PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.

Slides:



Advertisements
Similar presentations
Technical Support /7/08 PHENIX WEEKLY PLANNING 8/7/2008 Don Lynch.
Advertisements

PHENIX WEEKLY PLANNING 9/13/2007 Don Lynch. 9/13/2007 Weekly Planning Meeting 2007 PHENIX Shutdown April-June 2007: Complete run, De-mount HBD West, Begin.
PHENIX WEEKLY PLANNING 1/17/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 6/7/2007 Don Lynch. 6/7/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day No More Planned Remove.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
Technical Support /5/08 PHENIX WEEKLY PLANNING 6/5/2008 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 5/31/2007 Don Lynch. 5/31/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6 or 6/13/07?
Technical Support /12/08 PHENIX WEEKLY PLANNING 6/12/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /26/08 PHENIX WEEKLY PLANNING 10/2/2008 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 4/10/2008 Don Lynch. 04/10/08 Shutdown ’08 Schedule Purge Flammable Gas, Magnet & DAQ TestsDone Remove lock-out & open shield wallDone.
PHENIX WEEKLY PLANNING 5/24/2007 Don Lynch. 5/24/2007 Weekly Planning Meeting 2 Schedule End of Run Party 6/29/07 Next Maintenance Day 6/6/07 Remove HBD.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Technical Support /4/08 PHENIX WEEKLY PLANNING 9/4/2008 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Technical Support /17/08 PHENIX WEEKLY PLANNING 7/17/2008 Don Lynch.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Technical Support /1/08 PHENIX WEEKLY PLANNING 5/1/2008 Don Lynch.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
Technical Support /14/08 PHENIX WEEKLY PLANNING 8/14/2008 Don Lynch.
3/6/ PHENIX WEEKLY PLANNING March 6, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 8/9/2007 Don Lynch. 9/9/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Technical Support /8/08 PHENIX WEEKLY PLANNING 5/8/2008 Don Lynch.
PHENIX WEEKLY PLANNING 12/6/2007 Don Lynch. 12/6/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 12/27/2007 Don Lynch. 12/27/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
Technical Support /19/08 PHENIX WEEKLY PLANNING 6/19/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Technical Support /28/08 PHENIX WEEKLY PLANNING 8/28/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/20/2008 Don Lynch. 3/20/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
Technical Support /26/08 PHENIX WEEKLY PLANNING 6/26/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Technical Support /15/08 PHENIX WEEKLY PLANNING 5/15/2008 Don Lynch.
PHENIX WEEKLY PLANNING 1/24/2008 Don Lynch. 1/17/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
PHENIX WEEKLY PLANNING 6/28/2007 Don Lynch. 6/14/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set up5/ ?
PHENIX WEEKLY PLANNING 12/20/2007 Don Lynch. 12/20/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn GoingOn Going.
PHENIX WEEKLY PLANNING 7/26/2007 Don Lynch. 7/26/2007 Weekly Planning Meeting 2007 Summer Shutdown Schedule ItemStartComplete RPC Factory set upStarted.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
PHENIX WEEKLY PLANNING 1/31/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going Switch.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
Technical Support /22/08 PHENIX WEEKLY PLANNING 5/22/2008 Don Lynch.
1 7/9/2009 PHENIX WEEKLY PLANNING 7/9/2009 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
Presentation transcript:

PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch

3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane design review On Going On Going Next scheduled Maint. Day?NoneNone7 Mu Trigger FEE Prototype testsDoneDone Complete new beampipe designDoneDone End PP run3/103/10 Low energy Run3/113/12 End of Run 83/123/12 Shutdown ’09 starts3/123/12 Install new UPS3/153/31 Install Gas house UPS’s4/156/13 End of Run Party6/306/30

3/6/2008 Weekly Planning Meeting3 Design Reviews CM Crane (analyses complete need meeting with ) (Set up review tomorrow) MMN Scaffolding (design submitted to C-A for review) New Beampipe Review (ready for review, drawings sent to vendor for quote) Station 1 Scaffolding (DESIGN IN PROCESS) Mu Trigger FEE N & S 3/19 (Need to secure date) RPC Prototype 3/25 (Prototype design, installation, gas system, electronics, safety) (Need to secure date) MuTrigger N & S rack platform 4/21-5/2 (On deck for design) RPC Stations 1, 2 and 3 ~ 6/22-6/20 VTX/FVTX review~ 6/1-8/31 NCC Review ~ 6/1-8/31 MMS scaffolding (< 2009)

3/6/2008 Weekly Planning Meeting4 New Beampipe Design & Review HBD BBC CM NCC/ RXNP MPC MMN MMS` NCC/ RXNP CM BBC Be ss

3/6/2008 Weekly Planning Meeting5 New Beampipe Design & Review

3/6/2008 Weekly Planning Meeting6 CM Crane Uses Gorbel 1-ton capacity Ceiling mounted Bridge Crane, modified to be supported by 2 Steel Channels attached to CM Bridge and hoist to be removed for running. Crane Design under review Received questions and comments from Steve Kane & John Hynan. Will set up review by end of this week.

3/6/2008 Weekly Planning Meeting7 New Platform 8’ x 2.5’ Muon Trigger Rack Platforms HBD/RXNP MuTrgrFEE NMuTrgrFEE S VTX FVTX NCC N NCC S RPC1 S RPC1 N New Platform 8’ x 2.5’ Future Rack requirements to be discussed tomorrow at Integration Meeting

3/6/2008 Weekly Planning Meeting8 MMN Scaffolds

3/6/2008 Weekly Planning Meeting9 MMN Scaffolds Design is complete. Drawings sent to C-A Station 1 Scaffolding under way

3/6/2008 Weekly Planning Meeting10 Mu Trigger FEE Cable Management: AWG LV cables for North + fibers AWG LV Cables for South + fibers Need power and water to racks Need to consider RPC2 N installation MMN Cable Management

3/6/2008 Weekly Planning Meeting11 Station 1 Scaffolds

3/6/2008 Weekly Planning Meeting12 Station 1 Scaffolds

3/6/2008 Weekly Planning Meeting13

3/6/2008 Weekly Planning Meeting14 Shutdown ’08 Schedule CM Crane ReviewFeb-Mar 15 New Beam Pipe DesignFeb Complete Run 8Mar 12 MuTrigger Prototype TestsFeb 27-March 15 Purge Flammable GasMar Remove lock-out & open shield wallMar 14 RPC Prototype C tests (in tent)Feb- Mar Disassemble & store shield wall & baseMar Beam pipe design reviewmid Mar Mu Trigger ReviewMar 19 RPC Prototype engineeing & safety reviewMar 24 IR Crane certificationMar 14 Remove CollarsMar Disconnect EC & move to AH Mar 17-April 4 Inventory/test assembly of MMN scaffoldApr Install CM access stairsApr 7-11 RPC Prototype D tests (in tent)Apr-May

3/6/2008 Weekly Planning Meeting15 Shutdown ’08 Schedule, cont’d Design RPC installation fixtures & FEE platformsApr-May MuTrgr Platform reviewmid Apr Move MMS South(MuTr Decaps?)Apr 15 (tax day) DC/PC west work ?Apr 1-30 Install CM CraneMay Remove North access & MMN 4 lampshades May Move CM southMay 1 Install Station 1 North scaffoldingMay 1 Station 1 North decapsMay Prep work for Mutrgr platforms (water/elec)May-June Prep work for RPC proptotype installMay-June End of run Party May 30 Erect MMN scaffoldingJune MMN decapsJune-July RPC engineering & safety reviewmid June MuTrigger FEE N InstallJuly HBD InstallJuly-August

3/6/2008 Weekly Planning Meeting16 RPC prototype gas systemJuly Move shielding for RPC prototype installationJuly RPC prototype cable routing & supportJuly Modify crystal palace & vapor barrierJuly Install MuTrigger FEE N platformJuly RPC prototype installAugust Install RPC prototype rack in tunnel southAugust Install Mutrigger FEE’s in MMS for RPC testAugust Install MuTrigger FEE South platformAugust Install MuTrgr N&S rack cooling & electricAugust Install MuTrigger N cooling water & airAugust Replace tunnel shieldingSept Connect electronics/gas/water/air for RPCSept. Install MuTrigger N& S racksSept. Remove all installation equipmentOct. Prep for run 9Oct Close shield wall start shifts Nov Start physicsDec. Shutdown ’08 Schedule, cont’d

3/6/2008 Weekly Planning Meeting17 Other Work VTX, FVTX and NCC prototype support Integration Physical and Rack space Infrastructure upgrades New Counting House Door VTX Prototype for run 8 ?

3/6/2008 Weekly Planning Meeting18 Safety, Security, Etc. : Training: JTA’s: everyone up to date (except Carter CPR needs to get credited) Req’d: pretty good shape. Nothing critical lacking. Rad worker 2 can hold off until later. Maybe we can get the RPC tunnel areas de-posted Expiring this month: Jimmy& Frank: Haz Com Me: Phenix awareness Coming Soon: BNL approves Flex time and telecomuting

3/6/2008 Weekly Planning Meeting19 5 Year Plan 2008 Install stations 1& 2 of MuTr FEE upgrades (north), 1 octant Cu absorber (S), 1 half otants each RPC2/3 S, MMN sta. 2 scaffolding, MuTr Sta 1 N&S scaffolding, 1 octant of MuTrigger FEE upgrades (south, sta 1 & 2), MuTr N stn. 1 & 3 decaps, MuTrigger rack platforms (N&S), CM crane, remove/replace beampipe, infrastructure upgrades & repairs, misc. subsystem work, 1 RPC rack in South tunnel, MuTrgr FEE N & S racks 2009 Remove HBD & RXNP, scaffolding in MMS, MuTr S stn. 1 & 3 decaps, RPC2 N, RPC3 N, north Cu absorbers, partial VTX, iFVTX, MuTrgr S sta 1 & 2, MuTrgr S rack, 2 racks in N tunnel, infrastructure upgrades & repairs, misc. subsystem work 2010Remainder of VTX barrel, partial FVTX, south Cu absorber completed, MuTrgr FEE stn. 3 S, any remaining MuTr decaps, infrastructure upgrades & repairs, misc. subsystem work 2011RPC1 N&S, NCC N, remainder of FVTX, DC West upgrade/repair, remove absorbers, infrastructure upgrades & repairs, misc. subsystem work 2012NCC S, upgrades contingency & wishlist, infrastructure upgrades & repairs, misc. subsystem work, TBD new and improved upgrades * Years refer to the shutdown year and follow the run with the similar number (i.e. work in 2008 is to be done in the shutdown that follows run 8, and so on)

3/6/2008 Weekly Planning Meeting20 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info We’ve reached the end of run 8 The Shutdown starts next week and we have lot’s of work to do.