BOS – Structures Maintenance Fabrication Initiative Richard Marz, PE Chief, Structures Maintenance WisDOT – Bureau of Structures.

Slides:



Advertisements
Similar presentations
District Record Keeping Or How to Keep the Department of State Happy and Ohio-Erie Exchanging Students.
Advertisements

FAA Project - Bidding Phase FAA Recommends.. Consider how you would like to bid the project early on in the design. Due to possible budget constraints.
Understanding Basic Components:
MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager.
Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
RFP Technical Assistance. Thank you for selecting Council on Agings RFP Technical Assistance! Hello! I m Nate, your narrator. I will guide you through.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Global view:  Tool for gathering data  Basis for distribution of funds to districts  Several components: Student & Staff  Tool for comparing effectiveness.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
PPAP Requirements Training
Quality Improvement/ Quality Assurance Amelia Broussard, PhD, RN, MPH Christopher Gibbs, JD, MPH.
File Review Activity Lessons learned through monitoring: Service areas must ensure there is documentation supporting the information reported in the self-
Chapter 3 Project Initiation
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
Medicaid Hospital Utilization Review and DRG Audits: Frequently Asked Questions The Department of Medical Assistance Services Division of Program Integrity.
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
1 Bureau of Education & Testing Continuing Education Unit Ken Lawson, Secretary Gus Ashoo, Bureau Chief.
Keith H. Lundin, Quality Unit-BTS.  Team Mission  Materials Certification Lean Team  Current Status  Materials Certification Issues  Materials Certification.
700 MHz and 800 MHz NPSPAC Regional Planning Process and Procedures Review Presented by Jeannie Benfaida, Program Analyst Policy Division, PSHSB June 29,
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Cobb County School District June 30, Human Resources Employment Process Reorganization.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
 Importance of Material Coordinators  Spec Requirement  CMM Requirement  General Description of Training  Materials Coordinator Learning Objectives.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Human Resources Federal Regulations and Review Findings.
Coordinating the IT in ITS Galen McGill, PE ITS Manager August 18, 2009.
June 10, 2015 PA Planning Team Capital Area Intermediate Unit 15 PRIORITY AND FOCUS CHARTER SCHOOL TRAINING 1.
From Research Prototype to Production
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
1. Proposal deadline 2. Timeline  A grant opportunity announcement will include a sponsor deadline for receipt of the proposal.  The instructions will.
Office of the Vice Chancellor for Research 1 Update on PHS New Rule on Financial Conflicts of Interest (FCOI) Presentation to Business Managers January.
Certificate of Need Online Application/Management System Joint Provider/Surveyor Training March 27, 2008 Michigan Department of Community Health.
Mn/DOT CS Pre-Qualification Best Practices Review August 19, 2002.
DIVISION OF PROGRAM MANAGEMENT. PROGRAM MANAGEMENT UPDATES.
Introduction to the new SHC Health Information Record Manual Presented by Rhonda Anderson, RHIA President Anderson Health Information Systems, Inc
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Define the project identify potential funding sources gather information write and package the proposal submit the proposal to a funder Piece of cake?
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Program Inventory and Program Review for Universities Marti Leisinger and Elenor Buffington, Data Collections June 13,
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
New EMIS Coordinator Training 12/13/13 Presenters: Brenda Hartley – OMERESA EMIS Support Tammy Hrosch – MDECA EMIS Services Manager.
Minister’s Delegate Maintenance (MD-M). 2 Background MPL-15 published December Transport Canada agreed to review and standardize existing procedures.
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
IRB  Keep IRB information for each protocol in a separate folder or separate by dividers  All IRB approvals for treatment and stand alone companions.
TAX-AIDE 4. Certification Process Matt Grogan CO-1 TRS.
Sign Structures Updates: Helpful Tips for Inspectors
Webinar will start in a few moments Hosting Your Own CCO Examinations – Part 1: Written Exams Committed to Quality, Integrity and Fairness in Testing Since.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Department of Public Works Bureau of Design & Construction 2008 Department of Public Works Bureau of Design & Construction 2008 Allen V. Herring, P.E.
1 of (F)DEC2015 IMCOM integrates and delivers base support to enable readiness for a self-reliant and globally-responsive All Volunteer Army WE.
TDOT MODEL APPROVAL POLICY. DRAFT POLICY  TDOT MPO MODEL APPROVAL POLICY.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
The Contract Management Process Post Award Activities.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
Accident Investigation SGRP CD Slide # Meeting 1 Northern Ontario Safety Group.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Norm Gempel, Manager Florida Department of Community Affairs
THE OFFICE OF PROCUREMENT CONTRACT TRAINING MAY 2018
INDUSTRIAL FIREPROOFING Evaluation Services
School Management Monitoring and Evaluation
Presentation transcript:

BOS – Structures Maintenance Fabrication Initiative Richard Marz, PE Chief, Structures Maintenance WisDOT – Bureau of Structures

Richard Marz, PE Chief, Structures Maintenance WisDOT – Bureau of Structures BOS – Structures Maintenance Fabrication Initiative

BOS Fabrication Improvement Process Define the Business Plan for the Shop Fabrication Unit Define unique needs for Mega Projects and Role of Shop Fabrications within Develop organization Chart for the Shop Fabrication Unit Develop clear Roles and Responsibilities of Unit Staff

Gather information : Interviews conducted with Steel Producers and fabricators – CANAN/Structal – Tony Matutis – High Steel, Lancaster PA Ronald Medlock, Vice President – ISC, Gary IN – Francisco Leal – Veritias Steel, Wausau WI Ray Isaelniks, QC Manger

Gather information : Contacted other Departments of Transportations – Florida, Illinois, Indiana, Iowa – Michigan, Minnesota, Ohio, Pennsylvania – Tennessee, Texas

Gather information : Interviewed Bureau of Structures Staff Interviewed Regional WisDoT Staff Interviewed Consultants working on WisDot Mega Projects

Results of Interviews: WisDoT Procedures not well defined Communication concerns No consistency between projects Process differs from state to state Quality Assurance vs. Quality Control

Development of WisDot Process Focus on Quality Assurance Define Core components of WisDot Re – organize the Fabrication Unit Development of a Fabrication manual

Development of WisDot Process Key requirement The Fabricator/Detailer is required to provide a quality control review that includes AT A MINIMUM the items noted in Section 4 of NSBA G1.1. To verify that these checks were performed, the Fabricator/Detailer is required to submit the checklist of review items contained in G1.1 Section 4. The reviewer must initial and date each of the sections, 4.1 – 4.16 verifying that the items in that section were reviewed for accuracy as compared to the design drawings. The reviewer must be a licensed Professional Engineer and must stamp, sign, and date the submitted checklist. (Certificate of Shop Drawing Quality Control) In addition, there will be a location for the GC to sign and date.

Development of WisDot Process TWO LEVELS of SHOP DRAWING REVIEWS – LEVEL 1 All Shop Drawings are required to have the submitted checklist ( Certificate of Shop Drawing Quality Control) completed, signed and submitted by the Fabricator/GC. – LEVEL 2 A percentage of structures will be reviewed based on NSBA shop drawing review guidelines. Selection will be based on a number of factors, including complexity and size.

What is the anticipated timeline for the updated fabrication process?

Phase 1 Anticipated to begin with the May 2015 Letting – All steel fabrication documents will need to be submitted to the SFU utilizing SharePoint. (New) – A Fabricator Quality Management Plan (QMP) and a General Contractor QMP will be required for each WisDOT project. (New) A Shipping Plan, Erection Plan, and Storage Plan will be outlined within the QMP. The intent is document the entire process. (New)

Phase 1 (Cont’d) Anticipated to begin with the May 2015 Letting – Contractor’s submitted checklist (Certificate of Shop Drawing Quality Control) with GC signature will be required for each structure (PE Stamp not required until Phase 2) (New form) – The fabricator will be required to submit regular (weekly) updates (Fabrication Project Status Record) listing deliverables and anticipated submission dates for the project.(Updated form)

Fabrication Project Status Record Form DT2172, the Fabrication Project Status Record, has been updated to include photos and require a signature by the fabricator QC representative. This form will need to be submitted on a regular (weekly) basis. (Draft)

Contractor’s Shop Drawing Checklist

Phase 2 Phase 2, Beginning with August Let Projects – All phase 1 requirements, PLUS – Contractor’s Shop Drawing Checklist (Certificate of Shop Drawing Quality Control) with PE stamp and GC signature will be required for each structure – Shop drawings submitted with this certificate incomplete, lacking the PE stamp, or missing altogether will not be accepted.

How will fabrication documents be submitted to the SFU? SharePoint, a web application that is used for document and file management. You need no special software, just a login which will be assigned by Bureau of Structures staff. Training will be provided prior to the implementation of SharePoint.

Questions? 1- 26