turns of SC into required direction with accuracy, which provides operation of PL having high resolution. Control of SC sub-systems hardware and PL. Processing of command information. Control system units OBC, angular rate meter based on fibre-optic gyroscopes, astro-measurement system, magnetometer, electromagnetic actuator, fly-wheeled actuator. OBC, set of angular rate meters based on fibre-optic gyroscopes, astro- measurement system, magnetometer, multi-unit attitude sensor, electromagnetic actuator, fly-wheeled actuator. OBC, set of angular rate meters based on fibre-optic gyroscopes, astro-system with 2 optical blocks, magnetometer, electromagnetic actuator, fly-wheeled actuator. Control systems of spacecrafts for remote sensing of Earth

Strap-down inertial navigation system Purpose: - initial alignment of inertial system; - definition of LV navigating movement parametres. Weight ………………32 kg Autonomous initial alignment: azimuth ……………5-7 ang. min horizon ……………10-15 ang. sec Accuracy of insertion into a solnechno-synchronous orbit: height ………………9,5 km inclination …………12 ang. min

Strap-down astroinertial block The strap-down astroinertial block is intended for measurement of spacecraft angular movement parametres and calculation of instrument system co-ordinates orientation parametres in inertial system co- ordinates. Error of a absolute angular speed vector projection determination: - without calibration in orbital flight – 5,0 · deg/sec; - after calibration in orbital flight – 1,0 · deg/sec. Error of a attitude determination – 15 ang. sec; Innovative aspects and main advantages: Astrocorrection allows to use rough fiber-optical gyroscope as a angular speed measuring instrument in strap-down astroinertial block. The gyroscope zero deviation estimation in flight mode and adjustment mode is provided for strap-down astroinertial block accuracy increase. Areas of Application: The strap-down astroinertial block is used as a structure of a spacecraft orientation and stabilisation control system. Stage of development: The device is at a pre-production model stage of development.

HARTRON MAIN ACHIEVEMENTS IN SPACE ACTIVITIES DURING YEARS OF INDEPENDENCE 1994 – SC injection in the frame of program «Koronas»; 1998 – launch of functional cargo module «Zarya» - Russian segment of the «Alpha» ISS; 1998 – docking of «Zarya» with Shuttle. Formation of cluster – «Zarya» «NODE-1», 600 days of flight with «NODE-1»; 1999 – start of commercial launches of the «Dnepr» launch vehicle; 2000 – automatic docking of the «Zarya» module with the «Zvezda» module ; 2000 – start of commercial launches of the «Rockot» launch vehicle; 2003 – launch of the «Strela» launch vehicle; 2007 – injection of the «Egyptsat-1» satellite for Earth remote sensing; 2008 – injection of the KOSMOS-2440 SC for Earth remote sensing; 2009 – launch of the «Cyclone-3», «Dnepr», «Rockot» launch vehicles; 2010 – first flight testing Strap-down inertial navigation system «Ros-1»; 2011 – second flight testing Strap-down inertial navigation system «Ros-1», launch of SC MS-2-8 (Sich-2).

Hartron offers of cooperation options in space sphere 1. Earth remote sensing from space: - design of remote sounding of the Earth satellites orientation and stabilisation control system; - design of satellite onboard data acquisition subscribers software. 2. Satellite navigation: - design of SC navigation software. 3. Satellite communication: - design of communication satellites orientation and stabilisation control system; 4. Ground infrastructure: - design of telemetry information processing software; - design of software for the operative control and the analysis SC flight in command center. 5. Scientific-technical researches: - increase reliability and autonomy functioning of SC control system methods; - design high-precision strapdown stellar-inertial SC control system; - high-speed SC with elastic elements control methods.

6. Education of experts: - construction of theoretical principles of SC control systems; - automated technology design and testing onboard computers of SC control systems software; - technology of optimisation of SC control systems on test stands; - onboard and land computer complexes operational systems; - principles of SC control in flight. Hartron offers of cooperation options in space sphere

Thanks for attention! © RPE Hartron-Arkos, 2011

CONTACT Ukraine, 61070, Kharkov, Akademika Proskury str, 1 Ph.: +38(057) Fax: +38(057)