Winter Presentation Island 2000. Introducing ISLAND 2000.

Slides:



Advertisements
Similar presentations
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
Advertisements

Express Team University of New Mexico February 24, 2006.
Architect: Greg Miller, Georgia Tech Engineer: Stratton Newbert, Stanford Construction: Lori Huneryager, Stanford Apprentice: Forest Flager, Stanford Owner:
MEMBERS Introduction Architect: Angela Ribas UC Berkeley Engineer: Matthias Niebling Bauhaus-University Weimar, Germany Construction Manager: Kevin Coyne.
Mountain Ridge Project - final presentation - AEC The making of Ridge University Engineering Building E ngineerMartha DelCampo, Stanford A rchitectKatrin.
Bay team’s Output Engineer Yang, Yao-Hung Construction Manager David Walthall Architect Cindy Chan.
Picture Lake Geneva, Switzerland Surrounded by the Alps 20°C mean temperature in summer Annual snow fall – 30in Site Context.
W a v e Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice.
TeamMembers Architect: Angela Ribas UC Berkeley Engineer: Matthias Niebling Bauhaus-University Weimar, Germany Construction Manager: Kevin Coyne Stanford.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
University Health Building Thesis Final Presentation
2001 Winter Presentation. Site Location Site View.
Mountain Ridge Project - winter presentation - AEC The making of Ridge University Engineering Building E ngineerMartha Del Campo, Stanford, CA A rchitectKatrin.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Pacific University Architecture Katie Kozarek EngineeringChristian Heimple ConstructionDebbie Sit ApprenticeChristina Cho OwnerPeter Demian School of Engineering.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
construction manager Kit Fleming engineer Peng Li architect Xiang Liu owner Hans Verheij Collaboration in Cyberspace E X P R E S S T E A M C.
George Read Hall The University of Delaware
Reading Structural Drawings
RAHINAH IBRAHIM Stanford University Architect CRAIG LONG Kansas University Engineer JORGE FUENTES Stanford University Construction Manager ROXANNE ZOLIN.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos architect structural engineer construction manager Berkeley Georgia Tech Strathclyde, UK Luciana Barroso.
1 HVACR116 – Trade Skills Structural Drawings. 2.
R I V E R A rchitect Elena Paparizou Berkeley E ngineer Paul Kulseth Kansas C onst. Manager Wendy Wang Stanford O wner Jonathan Wong W i n t e.
Nick Szakelyhidi Structural Option Office Building Washington, DC Nick Szakelyhidi Structural Option.
Team Central Winter Presentationslide 1 of 65 Winter Presentation AEC Global Team Class 2002 Winter presentation Team Central.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Pacific Team Winter Quarter Presentation AMaria Zapata, Georgia Tech, Atlanta EAmir Kavousian, Stanford U, Stanford Xin.Zheng Lu, Tsinghua U, Beijing CKarthik.
Wood Construction CTC-375.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Mildred van der ZwanArchitect - TUDelft Valerie OuEngineer – Stanford Diego AvilesConstruction Manager - Stanford Daniel KwonApprentice – Stanford Brooke.
Chapter 10 Architectural Design. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Distinguish.
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Project Introduction  New high-tech classroom and lab facility  Area : 30,000sq.ft.  Function –To provide a home for innovative courses that take a.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Architect (K.U.) ADAM GUMOWSKI V p A c i e w Engineer (S.U.) JASON STONE C.M. (S.U.) BOB FARMAN Winter Quarter Presentation acific P niversity.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
200 Minuteman Drive New Design for Additional Floors and Vibration Sensitive Equipment Brent Ellmann Structural Option Dr. Linda Hanagan - Consultant.
Student Health Center Jacob Brambley - AE (structural option)
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
The Mountain Ridge Team Mountain Ridge Team Final Presentation The Ridge University Engineering Building May 15, 1998 Architect: Humberto Cavallin Engineer:
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Final Presentation of Bay Engineer Yang, Yao-Hung ConstructionManager David Walthall Architect Cindy Chan.
TeamMembers Team members of the Team members of the Angela Ribas
Competency: Draw wall sections and details.
Lucas Pettinati Rafael Monzon Andreas Dinopoulos
Commercial Building Project Portfolio
Team Introduction Collaboration in Cyberspace
PACIFIC TEAM SPRING QUARTER PRESENTATION
The Mountain Ridge Team
Mountain Ridge Project
Mississippi Riverbank Project (Final Presentation) May 14, 1999
North Shore at Canton The Pennsylvania State University
Presentation transcript:

Winter Presentation Island 2000

Introducing ISLAND 2000

Jonathan Wong Michael Hughes Renee Elsdon Jonghoon Kim Group Presentation March 10, 2000

ISLAND 2000 Project Overview : Design a new engineering center to replace an existing 3 story building at Island University, Florida.

ISLAND 2000 Project Overview : One building has a square footprint and one has an L- shaped footprint.

ISLAND 2000 Project Overview : Requirement: The palm tree grove must be preserved, and some internal spaces must have views to the grove.

ISLAND 2000 Project Overview : Requirement: Interior organization is based upon the affinity table.

The AFFINITY TABLE Auditorium Faculty Lounge Tech. support Computer Room Secretaries Faculty Offices Chair’s Office Senior Admin. Storage Instructional Lab Student Offices Small Class Seminar Large Classrooms * Size of bubble directly relates to required size of each room

THE PROCESS architect Aesthetics

A local site was selected to authenticate the project and aid in the architectural design process A local site was selected

That had a sandy, semi-populated beach And offered a sense of serenity

San Francisco Bay

ANGEL ISLAND

Quarry Beach

Site Contours Other University Buildings And Site Model

ISLAND 2000 Other “University” Buildings….

Don’t you want to be there?

ISLAND 2000 Q ualities of the site: Strong visual attraction to specific points on the horizon

Tilden Park/Berkeley Treasure Island/ Bay Bridge Chevron/ San Rafael Bridge ISLAND 2000 Q ualities of the site:

Nature of cove and hill forms gives the site a strong directional quality ISLAND 2000 Q ualities of the site:

ISLAND 2000 Cove form: radial directional quality ISLAND 2000 Q ualities of the site:

Hill Form: Sloping directional quality Beach/Bay Form: endless horizontal directional quality ISLAND 2000

Sense of seclusion; other campus buildings are located out of sight Q ualities of the site:

Structural engineer THE PROCESS architect Aesthetics Structure

ISLAND 2000 No seismic consideration Q ualities of the site:

ISLAND 2000 Building needs to be designed for 110 mph wind Q ualities of the site:

Advantages of Material Selection R/C BeamsR/C with composites TimberTimber w/ composites Strength Weight Weather Resistant Cost Effective Ductile Failure

Construction Manager owner Iterations between the members Structural engineer THE PROCESS architect Aesthetics Structure Planning Chooses

Construction Manager Structural engineer architect owner THE PROCESS Iterations between the members

RIDGE 1999 – SQUARE SOLUTION Option 1: E-A Iteration

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: RIDGE CONCEPT A plan with symmetry: And organized around the auditorium

Use wooden exterior to mirror material of environment and act as “skin” of building Use concrete for interior forms, relationship to malleable sand Interior organization edited to fit project requirements RIDGE 1999 – SQUARE SOLUTION ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: CONCEPT DEVELOPMENT

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: Iteration Process

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: Iteration Process

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: Wood en “Ski n” Wall Components Architecture Design Results

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: + Concr ete Space - Defin ing Walls Architecture Design Results Components

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: 1 st Floor Small Classroom Large Classroom Laboratory Seminar Auditorium Small Classroom Elevator Stairs Elevator Architecture Design Results

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: 2 nd Floor Architecture Design Results Auditorium Computer Room Seminar Lab Seminar Tech Support Student Offices Seminar Student Offices

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: 3 rd Floor Chair Lounge Faculty Offices Secretaries Elevator Stairs Elevator Architecture Design Results ChairAdmin

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: Sections Architecture Design Results Auditorium Auditorium is central element Auditorium is curvilinear in all dimensions Wall installed to support auditorium at the request of E-C

ARCHIT ECT RIDGE 1999 – SQUARE SOLUTION Option 1: Sections Architecture Design Results

ENGINEER RIDGE SQUARE SHAPE Option 1: ? *Elevated autditorium must be supported. *Integration of wood and concrete shear walls. *Adequate treatment of timber in corrosive envoronment.

40” Stee l Joist Gird ers 14” 16” oc (TYP) 2 nd Floor Plan 3 rd Floor Plan *Joist girders must span 50” over auditorium. *Joist supports concrete above. ENGINEER RIDGE SQUARE SHAPE Option 1:

RIDGE 1999 – SQUARE SOLUTION Option 1: Issues Cost of Piles as foundation Using concrete and wooden walls simultaneously leads to structural/construction problem Custom concrete shapes have high construction costs CONSTRUCTION

ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: A-E Iteration

ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: RIDGE CONCEPT Three grids embedded within the orientation of the walls

ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: RIDGE CONCEPT Three grids organizing the orientation of walls Using cantilevers to break out of L-shape Cantilever Overhanging System

Structure defines location of the auditorium (made to support a 50 ft span). Embed auditorium into hill-it does not need light Roof is important because of accessibility from hill, make it main entrance ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: CONCEPT DEVELOPMENT

ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: INITIAL REACTION

ARCHIT ECT RIDGE 1999 – L-SHAPE SOLUTION Option 2: ITERATION PROCESS

ARCHIT ECT RIDGE 1999 – L SHAPE SOLUTION Option 2: ITERATION PROCESS

PLANS and SECTIONS 1 ST FLOOR RIDGE 1999 – L SHAPE SOLUTION Auditorium Faculty Offices Storage Secretaries Admin Office Chair Office

2 ND FLOOR PLANS and SECTIONS RIDGE 1999 – L SHAPE SOLUTION Auditorium Storage Student Offices Small Class Large Class Lab Seminar Computer Lab Tech Support

3 RD FLOOR PLANS and SECTIONS RIDGE 1999 – L SHAPE SOLUTION Lab Small Class Large ClassStorage SeminarEntrance

PLANS and SECTIONS 1 ST FLOOR 2 ND FLOOR 3 RD FLOOR RIDGE 1999 – L SHAPE SOLUTION

PLANS and SECTIONS RIDGE 1999 – L SHAPE SOLUTION Area of landscaping

ARCHIT ECT RIDGE 1999 – L SHAPE SOLUTION Option 2: LANDSCAPED ROOF/ENTRANCE PLAN PERSPECTIVE Congregational Areas

ARCHIT ECT RIDGE 1999 – L SHAPE SOLUTION Option 2: LANDSCAPED ROOF/ENTRANCE Example of concrete multifunc tional forms in Landscap e area

PLANS and SECTIONS 1 ST FLOOR RIDGE 1999 – L SHAPE SOLUTION AREAS OF FILL

ENGINEER RIDGE 1999 – L- SHAPE Option 2: Concret e Moment Frames 12” Concrete Retaining Wall Found ation Plan *36” x 36” spread footing on stiff clay *12” x 10” concrete columns *36” Pile Foundations

Concrete Retainin g Wall Option 2 – L- Shape 1 ENGINEER RIDGE 1999 – L- SHAPE Option 2:

4”x6” Concrete Beams 2 nd Floor Plan 3 rd Floor Plan Concr ete Beams One - Way Conc rete Slab ENGINEER RIDGE 1999 – L- SHAPE Option 2:

Piles increase the costs of construction Excavation into hillside raises construction costs Auditorium needs high cost retaining walls Over-budget CONSTRUCTION RIDGE 1999 – L- SHAPE Option 2:

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: CONCEPTUAL IDEAS Use directional nature of the site and specific points on the horizon to generate form of the building

Establish Lines of Importance San Rafael Bridge Berkeley Treasure Island

These lines become circulation in the building Plan View Extrude the façade where The lines of sight intersect the facade

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: ITERATION PROCESS

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: ITERATION PROCESS

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: DESIGN FEATURES Circular Stairwell at intersection of circulation zones Radial Circulation Regions

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: 1 st Floor 2 nd Floor 3 rd Floor auditorium Large Class Small class Student Off. Seminar lab Tech support Computer Secretary Chair’s Office Senior Admin Faculty LoungeStorage Interior organization

ARCHIT ECT ISLAND 2000-L SHAPED OPTION Option 3: Section Cut Along an Axis Audit oriu m Extruded façade rooms

Foundat ion Plan *36” Cast- in-Place Piles *Intricate Stairwell Concept *Placing of Stairwell Columns ENGINEER ISLAND L- SHAPE Option 2:

2 nd Floor Plan 3 rd Floor Plan *Staircase support *3 rd Floor cantilever *Placement of interior columns *W14 x 50 columns *W14 x 36 beams Steel Moment Frames ENGINEER ISLAND 2000 – L-SHAPE Option 2:

ISLAND 2000-L SHAPED OPTION Option 3: Glass Staircase and Stairwell is expensive because of custom detailing Pile Foundation is expensive ISSUES CONSTRUCTION

ARCHIT ECT ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: CONCEPT Use the form and light qualities of the tree grove to create a concept for the engineerin g facility

CONCEPT Roof inspired by palm tree fronds Want to achieve a curved, light roof

ARCHIT ECT ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: ITERATION PROCESS

ARCHIT ECT ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: ITERATION PROCESS

PLANS RIDGE 1999 – L SHAPE SOLUTION 3 rd Floor Faculty, Admin, Chair, and Secretaries Offices 2 nd Floor Seminar, Auditorium, Lab, Seminar Student Offices 1 st Floor Classrooms, Auditorium, Lab, Seminar

PLANS RIDGE 1999 – L SHAPE SOLUTION Auditorium has access from both the first and second floor. Second floor walkways are visible from the interior of the auditorium.

ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: ENGINEER 12” Mat Footin g Founda tion Plan *Use of mat foundation *Diaphram continuity *Treated timber

ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: ENGINEER 2 nd Floor Plan *Use of mat foundation *Diaphram continuity *Treated timber *12” x 24” Glu-Lam beams 3 rd Floor Plan Glu- Lam Beams

ISLAND 2000 – SQUARE SHAPE SOLUTION Option 4: ENGINEER Trusses w/ Canvas Roof Roof Plan *Intricate roof plan *Canvas Roof *Wood truss members

A-E-C Discussions Will a glass wall hold up in a hurricane? Glass wall is expensive. Cloth roof will not allow MEP system to be located in roof, as typically done. Are wooden columns available in 2’ diameter?

How Much Will These Alternatives Cost?

Cost Breakdown Comparison

Cost Estimates Budget = $ 4.33 MCost = $ M

Cost Estimates Cost = $ MBudget = $ 4.33 M

Cost Estimates Cost = $ M Budget = $ 4.33 M

Cost Estimates Cost = $ MBudget = $ 4.33 M

Site Layout

Palm Grove Existing Parking Lots and Roadways

Job Trailers Mat’ls Laydown Temporary Easement Mobile Crane

Job Trailers Mat’ls Laydown Temp. Easement Mobile Crane

How Long Will It Take?

Wood structure R/C in auditorium: Sequence coordination Pile foundation Schedule Constraints

Duration Calculation Quantity Daily Output RS Means Data

Total Schedule Based on Wood Structure 9.5 month

Comparison Between Options

Schedule Constraints R/C structure Pile foundation Hillside excavation: 3 times backfill after retaining wall

Total Schedule Based on R/C 12 month

Comparison Between Options

Schedule Constraints Steel structure Glass wall in 1 st floor Spiral stair Skylight

Total Schedule Based on steel structure 11.5 month

Comparison Between Options

Schedule Constraints Steel truss Canvas roof: vyl. coated polyester fabric shell

Total Schedule Based on wood structure, canvas roof 9 month

Comparison Between Options

Does it meet affinity requirements? Ridge Square Ridge L-Shape New Square New L-Shape Safe?View requirements? Meet Budget? OPTION COMPARISONS Exciting Statement? Complexity Best Choice

Our Choice

ISLAND 2000 Reasons Owner preferred modern look for school Cost is Right Around Budget (Challenge) Easier Site Access Its OUR Design

Any Questions? Thank You For Your Time