Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October.

Slides:



Advertisements
Similar presentations
By: Richelle DeCuir Title 1 Wetlands Workshop January 15, 2004 Hi, Im Richelle DeCuir from CenLA. Im concerned because Louisiana supplies the largest port.
Advertisements

US Army Corps of Engineers BUILDING STRONG and Taking Care of People! Ecosystem Restoration Along the Los Angeles River: Creativity within Concrete Dan.
Feasibility Study Overview Louisiana Coastal Area Ecosystem Restoration 19 September 2000.
Restoring and protecting Louisiana’s coast January 18, 2011 CPRA Meeting David Peterson Asst. Attorney General and AG Designee to CPRA Civil Division Lands.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Business Council of New Orleans Louisiana’s Future May 2, 2012.
The Coastal Wetlands Planning, Protection and Restoration Act Presentation for the National Science Teachers Association Meeting New Orleans, LA November.
US Army Corps of Engineers BUILDING STRONG ® Louisiana Coastal Area Modification of Davis Pond Study Overview Governor’s Advisory Commission on Coastal.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
Southeast Louisiana Flood Protection Authority – East (SLFPA-E) and Pontchartrain Levee District Recommendations for Early Emergency Restoration Projects.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
Coastal Texas Protection and Restoration Project
US Army Corps of Engineers BUILDING STRONG ® North Atlantic Coast Comprehensive Study U.S. Army Corps of Engineers Coastal Storm Risk Management Planning.
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
1 Technological Innovations and Future Vision of Technical Support Louisiana Coastal Protection and Restoration and Mississippi Coastal Improvements Program.
Integrated Ecosystem Restoration and Hurricane Protection: Louisiana’s Comprehensive Master Plan for a Sustainable Coast.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
LCA Mississippi River Hydrodynamic and Delta Management Study (MRHDMS) Carol Parsons Richards River Studies Manager Governor’s Advisory Commission on Coastal.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Cypress Restoration of the Bayou Bienvenue Central Wetland Unit Sarah K. Mack Environmental Scientist.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Beneficial Use at Deer Island A Decade of Design and Implementation Presented by Walter Dinicola, P.E., and Wendell Mears Anchor QEA, LLC George Ramseur.
EPA and Flood Risk – Programs and Perspectives Rob Wood Acting Deputy Office Director Office of Wetlands, Oceans and Watersheds U.S. Environmental Protection.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
1 New Orleans District Morganza to the Gulf 23 May 2008 Carl Anderson, Senior Project Manager, USACE.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Coastal Restoration Project Selection in Louisiana: From CWPPRA to CIAP The Challenges of Natural Resources Economics & Policy Conference New Orleans,
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Update on the SOUTHWEST COASTAL LA Project Governor’s Advisory Commission Meeting August 7, 2013 Abbeville, LA committed to our coast.
Coastal Restoration Updates September 10, 2007 Coastal Restoration Updates September 10, 2007 Louisiana Department of Natural Resources Louisiana Department.
Recreational Impacts of Coastal Restoration Projects CNREP Presentation Joseph Berlin May 28, 2010.
Roseau River Flood Damage Reduction Project Roseau, Minnesota.
Mississippi River Long Distance Sediment Pipeline Project Louisiana Office of Coastal Protection and Restoration Coastal Protection and Restoration Authority.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama and Mississippi.
US Army Corps of Engineers ® Engineer Research and Development Center Hydrodynamic, Water Quality, and Ecological Modeling to Assess System-wide Impacts.
“There are only two kinds of levees, those that have failed and those that will fail.”
July 20, 2011 Coastal Protection and Restoration Authority Deepwater Horizon Early Restoration.
The Science and Policy of Louisiana Coastal Ecosystem Restoration.
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
Central & Southern Florida Project George Horne Deputy Executive Director Operations & Maintenance Resource Area.
Consistency with the 2012 Coastal Master Plan: Guidelines for Restoration Projects Receiving State Funding Bren Haase CPRA Board Meeting September 18,
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
LCA Program State Concerns Moving Forward February 25, 2010 Kyle Graham Governor’s Office Coastal Activities.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Climate Change Threat Sea-Level Rise 1. Potential Impacts from Sea-Level Rise How might our community be impacted by sea-level rise? 2.
Wetlands Workshop Presented by Em LeBlanc. Let’s go on a Field Trip!
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Hydrology of Louisiana’s Wetlands Loss of Wetlands The coastal wetlands are eroding at exceedingly high rates. In the 1970s, when land loss rates were.
Mississippi River Industries Vocabulary Flood Control Misc. 5 pt 5 pt
Continuing Authorities Program
Louisiana Coastal Area
Beneficial Use of Dredged Material
Davis Pond Freshwater Diversion – Status of MR&T Project and LCA Study 9/11/2012 Status Briefing for BTNEP Management Conference.
Fab-Five Projects New Orleans FY19-FY23
Challenges and Opportunities in Addressing Climate Change
Presentation transcript:

Building Strong 1 1 MRGO Ecosystem Restoration Plan Feasibility Study Gregory Miller Senior Project Manager Corps of Engineers New Orleans District October 2009

Building Strong 2 2 Study Background MRGO was authorized by Congress in 1956 as Federal navigation channel to provide a shorter route between the Port of New Orleans and the Gulf of Mexico. In 2006, Congress directed the Secretary of the Army, through the Chief of Engineers, to develop a plan for de- authorization of deep-draft navigation on the MRGO. In June 2008, USACE/ASA(CW) transmitted the MRGO Deep Draft De-authorization Report to Congress, officially de-authorizing the MRGO from the Gulf Intracoastal Waterway (GIWW) to the Gulf of Mexico.

Building Strong 3 3 Authority WRDA 2007 Section 7013 (P.L effective Nov. 8, 2007) INCLUSIONS — At a minimum, the report … shall include— –a plan to physically modify the Mississippi River-Gulf Outlet and restore the areas affected by the navigation channel; –a plan to restore natural features of the ecosystem that will reduce or prevent damage from storm surge; –a plan to prevent the intrusion of saltwater into the waterway; –efforts to integrate the recommendations of the report with the [LCA] …and the [LACPR] analysis and design …; and –consideration of— use of native vegetation; and diversions of fresh water to restore the Lake Borgne ecosystem.

Building Strong 4 4 Study Area Areas affected by the MRGO navigation channel + Lake Borgne Ecosystem SE Louisiana and SW Mississippi

Building Strong 5 5 Lake Borgne Ecosystem Subunits

Building Strong 6 6 Subunits Potentially Affected by MRGO +1.1 ppt +0.4 ppt +1.9 ppt +2.3 ppt +4.5 ppt Mississippi River Gulf Outlet Pass Manchac North Shore Little Woods Chef Menteur Pass Bayou La Loutre Average Salinity Increases Post 1963

Building Strong 7 7 Study Purpose and Scope Produce Feasibility Study and EIS to support construction Develop Comprehensive Ecosystem Restoration Plan for the Lake Borgne ecosystem and areas affected by MRGO Measures to reduce or prevent damage from storm surge Fully address WRDA 2007 Sec through supplement to MRGO Deep-Draft De-Authorization Report

Building Strong 8 8 Study Planning Approach Collaborative Inter-Agency Team Comprehensive Geographic Information System (GIS) of Existing, Authorized and Proposed Projects, Infrastructure, Environmental Resources and Data Team Workshops and Seminars –LCA and LACPR “Lessons Learned” –Cost Effectiveness/Incremental Cost Analysis –Hydrodynamic and Water Quality Modeling Data-Sharing Website Interactive and On-going Public Involvement

Building Strong 9 9 Public Involvement To Date –Early Coordination with Potential Non-Federal Sponsors (States of Louisiana and Mississippi) –Stakeholder Office Visits –NEPA Public Scoping Meetings –Central Wetlands Restoration Planning Forum –Public Website –Recreation Focus Group –Monthly Updates to St. Bernard Parish Coastal Zone Advisory Committee

Building Strong 10 Study Area Problems Decreased fresh water, sediment and nutrient inputs Hydrologic modifications Saltwater intrusion Wetland loss Ridge habitat degradation and destruction Bank and shoreline erosion Altered circulation and water quality Habitat change and land loss Invasive species Retreating and eroding barrier islands The MRGO Ecosystem Restoration Plan Feasibility Study will address the following problems:

Building Strong 11 Study Goals Restore the Lake Borgne ecosystem and the areas affected by the MRGO navigation channel. Restore natural features of the ecosystem that will reduce or prevent damage from storm surge. Achieve ecosystem sustainability to the greatest degree possible.

Building Strong 12 Study Objectives 1. Meet or maximize the ability to meet salinity targets. 2. Create 9,510 acres of cypress swamp habitat in the Central Wetlands over the period of analysis. 3. Create/nourish 6,720 acres of fresh/intermediate marsh in the study area over the period of analysis. 4. Create/nourish 29,930 acres of brackish marsh in the study area over the period of analysis. 5. Convert 4,210 acres of shallow open water to saline marsh in the study area over the period of analysis. 6. Improve and increase ridge habitat in the study area over the period of analysis. 7. Create/restore critical landscape features that provide hurricane and storm damage risk reduction in the study area (i.e. areas located in the Biloxi Marshes, the East Orleans Landbridge and the Manchac Landbridge, and forested habitats).

Building Strong 13 Existing Conditions –Channels and canals have altered hydrology –Saltwater intrusion has resulted in habitat switching –Mississippi River levees have eliminated the periodic floods that provided freshwater, sediment and nutrients –Relative sea level rise, tropical storms, shoreline erosion, and other factors contribute to land loss –Majority of the study area is classified as Essential Fish Habitat (EFH) –Study area includes critical habitat for threatened Gulf Sturgeon

Building Strong 14 Management Measures Evaluated Freshwater, sediment, and nutrient introduction Wetland restoration and creation Shoreline protection Bank stabilization Ridge protection and restoration Barrier island restoration Water control (gates, weirs, sills, plugs, fill areas, etc.) Hydrologic restoration Use of native vegetation Modifications to authorized projects The MRGO Ecosystem Restoration Plan Feasibility Study is evaluating the following types of management measures:

Building Strong 15 Screening Results Management Measure Type Measures Initially Evaluated Measures Carried Forward Measures Remaining Riverine Diversions4381 Hydrologic Restoration - Filling/Narrowing Water Control Structures2640 Marsh Creation Using Dredged Material Shore Protection Restoration/Creation of Forested Habitat - Vegetative Planting Swamp Restoration/Creation556 Ridge Restoration55162 Barrier Island Restoration311 SAV Projects221 Artificial Oyster Reefs in the Biloxi Marshes100 Coastal Mississippi Ecosystem Restoration100 TOTAL

Building Strong 16 Remaining Components of the Final Array

Building Strong 17 Initial Array of Alternative Plan Strategies –No action –Restoration to pre-Mississippi River and Tributaries (1928) conditions –Restoration to pre-MRGO conditions –Maintenance of the existing quantity and quality of wetlands in the entire study area –Enhancement of the quantity and quality of wetlands in the study area beyond the existing condition –Restoration of habitats affected by the construction of the MRGO navigation channel –Maintenance of the existing acreage of wetlands in planning units adjacent to MRGO and Lake Borgne

Building Strong 18 Initial Array of Alternative Plan Strategies Restoration to pre-Mississippi River and Tributaries (1928) Conditions SCREENED OUT DUE TO STUDY CONSTRAINTS – Human constraints: land development, flood protection projects, and the presence of public infrastructure and travel corridors. – The physical processes that formed the marsh have changed, e.g. sediment loads in the Mississippi River are lower. – Recovery through the restoration of key natural processes may require decades or even centuries to fully realize benefits at significant costs.

Building Strong 19 Initial Array of Alternative Plan Strategies Restoration to Pre-MRGO Conditions SCREENED OUT DUE TO STUDY CONSTRAINTS – It is estimated that it would require approximately million cubic yards of dredged material, $2.8 billion, and from 15 to 44 years to fill the channel from mile 60 to mile 25.* Filling the entire channel is not efficient, because the resources required could be used in other ways to produce greater benefits in less time. – Human constraints, e.g. Lake Pontchartrain and Vicinity project, limit the ability to restore natural processes. *MRGO LEIS 2008

Building Strong 20 Maintenance of the Existing Quantity and Quality of the Wetlands in the Entire Study Area SCREENED OUT AS INFEASIBLE – The Pontchartrain Basin is predicted to lose approximately 103,000 acres by 2060 assuming existing relative sea level rise (RSLR) and 113,000 acres assuming accelerated RSLR.* – According to the National Research Council of the National Academies and the LACPR study team, sustaining the entire Basin may not be possible.* – High rates of land loss in the Maurepas Swamp and the Delta contribute to high projected loss rates for the entire study area.* * LACPR Coastal Restoration Appendix (USACE 2009) and Drawing Louisiana's New Map: Addressing Land Loss in Coastal Louisiana (National Research Council of the National Academies 2006) Initial Array of Alternative Plan Strategies

Building Strong 21 Initial Array of Alternative Plan Strategies (continued) Enhancement of the Existing Quantity and Quality of the Wetlands in the Study Area SCREENED OUT AS INFEASIBLE As maintaining the existing quantity and quality of the wetlands in the study area was determined to be infeasible, this alternative plan strategy, which goes beyond maintenance, was also determined to be infeasible.

Building Strong 22 Alternative Plan Strategies Carried Forward for Further Consideration –No action (Plan Strategy A) –Restoration of Habitats affected by the Construction of the MRGO (Plan Strategy B) –Maintenance of Existing Acreage of Wetlands in Planning Units Adjacent to MRGO and Lake Borgne (Plan Strategy C)

Building Strong 23 Salinity Targets for All Plan Strategies On 20 April 2009 the Salinity Working Group validated the use of the 1984 Bonnet Carrè Study targets for the MRGO Ecosystem Restoration Plan

Building Strong 24 Alternative Plan Strategy C Wetland Acreage Maintenance Subunits

Building Strong 25 Habitats Affected by MRGO* Navigation Channel and Spoil Bank 3,400 acres of fresh and intermediate marsh 10,300 acres of brackish marsh 4,210 acres of saline marsh 1,510 acres of cypress swamp and forested wetlands 4,800 acres of shallow open water converted to deep water or disposal TOTAL 24,200 ACRES 3,350 acres of fresh and intermediate marsh to brackish marsh 8,000 acres of cypress swamp to brackish marsh 19,170 acres of brackish marsh & swamp to saline marsh 3,400 acres of adjacent marsh lost due to increased tides and salinity TOTAL 33,920 ACRES * 1956 to From Habitat Impacts of the Construction of the MRGO (USACE 1999) DIRECT IMPACTSINDIRECT IMPACTS

Building Strong 26 Restoration of Habitats Affected by MRGO Plan Strategy B MINIMUM ALTERNATIVE RESTORATION PLAN STRATEGY TO MEET STUDY AUTHORITY CREATE/NOURISH, NO MAINTENANCE 6,720 acres of fresh and intermediate marsh 29,930* acres of brackish marsh 4,210 acres of saline marsh 9,510 acres of cypress swamp and forested wetlands 3,400 acres of additional marsh adjacent to the channel 53,700 ACRES TOTAL *Includes 460 acres of erosion between

Building Strong 27 Maintain Existing Acreage of Wetlands in Planning Units Adjacent to MRGO Plan Strategy C POTENTIAL MAXIMUM FEASIBLE ALTERNATIVE RESTORATION PLAN STRATEGY Includes the creation of habitat type acreage for Plan Strategy B. Maintain existing wetland acreage in identified subunits through the period of analysis.

Building Strong 28 Planning Subunit 13 Central Wetlands Total Land – 19,576 acres Total Water – 1,677 acres Total Land – 15,081 acres Total Water – 6,172 acres

Building Strong 29 Subunit Problems Land loss Saltwater intrusion Habitat changes Water quality issues Subsidence Lack of nutrients in soils Changes to natural hydrology (MRGO, Paris Road, old logging canal spoil banks) Hazardous, toxic, and radio- active waste and materials Nutria and invasive plant species Paris Road flooding concerns Land rights issues / lack of clear titles in Orleans Parish portion The area is largely impounded Hazards in the area (sunken boats, debris and pipelines) Tropical storm events

Building Strong 30 Central Wetlands Land Loss

Building Strong 31 Central Wetlands Habitat Change 1956

Building Strong

Building Strong 33 Subunit Opportunities RELATED PROBLEMS ADDRESSED Saltwater intrusion Habitat changes Water quality issues Lack of nutrients in soils Changes to natural hydrology TERTIARY TREATMENT OF WASTEWATER THROUGH WETLANDS ASSIMILATION AND/OR FRESHWATER DIVERSION

Building Strong 34 Subunit Opportunities (Continued) MARSH AND SWAMP CREATION THROUGH PLACEMENT OF FILL AND PLANTING RELATED PROBLEMS ADDRESSED Land loss Habitat changes Water quality issues Subsidence Lack of nutrients in soils Storm damage risk reduction

Building Strong 35 Potential Central Wetlands Restoration Measures Potential Effluent Diversion Locations Potential Riverine Diversion Locations Potential Swamp / Marsh Restoration Locations

Building Strong 36 Central Wetlands Swamp / Marsh Restoration Based on 1956 Habitat Types Cypress Swamp Marsh Creation Marsh Nourishment Open Water Areas Present in 1956 Maintained

Building Strong 37 Study Work Remaining Obtain Rights of Entry to conduct surveys, soil borings, and environmental investigations Refinement of environmental impact and benefit evaluations Feasibility-level engineering Develop Alternative Formulation Briefing package Second Agency Technical Review (Jacksonville District) Conduct AFB Prepare draft planning report Prepare Draft EIS Release public review draft and conduct IEPR Respond to comments Final Washington level reviews (Chief ’ s Report – ASA – OMB – Congress)

Building Strong 38 Upcoming Milestones –Complete Eng & Design Jan-09 –Technical ReviewJan-10 –Alternative Formulation Briefing Apr-10 –Draft Report/EIS CompleteMay-10 Public Comment Period following release of Draft Report

Building Strong 39 Additional Information on the Web History Fact sheets Reports Photos Document Library 39 GIS Map Viewer Public Meeting Info Presentations Project Video Interactive Comment Button

Building Strong 40 Questions?