Prepared for: Prepared by: Masonville DMCF: Integrating Dredged Material Management with Environmental Restoration and Recreation Opportunities October.

Slides:



Advertisements
Similar presentations
Connecticut Brownfield Sites
Advertisements

Chesapeake Bay Commission Meeting November 8, 2012 Vienna Community Center Protecting the Nanticoke River: Saving the Landscape Tim Brower Land Acquisition.
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Northwest Region Cleanup Program Zidell Waterfront Property Cleanup 2012 Portland Scott Manzano | Oregon Department of Environmental Quality.
Spoil to Splendor: A Story of Chesapeake Bay Island Restoration Presented by Christopher P. Guy, Peter C. McGowan And Robbie Callahan U.S Fish and Wildlife.
Don Edwards San Francisco Bay National Wildlife Refuge Where Wildlife Comes First!
Civil Works Baltimore District River and Harbor Projects.
Northeast Corridor Greenway Acquisition City Council Workshop November 12, 2013.
Eastern Kentucky PRIDE Personal Responsibility Responsibility In A In A Desirable Desirable Environment Environment.
Transportation Enhancement Activities Expanding transportation choices, increasing recreation opportunity and access, revitalizing economies.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Brownfields are “real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous.
Green Infrastructure Planning for working landscapes, natural resources and other open spaces.
Landscape Ecology, Urban Forestry & Wetlands.  Woody vegetation in populated places  25% of forest canopy in US.
June 23, 2007 Alternatives Brainstorming Workshop Brisbane Baylands Specific Plan EIR.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
Chesapeake Bay Watershed Public Access Plan. The Strategy for Protecting and Restoring the Chesapeake Bay Watershed was released in May 2010, in response.
Preserving our environment Fostering collaboration among our communities.
Prepared for: Prepared by: A Tutorial for Identifying a Project-Specific Dredged Material Placement Site October 2012 Bill Goodfellow Kaitlin McCormick.
Wetland Creation Why and How Char Ison and Caleb Asbury.
ANACOSTIA RESTORATION Indicators: How They Are Helping Achieve Water Quality Goals? SWRR April 2006 Meeting Ted Graham, Metropolitan Washington Council.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Shoreline Master Program Update First Review of Preliminary Draft Shoreline Master Program City of Wenatchee April 15,
Shoreline Master Program Update First Review of Preliminary Draft Shoreline Master Program [Entity] [Month Day, 2009] 1.
KITSAP SMP TASK FORCE Reconvened Meeting #1 November 9, 2011 Draft SMP Progress Update.
Ms. Mandel  I can explain what a Brownfield site is.  I can explain how a Brownfield site is restored to a usable piece of property.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Drafting the New Chesapeake Bay Agreement, Goals and Outcomes – Decision/Actions From Management Board Meetings June 13 and 18, 2013.
Andrew Heath Executive Director PA Growing Greener Coalition 1.
FY APPROVED UNDER REVISION TOTAL
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Coastal Management Issues and Strategies: State and Municipal
BOOKER CREEK WATERSHED PLAN WATERSHED ASSESSMENT WETLAND ASSESSMENT POLICY FRAMEWORK.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
Recreational Trails Program Federal Requirements.
U.S. Department of the Interior U.S. Geological Survey CBP Partnership Team- Enhance Monitoring in the Bay and its Watershed Scott Phillips, USGS Jonathan.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
October 3, 2014 Santa Ana Regional Board Wetlands Restoration Opportunity LOS CERRITOS WETLANDS, ORANGE COUNTY.
Prepared for: Prepared by: Nutrient TMDLs and Their Effect on Dredging Operations in the Chesapeake Bay 24 October 2012 William J Rue- EA Engineering,
Crystal Cove State Park Los Trancos Facilities Improvements Project SCH No Orange Coast District California State Parks November 2013.
Prepared for: Prepared by: Identifying and Constructing a Dredged Material Placement Site while Protecting a Unique Coastal Freshwater Marsh October 2012.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
Environmental Factors In this module, we will discuss: Environmental legislation Environmental hazards Due diligence Conducting an environmental.
Fran Dunwell Hudson River Estuary Coordinator Hudson River Estuary Program/NYSDEC.
Photo point 2 1 / 2 miles Trees ● Challenges to Restoring 4,400-acre Skaggs Island to tidal marsh: The site is subsided ~6 - 8 feet on average >
Conservation Provisions of the 2002 Farm Bill Farm Security and Rural Investment Act of 2002.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Case Study – A Brownfield Cleanup in the City of Amsterdam, NY Joseph S. Campisi Geomatrix Consultants, Inc.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
For EBTJV meeting October 26, 2010 Executive Order Strategy for Protecting and Restoring the Chesapeake Bay Watershed.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
The Woodlawn Landfill Site A Case Study in the Values and Methods of Ecological Revitalization.
United States Department of Agriculture Natural Resources Conservation Service NRCS Programs Applicable to Brownfields Natural Resources Conservation Service.
1 Introduction to Ecological Re-Use Concepts: ITRC Technical and Regulatory Guidance Document 2006 Brownfields Conference Boston, Massachusetts Charles.
Laurie Carroll Sorabella Inspiring a Community to Restore a River.
Restoration of the Swan Pond Embayment Michelle Cagley, Tennessee Valley Authority.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
GOOSE CREEK WATERSHED LEVEL I STUDY SCOPING MEETING
Sustainable Redevelopment
THE CORPS REGULATORY AUTHORITY
Reclaimed Water Funding
Pacific Flyway Center Open Space Preserve and Interpretative Educational Facility Applicant: The Pacific Flyway Fund LLC.
North Delaware Riverfront Greenway
Federal-aid Highway Program
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

Prepared for: Prepared by: Masonville DMCF: Integrating Dredged Material Management with Environmental Restoration and Recreation Opportunities October 2012 Jim Hulbert, Kaitlin McCormick, and Peggy Derrick

Masonville DMCF Background Masonville Dredged Material Containment Facility (DMCF) Components:  Maryland Port Administration (MPA) placement facility for dredged material from Baltimore Harbor  DMCF footprint is 141 ac, including 130 ac of open water 16 mcy capacity ~20 year site life Mitigation Requirements:  Offset fill of 130 ac of open water  Offset loss of 1 ac of vegetated wetland  Offset 10 ac of impacts to Chesapeake Bay Critical Area 2

Compensatory Mitigation Package Non-tidal and tidal wetlands creation and enhancement Reef and fish habitat improvement Eel passage installation Shad and herring restoration Trash interceptor installation Stream restoration Uplands clean-up and remediation Terrestrial habitat enhancement and diversification Conservation easement 3

4 footer Environmental Restoration

Community Enhancements Coordinated directly with citizen groups and non-profit entities Project Components  Environmental Education Center  Education and Research Allocation  ADA Water Accessibility (fishing pier and docking pier)  Walking Trails  Outdoor Education Facilities 5

Upland Clean-up Uplands Contamination  Legacy Dumping – telephone poles, railroad ties, tires, concrete and rubble  Historic Fast Land – created by placing municipal waste and other contaminated debris in open water Environmental Impacts  Remnant Debris – required characterization and removal/disposal  Soil Impacts – metals (arsenic, lead, mercury, chromium), PAHs (benzo-a-pyrene) – required characterization and remedial action 6

Upland Debris Clean up Debris Removal  6,280 tons telephone pole and railroad ties  700 tons concrete debris  146 tons scrap metal  31 tons of tires  7,466 tons misc. debris 7

Upland Remediation Remedial techniques include installing soil cap to eliminate contact with impacted surface soils:  Site characterization and risk assessment to determine remedial action (30 acres require capping)  Design of cap: Typical two foot clean soil cap Tree preservations zones Shoreline stabilization Non-tidal wetlands creation 8

9 Proposed Areas of Remedial Action

10 Proposed Improvements

Community Enhancements Education Center and programming:  National Aquarium  Living Classrooms  BayBrook 11

12 Nature Area Improvements Designed for ADA water access, passive recreation and educational opportunities:  Fishing pier and docking pier  3,000 feet of walking trails  Wetland creation  Stream restoration  Outdoor education areas

13 Shoreline Stabilization

14 Public Access Piers

Happy Ending Kaitlin McCormick Scientist/Project Manager 225 Schilling Circle, Suite 400 Hunt Valley, Maryland Scan this code to connect with EA Jim Hulbert Senior Scientist Masonville Cove Nature Area – Grand Opening for Public Water Access October 24, 2012