FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic.

Slides:



Advertisements
Similar presentations
N. BlaskovicFONT Meeting1 Preliminary resolution study results N. Blaskovic.
Advertisements

N. BlaskovicFONT Meeting1 November 2013 week 2 FONT shift summary N. Blaskovic.
FONT Meeting1 Calibrations over IP LO power scan N. Blaskovic.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
FONT Meeting1 Waveforms with and without BPFs N. Blaskovic.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
2.4GHz Single Balanced Mixer Andrew Bacon Jacqueline Griffin John Stone.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
N. BlaskovicFONT Meeting1 FONT5 board #2 DAC tests N. Blaskovic.
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
FONT GROUP MEETING RES VS SAMPLE NO. Talitha Bromwich - Monday, 20 July 2015.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
ECE 4710: Lecture #37 1 Link Budget Analysis  BER baseband performance determined by signal to noise ratio ( S / N ) at input to detector (product, envelope,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
FONT Meeting1 Digital signal filtering N. Blaskovic.
Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.
Tests of STO IF Components S. Weinreb April 15, 2009 Two 1-2 GHz IF amplifier plates and one 5 GHz converter plate for the Texas test flight have been.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
FONT Meeting1 3-BPM resolution with digital filtering N. Blaskovic.
CALIBRATIONS IPBPM FILTER TESTS Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich Friday, 1 May Talitha Bromwich, FONT Group Meeting.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
ATF Meeting1 IP BPM studies with Honda’s electronics Neven Blaskovic with Wunghoa Park Oscar Blanco Alexis Gamelin N. Blaskovic.
1/33Mikey Davis24 January 2013 Review of 23 rd of January Shift.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
N. BlaskovicFONT Meeting1 Feedforward runs N. Blaskovic.
FONT Oxford FONT REPORT NOVEMBER Neven Blaskovic Kraljevic and Talitha Bromwich Friday, 27 November
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
N. Blaskovic, T. Bromwich, R. Ramjiawan
Roundup of Week at ATF Mikey Davis 19 April /26.
NSG 4070 Signal generator and immunity test system Dr. Heinrich
Communication 40 GHz Anurag Nigam.
Siwon Jang Hoyeong Jeong Glenn Christian Talitha Bromwich
Further Tracking Studies and March Trip Plan
Resolution Study T. Bromwich FONT 8 September 2017.
N. Blaskovic, T. Bromwich, P. Burrows, G. Christian, C. Perry, R
Alternative BPM Processing Scheme – May08 Demo
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
Feedforward runs N. Blaskovic N. Blaskovic FONT Meeting.
ATF cable plan N. Blaskovic N. Blaskovic FONT Meeting.
KNU IP-BPM and Reference cavity
CLIC Workshop 2016: Main Beam Cavity BPM
Analysis of March ATF Run
N. Blaskovic, T. Bromwich & G. Christian
ATF Shift Plans Rebecca, Talitha 08/09/2017 Friday, 08 September 2017
Receiver Performance & Characteristics
March Trip Plan Mikey Davis 01 March /7.
Revised ATF Shift Plans
Progress towards nanometre beam stabilisation at ATF2
Phase Monitor Electronics: Output vs
Progress towards nanometre level beam stabilisation
Phase Feedforward in 2015 & Plans for 2016
Status of Phase Feedforward Tests
FONT stripline BPM resolution
Fitting to the Linear Region of I’/q
Presentation transcript:

FONT Meeting1 Charge normalisation and IP LO power scan N. Blaskovic

Contents Jitter dependence on charge normalisation (using P3 Σ I, IP reference diode or neither) IPC I & Q dependence on LO power level FONT Meeting2N. Blaskovic

Charge normalisation Calibration and jitter runs taken on Waist on IPC in Y Multiple RF variable attenuator settings Upstream and downstream boards set-up Results presented: –Charge normalised using P3 Σ I –Charge normalised using IP reference diode –Not charge normalised FONT Meeting3N. Blaskovic

FONT Meeting4N. Blaskovic

Charge normalisation Charge normalisation appears to worsen jitter, particularly if reference diode is used FONT Meeting5N. Blaskovic

LO power scan Jitter runs taken on Waist on IPC in Y RF variable attenuator set to 10 dB LO level for IPC(Y) electronics changed by 0-11 dB variable attenuator I & Q signals in LO power scan presented FONT Meeting6N. Blaskovic

FONT Meeting7N. Blaskovic IPA IPB IPC Refsplitter electronics attenuator RF variable attenuator diode FONT5 board (digitiser) port 1 port 2 port 1 port 2 port 1 port 2 I Q I Q I Q IP BPM C-band signal Reference C-band signal Base-band signal 6.4 GHz (y) / 5.7 GHz (x) hybrid LO var. atten. LO variable attenuator

FONT Meeting8N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting9N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting10N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting11N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting12N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting13N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting14N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting15N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting16N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting17N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting18N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

FONT Meeting19N. Blaskovic IPC(Y) I IPC(Y) Q Ref(Y)

LO power scan Mixer output should be in region where it does not vary with input LO level; Siwon: FONT Meeting20N. Blaskovic Linear IF output range due to LO input

Next steps FONT Meeting21N. Blaskovic