Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.

Slides:



Advertisements
Similar presentations
TRIUMF UCN workshop, 2007 Solid state physics experiments with UCN E. Korobkina.
Advertisements

The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
ModICE Modular Integrated Connector Enclosure
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
COMPRES 2007 Annual Meeting COMPRES Gas Loading System at APS Progress Report June 2007 Mark Rivers.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Collab 4/15/04 #1 EDMEDM UIUC meeting 12/3/2004 Walter Sondheim, P-25, Los Alamos for presentation to The EDM Collaboration UIUC meeting, Urbana, IL UCN.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Plumbing and Gas, for better optical cryostats Warren Johnson LSU.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
1 FVTX Detector Assembly Stephen Pate New Mexico State University (FVTX Assembly Management WBS 1.7) Stephen Pate, NMSU – FVTX Review – 16-Nov-2009.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab NFMCC at LBNL January 25, 2009.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
NEDM Collaboration Meeting 5/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
Spectrometer Solenoid Design and Test Results Steve Virostek Lawrence Berkeley National Lab Spectrometer Solenoid Review November 18, 2009.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 20,
STORAGE AND MAINTENANCE OF LARGE FARM EQUIPMENT Prepared by : Von G. Peavy South Region Ag Mechanics.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
SPS High Energy LSS5 Thermal contact & cooling aspects
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Final Design Cryogenic and mechanical configurations
Latest results from the superfluid-helium UCN source SUN2 at ILL
Design of the Injection Can
ModICE Modular Integrated Connector Enclosure
TAXS and TAXN ABSORBERS - OVERVIEW
Ti/SS transitions A.Basti INFN-PISA*
Performance of an Automated Water Based Cooling System for CBM MuCh
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
FP420 Detector Cooling Thermal Considerations
Replacement of a Leaking Beam Port Bellows
Recirculating CO2 System
neutron lifetime experiments
Chapter 8 Heat Transfer.
collectors, operation and layout
Presentation transcript:

Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 7, 2007 Preparations for the next UCN storage time measurement

Collab Store 6/6/07 #2 EDMEDM Outline I)Review II)New Assembly III)Schedule

Collab Store 6/6/07 #3 EDMEDM Storage Time  in a Bottle

Collab Store 6/6/07 #4 EDMEDM Experimental Layout in Area B UCN Coat with UCN absorber Switch Diamond coated guide 1/2" hole

Collab Store 6/6/07 #5 EDMEDM 3D Storage Cell LN 2 Cryosat

Collab Store 6/6/07 #6 EDMEDM 1/Fill Time = Production Rate - Loss Rate Absorption Time 1/Detector Loss Rate Storage Time UCN Storage Time Measurement

Collab Store 6/6/07 #7 EDMEDM UCN Stored for 100 s Time (s) Counts (/s) UCN filling from SD 2 source Bottle sealed and source off UCN from bottle

Collab Store 6/6/07 #8 EDMEDM Mechanism inside the Vacuum Vessel UCN from SD 2 Source Cooling Lines Shutter Mechanism Encased Storage Cell Shutter Block Part of Radiation Shield Floor of Vacuum Vessel

Collab Store 6/6/07 #9 EDMEDM Shutter Open

Collab Store 6/6/07 #10 EDMEDM Shutter Aligned

Collab Store 6/6/07 #11 EDMEDM Shutter Closed

Collab Store 6/6/07 #12 EDMEDM Shutter Seal

Collab Store 6/6/07 #13 EDMEDM Entry to Enclosed Box

Collab Store 6/6/07 #14 EDMEDM Cell Drawing

Collab Store 6/6/07 #15 EDMEDM Corner Detail

Collab Store 6/6/07 #16 EDMEDM Corner Mating

Collab Store 6/6/07 #17 EDMEDM Coating Working with LANL polymer chemists Spray coating does not yet work Wipe on deuterated styrene – 2 coats Performed a crazing test with 2 cycles to 77 K Trying to decide how to make sure no spots are missed

Collab Store 6/6/07 #18 EDMEDM Temperature Unsure in previous test what temperature was on the inside of the cell since diode was on cooling plate with only partial coverage of cell Performing a test on old cell with diodes in a number of strategic locations New cell cooling scheme to get better thermal contact Performing a test with new cooling configuration Temperature cycle will include a bake out under vacuum at about 50 ° C for several days prior to any measurements

Collab Store 6/6/07 #19 EDMEDM Enclose Box

Collab Store 6/6/07 #20 EDMEDM Cooling Detail Spring loaded Al cooling plate Copper Mesh Thin copper Transfer sheet

Collab Store 6/6/07 #21 EDMEDM Schedule Very uncertain due to UCNA requirements One run of 3-4 days in late June to mid-July A second run of 3-4 days about a month after the first run