Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group.

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
14 June 2007VELOEddy Jans 0 Recent VELO-installation++ activities June 14, 2007 Potmeter calibration Bake-out Cabling & Commissioning.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
14 February 2008VELO NikhefEddy Jans 0 Cooling and warm-up of the VELO under neon atmosphere conditions results (Jan 28  30) implications.
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
MICE Hydrogen Safety Functions IEC61508 Compliance & Emergency Procedures MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Martin van Beuzekom, STD6 14 th September Outline: Introduction to LHCb and VErtex LOcator (VELO) Status of VELO Beamtests Upgrades Summary LHCb.
The LHCb VErtex LOcator Olaf Behrendt on behalf of the VELO group Novosibirsk,
Quality assurance related to system integration of the VELO detector. Jan Buytaert, CERN On behalf of the VELO collaboration. November 4, 2011 Workshop.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
1 GL th IIF/IIR Gustav Lorentzen Conference on Natural Working Fluids Bart Verlaat National Institute for Subatomic Physics (NIKHEF) Amsterdam, The.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
AIDA Traci commissioning LHCb – CO 2 cooling meeting 18 March 2015 Kamil Wojdyla, Lukasz Banasik, Nicola Spadavecchia, Tomasz Kucharski, Piotr Dziurdzia,
Limits of the current VTCS Ann Van Lysebetten Bart Verlaat Martin van Beuzekom VELO upgrade meeting 14/11/2008 pix module construction kick-off 09/11/2009.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
Dec
Eddy Jans 0 Vertex2013 Operational aspects of the VELO cooling system of LHCb Eddy Jans (Nikhef) on behalf of the LHCb VELO group Introduction Main components.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group July 28, 2008Vertex 2008: 17th International.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
19 December 2006Eddy Jans Annual Scientific Meeting0 The advent of the VELO introduction sensors mechanics vacuum motion cooling PU-modules installation.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
CMS TK II cooling Brainstorming P. Tropea (update after meeting on June 13 th with Duccio, Antti, Hans, Jerome, Paolo, Bart) 20 June 2016.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
VELO Replacement Girish Patel University of Liverpool.
13 May 2011 Eddy Jans 0 Plans for the VELOpix-module LHCb-Nikhef discussion some specifications some requirements some ideas about the VELOpix-module some.
9 December 2011Eddy Jans 0 LHCb-VELO CO 2 cooling plans CO 2 - meeting Present VELO - physics running in LongShutdown1 2013& physics running.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Developing Radiation Hard Silicon for the Vertex Locator
Simulated vertex precision
DT Infrastructure: LV, HV, Gas
LHCb Velo: commissioning, performance and High flux tests.
Commissioning and Testing the LHC Beam Interlock System
Pixel CO2 Cooling Status
FNAL Production Experience
ROD assembly and test in US
Module production in Italy
VELO-meeting January 25, 2007 Sub-projects: SX & SX
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
LHC Morning Meeting - G. Arduini
Setup for testing LHCb Inner Tracker Modules
Monday 27th August & night
Presentation transcript:

Power Up of the First VELO Module at IP8 Eddy & Olaf on behalf of the VELO group

2 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Goal operate one VELO module with the final components and control software of every subsystem [cooling, vacuum, LV, HV, interlocks, DAQ] investigate the possibility to switch on several modules under Neon atmosphere check noise level compared to the assembly lab check integrity of the module

3 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Temperature Management VELO module: R- and  -sensor 2 x 16 Beetle chips [~ 2 x 15 W] hybrid core: thermal pyrolytic graphite [TPG] Cooling: 2-phase CO 2 full VELO half is cooled simultaneously Safety [interlock system]: LV switched off if NTC temperature > 30 ° C cooling block x y z Temperature Monitoring: on the cooling blocks: PT100 on the hybrid: 2 x NTC per side Beetle PT100 NTC

4 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Programme adjust position of the VELO halves to give maximal tolerance for  p while cooling turn on warm cooling of the C-side with backup chiller gradually switch on and configure the hybrid operate the hybrid with sensor bias [HV] During this procedure: carefully watch  p and hybrid temperature take data for important configurations  P = P beam - P detector  [-5,+2 mbar]

5 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Logbook 08:01 cooling: started 11:15 hybrid: configuration of all Beetles on phi-side with testpulses 11:22 vacuum: Neon injection (delta p reaches maximum value) 11:23 hybrid: reconfiguration of all Beetles on phi-side without testpulses 11:23 cooling: base plate heating switched on 11:38 hybrid: phi side switched off 11:42 hybrid: configuration of all Beetles on R-side without testpulses 11:48 hyrid: reconfiguration of all Beetles on R-side with testpulses 11:59 hybrid: Beetle configuration: R-side: all without testpulses, phi-side: only even Beetles without testpulses 12:03 hybrid: configuration of all Beetles of both sides without testpulses 12:18 hybrid: Beetle configuration: phi-side: all without testpulses, R-side: all with test pulses 12:35 hybrid: LV for both sides switched off 14:28 hybrid: Beetle configuration of all Beetles of both sides without test pulses 14:51 hybrid: control cable of R-side by mistake disconnected, causes LV to be switched off 15:00 hybrid: control cable reconnected, Beetles of the R-side switched on again with (!) testpulses 16:14 HV: start of taking IV-curve on the phi-side (unsuccessful attempt) 16:20 HV: start of taking IV-curve on the R-side (unsuccessful attempt) 17:14 HV: start of taking IV-curve on the phi-side 17:40 HV: start of taking IV-curve on the R-side 18:00 hybrid: Beetle configuration of all Beetles of both sides without testpulses (Beetles stayed with LV on) 18:17 HV: switching off for both sides 18:22 hybrid: LV for both sides switched off

6 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Neon Pressure difference [mbar] Accumulator = Cooling set point Cooling Cookie HX003 RF-Foil (Close to module) Module Base average March (Hour) Temperature (ºC), Pressure (mbar)

7 March 27, 2008Eddy & Olaf Nikhef VELO-meeting III III VIV Temperature History  -side on, R-side off II.R-side on,  -side off III.R-side on,  -side half on IV.both sides on V.both sides off current  -side [A] NTC temp.  -side [°C] Cooling Cookie temperature

8 March 27, 2008Eddy & Olaf Nikhef VELO-meeting PV301 open DP [mbar]  P ≈ 0.2 mbar

9 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Sensor Noise without Bias R-side not CM corrected CM corrected

10 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Sensor Noise with Bias R-side not CM corrected CM corrected

11 March 27, 2008Eddy & Olaf Nikhef VELO-meeting Summary and Outlook Milestone in VELO commissioning reached: VELO module successfully operated with final components for all subsystems control software allowed reliable operation module M36 in good shape [IV curve similar to previous ones] noise level lower than in assembly lab operation of a few modules under Neon atmosphere should be feasible … 41 modules to go …