Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.

Slides:



Advertisements
Similar presentations
Optimisation of New Build Spent Fuel Management and Disposal Peter Haslam Public Policy Advisor Nuclear Industry Association 25 January 2011.
Advertisements

Repository Analysis Review NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Office of National Transportation Update
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
Presented to: National Radiological Emergency Preparedness Conference Presented by: Corinne Macaluso, Transportation Specialist Office of National Transportation.
Environmental Accounting. Discussion Environmental Accounting Overview –What is environmental accounting –Why do environmental accounting –What is an.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Update on Yucca Mountain and Transportation Impacts on Native American Communities Bob Halstead Office of the Governor Nevada Agency for Nuclear Projects.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
The Yucca Mountain Site The U.S. Court of Appeals in Washington, D.C. throws out the EPA's 10,000 year radiation standard for Yucca Mountain,
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Remote-Handled Transuranic Waste Disposition Discussion Meeting of the National Governors’ Association April 12, 2001 U. S. Department of Energy.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
From Research Prototype to Production
1 presented to National Governors Association Federal Facilities Task Force National Transportation Program: A Policy Perspective J. Kent Hancock, Director.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Tom MAZOUR IAEA, Division of Nuclear Power
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Transportation of Radioactive Material in the United States Earl P. Easton.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
Different management SESW 108: Program Development and Management Dr. Kazi Abdur Rouf Instructor Settlement Services Worker Certificate Social Service.
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
Rail Transportation Casks
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
Office of National Transportation Update Presented to: National Spent Nuclear Fuel Program Presented by: Judith Holm, Director Operations Development Division.
September TRTR Conference U.S. Domestic Reactor Conversion Programs Eric Woolstenhulme Dana Meyer.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
November 9, 2005 Thomas Hill, NSNFP DOE Spent Nuclear Fuel Licensing Path Forward PacTec Review of Transportation Strategy for DOE Fuel.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
1 Calcine Disposition Ron Ramsey (Temp) November 8, 2005.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
TRANSPORTATION OF USED FUEL December 2015 Pierre OneidJack Edlow Holtec InternationalEdlow International Company.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Request for Information & Capability Statements Richland Acquisitions Post-FY 2018 November 17-19, 2015.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
PHILIPPINES Report: Policies and implementation strategies on HUMAN RESOURCE DEVELOPMENT to introduce NPPs Adopting RAIS 3.2 AS THE NATIONAL REGISTER OF.
James Shaffner, Project Manager
Air Transport of Commercial Spent Nuclear Fuel (SNF) Assemblies
Transportation of Radioactive Material in the United States
Section 180c Ad Hoc Working Group
Spent Nuclear Fuel and Waste Disposition Program Update
Office of Nuclear Materials Safety and Safeguards
Fall Low Level Waste Forum Meeting
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Presentation transcript:

Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation April 15, 2005 Washington, DC Transportation Infrastructure Development

2 Introduction  The Office of National Transportation (ONT) has made steady progress in establishing the groundwork to develop the transportation infrastructure.  Today, I will address: – Requirements for cask systems; – Cask integration efforts to ensure interface with the Yucca Mountain repository and utility sites; – Capabilities of existing casks to accommodate commercial spent nuclear fuel (SNF) and Department of Energy (DOE) SNF and high-level radioactive waste (HLW); and – Ability of commercial reactor sites to accommodate transportation cask systems.

3 Cask System Requirements  DOE has a preference for purchasing cask systems with current Nuclear Regulatory Commission (NRC) certifications.  DOE has a bias toward cask systems that keep radiation exposure to workers and the public as low as reasonably achievable (ALARA) via design or procedure.  DOE has a preference for cask systems that provide the maximum flexibility in terms of facility and fuel compatibility.  ONT facilitated a meeting to bring the Office of Repository Development (ORD) and cask vendors together to discuss repository and transportation cask interfaces.

4 Transportation Cask Interface with the Repository  The Yucca Mountain repository must receive a license issued by the Nuclear Regulatory Commission (NRC) in accordance with 10 CFR Part 63.  10 CFR Part 71 will govern the transportation casks.  To facilitate waste receipt, coordination efforts are underway to utilize transportation casks that will be compatible with the Yucca Mountain repository. –10 CFR 63 regulations may impose additional performance requirements upon casks utilized at the repository.  We are working with the repository to get data from the cask vendors to make sure the systems are compatible.

5 Cask Acquisition Project Overview FY 2013FY 2003FY 2014FY 2012FY 2011FY 2010FY 2009FY 2008FY 2007FY 2006FY 2005FY 2004 DESIGN & DEVELOPMENTCERTIFICATIONFABRICATION Issue Notice of Program Interest Award Cask Capability Assessment Initiate Cat. B or C Fabrication Begin Category C Deliveries Begin Operations Complete Cask Deliveries Award Design & Certification Begin Category A Deliveries Begin Category B Deliveries Functional Requirements: DOE will refine based on vendor input provided in Cask Capability Assessments (CCA) Designs (preliminary and final): Vendors will generate designs for Category B & C casks (i.e., existing designs w/ modifications and new designs) at a sufficient detail level for NRC certification  Cask Category Definitions: – Category A = Existing NRC-certified cask systems – Category B = Existing NRC-certified cask systems requiring design/certification modifications – Category C = New Cask Systems Vendors will submit licensing applications to the NRC for certification Fabrication may not be initiated until vendors obtain NRC certifications Fabrication and Delivery: Vendors will fabricate and deliver fully certified casks to DOE, based on negotiated schedules Receive CCA Reports Obtain CD-2 Initiate Category A Cask Fabrication Initiate Cask Certification Obtain CD-3

6 Cask Capability Assessment Reports  Purchase orders to perform cask capability assessments (CCA) were placed with vendors possessing NRC Certificates of Compliance (C of C). –All reports were received by August 28.  Vendor meetings held in late August and early September provided an opportunity to discuss the data and the vendors’ ability to meet ONT’s needs. –Vendors explained the analysis and/or modifications necessary to accommodate the maximum amount of the SNF and high-level waste (HLW) inventory.

7 Casks with Existing Certificates (Highlighting indicates casks evaluated by vendors in cask capability assessments.) Cask Models Having Current Transport Certificates of Compliance Storage-Only Cask Models Which May Receive Certification for Transportation MODELC of C No.MODELC of C No. NAC-LWT9225TN-BRP9202 GA-49226TN-REG9206 GE TN NAC-STC9235CASTOR V MP Westinghouse MC HI-STAR CASTOR X NAC-UMS9270NAC-128S/T TS TN TN-FSV9277 TN MP

8 Current Cask Size Envelope  For ORD planning purposes, all new casks purchased will fall within this envelope:

9 Facility Interface Data Sheets Summary  Eighty-nine out of 119 facilities have provided responses to the Facility Interface Data Sheets (FIDS) sent out in March  Although preliminary, FIDS responses point out a number of facility infrastructure limits that will influence cask selection and transportation planning.  About 40 reactor sites are currently anticipated to have a crane capacity of 120 tons or less.  Crane lifting capacity will be a primary factor in determining the type of shipping cask a facility can utilize.

10 Utility Reactor Crane Capacities Number of Reactors Tons

11 Conclusions Regarding Existing Casks’ Ability to Accommodate Commercial SNF  The CCA reports indicated that no single cask could transport more than about 40% of the commercial SNF inventory under the conditions of current C of Cs.  However, analysis of the reports has shown that a suite of casks from several vendors could transport upwards of 60% of the projected commercial inventory.  Preliminary analysis by the vendors indicated that CoCs could be modified to accommodate more than 90% of the commercial SNF inventory, based on SNF characteristics alone.

12 Individual Cask Capabilities Vs Projected Inventory

13 Portion of Total Commercial SNF Inventory Accommodated by Casks

14 54,751 Assemblies Located within Facilities with Infrastructure Limitations ( 38% Eligible Inventory) 43,206 Assemblies Located within Facilities with Adequate Infrastructure ( 30% Eligible Inventory) 7,884 Assemblies Located within Facilities with Infrastructure Limitations ( 6% Eligible Inventory) 37,679 Assemblies Located within Facilities with Adequate Infrastructure ( 26% Eligible Inventory) 97,957 Assemblies Compatible with One or More Current Rail Cask Part 71 CoCs 45,563 Assemblies Not Compatible with a Current Rail Cask Part 71 CoC Assemblies Inadequate Facility Infrastructure Adequate Facility Infrastructure 2010 Eligible Inventory Breakdown

15 Transportation Cask Interface with Commercial Reactor Sites  Preliminary evaluation of available data and information sources indicates that 125-ton transportation casks may not be suitable at a number of sites.  The Department of Energy (DOE) is developing strategies to address these sites, including possible design of smaller, bare fuel transportation cask systems (100-, 70-, or 60- ton, for example).  DOE is also evaluating other concepts or solutions such as utilizing smaller transfer casks to load large transportation casks.

16 Transportation Cask Interface with DOE Sites  Casks exist today that are technically capable of transporting DOE spent nuclear fuel (SNF) and high-level radioactive waste (HLW). –Generally, the thermal, structural, and shielding requirements for commercial SNF bound those of the DOE SNF and HLW.  DOE is developing a performance specification that will delineate the characteristics and parameters of DOE SNF and HLW in order to solicit transportation package designs for this material.

17 Conclusions Regarding DOE SNF and HLW  Casks exist today that are technically capable of transporting DOE SNF and HLW. –Generally, the thermal, structural, and shielding requirements for commercial SNF bound those of the DOE SNF and HLW.  New internal basket designs would be developed to accommodate the DOE canisters. –Certificate modifications will be required for the new baskets.  During the first 5 years of shipping operations, no new (Category C) casks will need to be developed for DOE material.

18 Rolling Stock Performance Requirements  DOE is currently working to meet the Association of American Railroads’ (AAR) Performance Specification, S-2043, for trains used to carry HLW.  ONT has engaged Transportation Technology Center, Inc. (TTCI) to provide preliminary evaluation of several standard and premium railcar truck designs.  Results indicated that off-the-shelf truck designs would not meet all S-2043 requirements.  However, TTCI indicates that specific design and tuning of the trucks and suspensions as part of railcar system should improve results and provide acceptable performance.

19 Nevada Rail Line  Work on the Nevada Rail Alignment Environmental Impact Statement (EIS) is moving forward.  DOE Received over 4,000 comments during scoping meetings.  Several alternative routes were suggested by the public. –The EIS will be delayed slightly to perform engineering work on the alternative routes to evaluate their feasibility.

20 Fleet Management and Support Facilities  Locations of the Fleet Management Facility (FMF) and other support facilities are being evaluated in the Nevada Rail Alignment EIS.  Preliminary work to provide input into the EIS has been performed.  The FMF may be completed after the opening of Yucca Mountain. –Operations can begin using commercially available facilities.

21 Conclusions  ONT has many challenges ahead in procuring the transportation infrastructure to support repository operations.  Many drivers will influence the development of the transportation infrastructure.  ONT is emphasizing flexibility in its procurement approach in order to adapt to external influences and changing requirements.